101609-3500 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1016093500


 

Information injection-pump assembly

ZEXEL 101609-3500 1016093500
101609-3500 INJECTION-PUMP ASSEMBLY
Rating:
41
Buy INJECTION-PUMP ASSEMBLY 101609-3500 zexel genuine, new aftermarket engine parts with delivery

Service parts 101609-3500 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101061-9990
3. GOVERNOR 105404-5580
4. SUPPLY PUMP 105220-5960
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY
11. Nozzle and Holder
12. Open Pre:MPa(Kqf/cm2) 21.6{220}
13. NOZZLE-HOLDER
14. NOZZLE
15. NOZZLE SET

Include in #1:

101609-3500 as INJECTION-PUMP ASSEMBLY

Include in #2:

Cross reference number

ZEXEL 101609-3500 1016093500


Zexel num
Bosch num
Firm num
Name
101609-3500 
 
   
INJECTION-PUMP ASSEMBLY
14BE INJECTION PUMP ASSY PE6A PE

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   131424-3420
Overflow valve opening pressure kPa   255 221 289
Overflow valve opening pressure kgf/cm2   2.6 2.25 2.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-5-3-6- 2-4
Pre-stroke mm   2.5 2.45 2.55
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-5
deg.   60 59.5 60.5
Difference between angles 2
Cal 1-3
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cyl.1-2
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-4
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   A
Rack position   9.7
Pump speed r/min   1000 1000 1000
Average injection quantity mm3/st.   92 91 93
Max. variation between cylinders %   0 -2.5 2.5
Basic   *
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   C
Rack position   6.9+-0.5
Pump speed r/min   515 515 515
Average injection quantity mm3/st.   14 13 15
Max. variation between cylinders %   0 -15 15
Fixing the rack   *
Injection quantity adjustment_03
Adjusting point   D
Rack position   -
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   70 70 80
Fixing the lever   *
Rack limit   *

Test data Ex:

Governor adjustment

Test data 101609-3500
N:Pump speed R:Rack position (mm) (1)Target notch: K (2)Tolerance for racks not indicated: +-0.05mm. (3)Adjust the secondary timing before adjusting the governor. (4)RACK LIMIT (5)Rack difference between N = N1 and N = N2
----------
K=16 N1=1000r/min N2=675r/min
----------

Speed control lever angle

Test data 101609-3500
F:Full speed I:Idle (1)Stopper bolt setting
----------

----------
a=15deg+-5deg b=26deg+-5deg

Stop lever angle

Test data 101609-3500
N:Pump normal S:Stop the pump. (1)No return spring
----------

----------
a=0deg+-5deg b=53deg+-5deg

Timing setting

Test data 101609-3500
(1)Pump vertical direction (2)Key groove position at No. 1 cylinder's beginning of injection position (at BTDC: aa). (3)Position of the key groove of the No. 1 cylinder at B.T.D.C. bb (fix the governor flyweight at this position for delivery). (4)B.T.D.C.: aa (5)At second timing adjustment, set the camshaft at the * position and tighten the flyweight locknut. (6)Align the flyweight's timing gear position with the lockpin groove and then fully tighten the flyweight to the camshaft. (7)Remove the lock pin and adjust the governor. Reinstall the lock pin to fix the flyweight for delivery.
----------
aa=17deg bb=0deg
----------
a=54deg54min+-3deg b=8deg30min+-30min




Information:

Action Required
See the attached procedure.
Service Claim Allowances
Group 1 Affected Product
All Group 2 Affected Product
This is a 1-hour job.
All Group 3 Affected Product
This is a .3-hour job. Submit a supplemental claim for Group 3 if a claim for Group 1 or 2 has already been submitted.
Parts Disposition
Handle the parts in accordance with your Warranty Bulletin on warranty parts handling.
Attach. (1-Rework Procedure)Rework Procedure
Refer to the following instructions and illustrations. Replace the existing fuel lines and their related parts with the new fuel line groups.
To insure correct clamp locations, install left and right fuel line groups as assembled. However, if clamps are removed, mark locations to insure correct positions when reassembling.
On the 992C Wheel Loader, it is necessary to remove the 6N8322 Air Outlet Tube Assembly to be able to install the right bank fuel line group.
Tighten the fuel line clamp screws to a torque of 2.25 N m (20 lb in). Do not over tighten. Use a 6V6069 Torque Screwdriver or similar tool to tighten the screws.
Group 1 Procedure
1. Clean and paint the new 6I0361 and 7E3539 Fuel Line Groups before proceeding to the job site.A) "Tape Off" the number 3, 5, and 6 fuel lines in the area of the tower clamp. (See Illustration 1 - Part 4 of 5, Section C-C)B) Install 5F2807 Plastic Caps and 2F2990 Plastic Plugs on the ends of the fuel lines.C) Clean and paint the fuel line groups.D) After drying completely, remove the tape. Do not remove the plastic caps and plugs until the fuel lines are ready to be installed on the engine. Transport the fuel line groups in their original boxes.2. Remove all mounting bolts from the fuel line brackets at the aftercooler housing. Except for the tower clamp assembly, new mounting bolts and washers will be used. Keep the washers. The washers may be needed later as spacers.3. A) Disassemble the tower clamp assembly behind the fuel injection pump. The 9Y3356 Clamp and 9Y3359 Clamp As. that form the tower clamp will be reused. (See Illustration 1 - Part 4 of 5, Section C-C)B) Disconnect the 2 line clamps from the 9Y3361 Bracket (Front V Bracket).C) Disconnect the 6 line clamps from the 7E5779 Bracket (Large V Bracket).4. Disconnect all the fuel lines at the fuel injection pump and at the adaptors in the valve cover bases.5. A) Remove the left and right side fuel line groups as separate assemblies.B) Remove the 9Y3361 Bracket (Front V Bracket). Replace it with a new 6I0347 Bracket.6. Remove the plastic caps and plugs from the fuel lines. Set the new 6I0361 Fuel Lines Group (left side) and the new 7E3539 Fuel Lines Group (right side) in place and hand tighten the fuel nuts. (See Illustration 1 - Part 1 of 5). If any of the ends of the individual fuel lines are not square with the bonnets in the fuel injection pump or with the adaptors in the valve cover bases, gently bend the lines by hand to align the

Have questions with 101609-3500?





Group cross 101609-3500 ZEXEL

101609-3500  
 
 
INJECTION-PUMP ASSEMBLY

Komatsu 

9 400 615 908 
3863866 
INJECTION-PUMP ASSEMBLY
S6D102E
9 400 615 908 
6735711411 
INJECTION-PUMP ASSEMBLY
S6D102E
9 400 615 909 
3863867 
INJECTION-PUMP ASSEMBLY
S6D102E
9 400 615 909 
6735711441 
INJECTION-PUMP ASSEMBLY
S6D102E
9 400 615 910 
3863881 
INJECTION-PUMP ASSEMBLY
S6D102E
9 400 615 910 
6735711470 
INJECTION-PUMP ASSEMBLY
S6D102E
9 400 611 525 
6221731230 
INJECTION-PUMP ASSEMBLY
S6D108E
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Komatsu 

9 400 612 000 
3863886 
INJECTION-PUMP ASSEMBLY
SA6D102E
9 400 612 000 
6736711170 
INJECTION-PUMP ASSEMBLY
SA6D102E
 
 
INJECTION-PUMP ASSEMBLY

Komatsu 

9 400 615 911 
3863966 
INJECTION-PUMP ASSEMBLY
SA6D102E
9 400 615 911 
6736711310 
INJECTION-PUMP ASSEMBLY
SA6D102E
9 400 611 832 
3863970 
INJECTION-PUMP ASSEMBLY
S6D102
9 400 611 832 
6735711490 
INJECTION-PUMP ASSEMBLY
S6D102
9 400 613 057 
4063210 
INJECTION-PUMP ASSEMBLY
6BTAA
Back to top