101609-3222 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1016093222 6735711160


 

Information injection-pump assembly

ZEXEL 101609-3222 1016093222
KOMATSU 6735711160 6735711160
101609-3222 INJECTION-PUMP ASSEMBLY
Rating:
57
Buy INJECTION-PUMP ASSEMBLY 101609-3222 zexel genuine, new aftermarket engine parts with delivery

Service parts 101609-3222 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101061-9990
3. GOVERNOR 105404-5112
4. SUPPLY PUMP 105220-5960
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY
11. Nozzle and Holder
12. Open Pre:MPa(Kqf/cm2) 21.6{220}
13. NOZZLE-HOLDER
14. NOZZLE
15. NOZZLE SET

Include in #1:

101609-3222 as INJECTION-PUMP ASSEMBLY

Include in #2:

Cross reference number

ZEXEL 101609-3222 1016093222
KOMATSU 6735711160 6735711160


Zexel num
Bosch num
Firm num
Name
101609-3222 
101609-3223 
 
6735711160  KOMATSU
INJECTION-PUMP ASSEMBLY
S6D102E * K

Calibration Data:

Adjustment conditions
Test oil
...
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   131424-3420
Overflow valve opening pressure kPa   255 221 289
Overflow valve opening pressure kgf/cm2   2.6 2.25 2.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-5-3-6- 2-4
Pre-stroke mm   2.5 2.45 2.55
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-5
deg.   60 59.5 60.5
Difference between angles 2
Cal 1-3
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cyl.1-2
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-4
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   A
Rack position   9.5
Pump speed r/min   1200 1200 1200
Average injection quantity mm3/st.   72 71 73
Max. variation between cylinders %   0 -2.5 2.5
Basic   *
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   D
Rack position   8.2+-0.5
Pump speed r/min   385 385 385
Average injection quantity mm3/st.   9.5 8.5 10.5
Max. variation between cylinders %   0 -15 15
Fixing the rack   *
Injection quantity adjustment_03
Adjusting point   E
Rack position   -
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   70 70 80
Fixing the lever   *
Rack limit   *

Test data Ex:

Governor adjustment

Test data 101609-3222
N:Pump speed R:Rack position (mm) (1)Target notch: K (2)Tolerance for racks not indicated: +-0.05mm. (3)RACK LIMIT (4)Rack difference between N = N1 and N = N2 (5)Adjust the secondary timing before adjusting the governor.
----------
K=5 N1=1200r/min N2=500r/min
----------

Speed control lever angle

Test data 101609-3222
F:Full speed I:Idle (1)Stopper bolt setting
----------

----------
a=11deg+-5deg b=26deg+-5deg

Stop lever angle

Test data 101609-3222
N:Pump normal S:Stop the pump. (1)No return spring
----------

----------
a=0deg+-5deg b=53deg+-5deg

Timing setting

Test data 101609-3222
(1)Pump vertical direction (2)Key groove position at No. 1 cylinder's beginning of injection position (at BTDC: aa). (3)Position of the key groove of the No. 1 cylinder at B.T.D.C. bb (fix the governor flyweight at this position for delivery). (4)B.T.D.C.: aa (5)At second timing adjustment, set the camshaft at the * position and tighten the flyweight locknut. (6)Align the flyweight's timing gear position with the lockpin groove and then fully tighten the flyweight to the camshaft. (7)Remove the lock pin and adjust the governor. Reinstall the lock pin to fix the flyweight for delivery.
----------
aa=18deg bb=0deg
----------
a=54deg54min+-3deg b=9deg+-30min




Information:

1. Remove the fuel injection lines. It is not necessary to remove the fuel transfer pump, the fuel injection pump housing and governor to remove the fuel injection pumps. 2. Remove cover (1). 3. Move the rack until tool (A) can be installed to hold the rack in the center position. The rack must be in the center position to remove the fuel injection pumps.4. Use tool (B) to remove bushing (2). 5. Install tool (C) on the bonnet and remove the fuel injection pump. 6. Remove spacer (3) from the fuel injection pump housing. Spacers (3) are the same thickness for each fuel injection pump so they can be mixed. The fuel injection pump plungers and barrels are sets and can not be mixed.Install Fuel Injection Pumps
1. Install spacer (1) in the fuel injection pump housing. 2. Move the rack until tool (A) can be installed to hold the rack in the center position. The rack must be in the center position to install the fuel injection pumps.3. Turn the camshaft until the lobe of the camshaft is down for the pump to be installed. 4. Install tool (B) on the bonnet of the fuel injection pump. Put clean oil on O-ring seal (4) and install the O-ring seal and bushing (5) over tool (B) as shown. 5. Install the fuel injection pump in the pump housing with saw cut (slot) (3) in the gear in alignment with small pin (2) in the lifter assembly and groove (7) in the barrel in alignment with large pin (6) in the pump housing.6. Push down on tool (B) and tighten bushing (5) by hand until the bushing is even with the top of the housing. If installation of the bushing can not be made this far by hand, remove it. Remove the pump, put the parts in alignment again and install the bushing again.
If installation of pump is correct, the bushing can be tightened by hand until it is even with the face of the pump housing.
7. Remove tool (B) and install tool (C) in the bushing. Use tool (C) and a torque wrench to tighten the bushing to a torque of 165 14 N m (120 10 lb. ft.).8. Remove tools (C) and (A). Install the cover on the fuel injection pump housing.9. Install the fuel injection lines. Tighten the fuel injection line nuts to a torque of 41 7 N m (30 5 lb.ft.).Disassemble Fuel Injection Pumps
start by:a) remove fuel injection pumps
Be careful when the injection pumps are disassembled. Do not damage the surfaces of the plungers, barrels and bonnets. Any scratches will cause leakage inside the fuel injection pump. The plunger and barrel for each pump are made as a set. Do not put the plunger of one pump in the barrel of another pump. If one part has wear, install a complete new pump assembly. Be careful when the plunger is put into the bore of the barrel.
1. Pull plunger (1)

Have questions with 101609-3222?





Group cross 101609-3222 ZEXEL

 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Komatsu 

101609-3222  

101609-3223 
 
6735711160 
INJECTION-PUMP ASSEMBLY
S6D102E
9 400 610 776 
3863536 
INJECTION-PUMP ASSEMBLY
S6D102E
9 400 610 776 
6735711161 
INJECTION-PUMP ASSEMBLY
S6D102E
Back to top