107750-0272 ZEXEL F 01G 09P 1GK BOSCH INJECTOR f01g09p1gk 1077500272


 

Information injector

BOSCH F 01G 09P 1GK f01g09p1gk
ZEXEL 107750-0272 1077500272
107750-0272 INJECTOR
Rating:
48
Buy INJECTOR 107750-0272 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
107750-0272 
F 01G 09P 1GK 
   
INJECTOR
55KE INJECTOR
107750-0272 
107750-0273 
F 01G 09P 1GK 
236700N020B  TOYOTA
INJECTOR
* C 55KE INJECTOR




Information:

1. Remove bolts (1) that hold plate (2), and remove the plate. 2. Remove bolts (3) and (4) that hold the cylinder head assembly to the cylinder block.3. Fasten a hoist, and remove the cylinder head assembly. The weight is approximately 135 kg (300 lb.).
Do not put the cylinder head assembly down on a flat surface. This can cause damage to the fuel injection valves.
4. Remove the gasket, seals (5) and O-ring seals (6) from the spacer plate. The following steps are for installation of the cylinder head. Be sure a new gasket has been installed between the spacer plate and the cylinder block. See the topic, Remove And Install Spacer Plate.5. Thoroughly clean the spacer plate and the bottom surface of the cylinder head assembly. Install a new head gasket, new seals (5) and two O-ring seals (6).6. Fasten a hoist, and put the cylinder head assembly in position on the cylinder block. 7. Put clean engine oil on the threads of the cylinder head bolts. Install the cylinder head bolts and washers. Tighten the bolts in sequence shown.a. Tighten bolts 1 through 20 in number sequence to a torque of 270 25 N m (200 18 lb.ft.).b. Tighten bolts 1 through 20 in number sequence to a torque of 450 20 N m (330 15 lb.ft.).c. Tighten bolts 1 through 20 in number sequence to a torque of 450 20 N m (330 15 lb.ft.) by hand.d. Install the rocker shaft assemblies and push rods. See the topic, Install Rocker Shaft Assemblies And Push Rods.e. Tighten bolts 21 through 26 in number sequence to a torque of 270 25 N m (200 18 lb.ft.).f. Tighten bolts 21 through 26 in number sequence to a torque of 450 20 N m (330 15 lb.ft.).g. Tighten bolts 21 through 26 in number sequence to a torque of 450 20 N m (330 15 lb.ft.) by hand.h. Tighten the 3/8" bolts (5) to a torque of 43 7 N m (32 5 lb.ft.). If the studs for the exhaust manifold were removed, install new studs, and tighten them to a torque of 25 4 N m (18 3 lb.ft.).8. Make an adjustment to the valves to have a clearance of 0.38 mm (.015 in.) for intake and 0.76 mm (.030 in.) for exhaust. Tighten the locknuts for the valve adjustment screws to a torque of 28 4 N m (21 3 lb.ft.).9. Install the valve cover bases and the inner fuel lines. See the topic, Install Rocker Shaft Assemblies And Push Rods.10. Install the valve covers. See Install Valve Covers.11. Install plate (2).End By:a. install aftercooler housingb. install exhaust manifoldc. install fuel injection linesd. install water temperature regulator

Have questions with 107750-0272?





Group cross 107750-0272 ZEXEL

Toyota 

 
236700N020 
INJECTOR
0 445 110 214 
236700N020A 
INJECTOR

Bosch 

0 445 110 214 
0445110214 
INJECTOR
107750-0272  
F 01G 09P 1GK 
 
INJECTOR

Toyota 

107750-0272  

107750-0273 
F 01G 09P 1GK 
236700N020B 
INJECTOR
 
236700N020B 
INJECTOR
 
236700N020C 
INJECTOR
Back to top