101609-9100 ZEXEL F 019 Z20 037 BOSCH INJECTION-PUMP ASSEMBLY f019z20037 1016099100


 

Information injection-pump assembly

BOSCH F 019 Z20 037 f019z20037
ZEXEL 101609-9100 1016099100
101609-9100 INJECTION-PUMP ASSEMBLY
Rating:
36
Buy INJECTION-PUMP ASSEMBLY 101609-9100 zexel genuine, new aftermarket engine parts with delivery

Include in #2:

Cross reference number

BOSCH F 019 Z20 037 f019z20037
ZEXEL 101609-9100 1016099100


Zexel num
Bosch num
Firm num
Name
101609-9100 
F 019 Z20 037 
  DPICO
INJECTION-PUMP ASSEMBLY
DB58TI Q

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   131424-1520
Overflow valve opening pressure kPa   157 123 191
Overflow valve opening pressure kgf/cm2   1.6 1.25 1.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-5-3-6- 2-4
Pre-stroke mm   3.8 3.75 3.85
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-5
deg.   60 59.5 60.5
Difference between angles 2
Cal 1-3
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cyl.1-2
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-4
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   A
Rack position   9.7
Pump speed r/min   1000 1000 1000
Average injection quantity mm3/st.   93 91.5 94.5
Max. variation between cylinders %   0 -2.5 2.5
Basic   *
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   -
Rack position   6.7+-0.5
Pump speed r/min   550 550 550
Average injection quantity mm3/st.   19.5 18.2 20.8
Max. variation between cylinders %   0 -14 14
Fixing the rack   *
Remarks
Adjust only variation between cylinders; adjust governor according to governor specifications.
 
Injection quantity adjustment_03
Adjusting point   D
Rack position   -
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   75 75 95
Fixing the lever   *
Rack limit   *

Test data Ex:

Governor adjustment

Test data 101609-9100
N:Pump speed R:Rack position (mm) (1)Target notch: K (2)Tolerance for racks not indicated: +-0.05mm. (3)Do not adjust boost compensator spring. (4)RACK LIMIT (5)Set idle sub-spring (6)Main spring setting
----------
K=14
----------

Speed control lever angle

Test data 101609-9100
F:Full speed I:Idle (1)Stopper bolt setting
----------

----------
a=3deg+-5deg b=15deg+-5deg

Stop lever angle

Test data 101609-9100
N:Pump normal S:Stop the pump. (1)Use the hole at R = aa (2)Speed = bb, rack position = cc (sealed at delivery) (3)Normal
----------
aa=40mm bb=0r/min cc=1-0.5mm
----------
a=44.5deg+-5deg b=(50deg)

0000001501 TAMPER PROOF

Test data 101609-9100
Tamperproofing-equipped boost compensator cover installation procedure (A) After adjusting the boost compensator, tighten the bolts to remove the heads. (1)Before adjusting the governor and the boost compensator, tighten the screw to the specified torque. (Tightening torque T = T1 maximum) (2)After adjusting the governor and the boost compensator, tighten to the specified torque to break off the bolt heads. (Tightening torque T = T2)
----------
T1=2.5N-m(0.25kgf-m) T2=2.9~4.4N-m(0.3~0.45kgf-m)
----------

Timing setting

Test data 101609-9100
(1)Pump vertical direction (2)Position of gear mark 'CC' at No 1 cylinder's beginning of injection (3)B.T.D.C.: aa (4)-
----------
aa=13deg
----------
a=(100deg)




Information:

Start By:a. remove valve covers Call out (1) and (2) are not used in this removal procedure. Call outs begin with number (3). 1. Remove bolts (3) that hold the valve cover bases to the cylinder head assembly. Remove valve cover bases (4).
To prevent damage to the fuel injection nozzle, hold adapter assembly (5) in position at the of injection nozzle (6) when fuel line nut (7) is loosened or tightened.
2. Use Tool (A) and a 7/8 5P0328 Crow Foot ( in) to loosen the fuel injection line nut at the nozzle end. 3. Use Tool (B) to loosen the nut at the fuel injection line adapter end. Remove inner fuel injection lines (8). Install caps and plugs on all fuel injection line openings to keep dirt out of the fuel system. 4. Remove bolts (9) that hold the rocker shaft assemblies to the cylinder head assembly.5. Remove rocker shaft assemblies (10). 6. Put identification marks on the push rods as to their location in the engine. Remove push rods (11). 7. Put identification marks on the bridges as to their location in the engine. Remove bridges (12) from the dowels on the cylinder head assembly.Install Rocker Shaft Assemblies & Push Rods
1. Put clean engine oil on the bridges and dowels. Install the original bridges in their respective locations. New bridges can be mixed.2. Install bridges (1) on the bridge dowels. While firmly pressing 0.5 to 4.5 kg (1 to 10 lb) straight down on the top contact surface of the bridge, turn the adjusting screw clockwise until contact is made with the valve stem. Turn the screw an additional 1/31/2 20 to 30 degrees ( to of 1 hex on nut). This will straighten the dowel in the guide and compensate for the slack in the threads. Hold the adjusting screw in this position and tighten the locknut to a torque of 30 4 N m (22 3 lb ft). Install the original push rods in their respective locations in the engine. New push rods can be mixed.3. Install push rods (2). 4. Put rocker shaft assemblies (3) in position on the cylinder head assembly.5. Put clean engine oil on the threads of the bolts that hold the rocker shaft assemblies in place. Tighten the bolts first to a torque of 270 25 N m (200 18 lb ft). Start with the bolt in the center of the rocker shaft assembly. Tighten the bolts again to a torque of 450 20 N m (330 15 lb ft). Tighten the bolts again by hand to a torque of 450 20 N m (330 15 lb ft).
Do not cause damage to the O-ring seals on the inner fuel lines.
6. Install inner fuel injection lines (4). Tighten the fuel injection line adapter nuts (5) to a torque 40 7 N m (30 5 lb ft) with Tool (A).
Do not let the tops of the fuel nozzles turn when the fuel

Have questions with 101609-9100?





Group cross 101609-9100 ZEXEL

Dpico 

101609-9100  
F 019 Z20 037 
 
INJECTION-PUMP ASSEMBLY
DB58TI

Mitsubishi-Heav 

9 400 612 369 
3436106010 
INJECTION-PUMP ASSEMBLY
S6K-T
9 400 612 037 
3436105080 
INJECTION-PUMP ASSEMBLY
S6K

Dpico 

F 019 Z20 038 
 
INJECTION-PUMP ASSEMBLY
DB58TI
F 019 Z20 039 
 
INJECTION-PUMP ASSEMBLY
DB58T

Mitsubishi-Heav 

9 400 612 211 
3436115070 
INJECTION-PUMP ASSEMBLY
S6K-T
9 400 612 695 
3436128030 
INJECTION-PUMP ASSEMBLY
S6K
9 400 612 696 
 
INJECTION-PUMP ASSEMBLY
9 400 612 803 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi-Heav 

9 400 612 950 
3436501010 
INJECTION-PUMP ASSEMBLY
S6K-T
9 400 615 919 
3436501011 
INJECTION-PUMP ASSEMBLY
S6K-T
9 400 612 697 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi-Heav 

9 400 612 804 
3436106040 
INJECTION-PUMP ASSEMBLY
S6K-T
 
3436501030 
INJECTION-PUMP ASSEMBLY
S6K
9 400 615 920 
3436501031 
INJECTION-PUMP ASSEMBLY
S6K
F 019 Z20 040 
3436501032 
INJECTION-PUMP ASSEMBLY
S6K-T
 
3436501033 
INJECTION-PUMP ASSEMBLY
S6K-T