101402-3882 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1014023882


 

Information injection-pump assembly

ZEXEL 101402-3882 1014023882
101402-3882 INJECTION-PUMP ASSEMBLY
Rating:
12
Buy INJECTION-PUMP ASSEMBLY 101402-3882 zexel genuine, new aftermarket engine parts with delivery

Service parts 101402-3882 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101041-9220
3. GOVERNOR 105404-5180
4. SUPPLY PUMP 105220-5960
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY
11. Nozzle and Holder
12. Open Pre:MPa(Kqf/cm2) 21.6{220}
13. NOZZLE-HOLDER
14. NOZZLE
15. NOZZLE SET

Include in #1:

101402-3882 as INJECTION-PUMP ASSEMBLY

Cross reference number

ZEXEL 101402-3882 1014023882


Zexel num
Bosch num
Firm num
Name
101402-3882 
 
   
INJECTION-PUMP ASSEMBLY

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   131424-3420
Overflow valve opening pressure kPa   255 221 289
Overflow valve opening pressure kgf/cm2   2.6 2.25 2.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-3-4-2
Pre-stroke mm   2.5 2.45 2.55
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-3
deg.   90 89.5 90.5
Difference between angles 2
Cal 1-4
deg.   180 179.5 180.5
Difference between angles 3
Cyl.1-2
deg.   270 269.5 270.5
Injection quantity adjustment
Adjusting point   A
Rack position   9.4
Pump speed r/min   1050 1050 1050
Average injection quantity mm3/st.   90 89 91
Max. variation between cylinders %   0 -2.5 2.5
Basic   *
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   -
Rack position   7+-0.5
Pump speed r/min   480 480 480
Average injection quantity mm3/st.   12.5 11.5 13.5
Max. variation between cylinders %   0 -15 15
Fixing the rack   *
Remarks
Adjust only variation between cylinders; adjust governor according to governor specifications.
 
Injection quantity adjustment_03
Adjusting point   D
Rack position   -
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   90 90 100
Fixing the lever   *
Rack limit   *

Test data Ex:

Governor adjustment

Test data 101402-3882
N:Pump speed R:Rack position (mm) (1)Notch fixed: K (2)Tolerance for racks not indicated: +-0.05mm. (3)The torque control spring does not operate. (4)Adjust the secondary timing before adjusting the governor. (5)RACK LIMIT
----------
K=12
----------

Speed control lever angle

Test data 101402-3882
F:Full speed I:Idle S:Stop (1)At hole above R = aa (center) (2)Speed = bb (push-button power increase) (3)Speed = cc (active mode).
----------
aa=80mm bb=1200r/min cc=1150r/min
----------
a=(34deg)+-5deg b=(17deg)+-3deg c=32deg+-3deg d=(3deg)+-5deg

Timing setting

Test data 101402-3882
(1)Pump vertical direction (2)Key groove position at No. 1 cylinder's beginning of injection position (at BTDC: aa). (3)Position of the key groove of the No. 1 cylinder at B.T.D.C. bb (fix the governor flyweight at this position for delivery). (4)B.T.D.C.: aa (5)At second timing adjustment, set the camshaft at the * position and tighten the flyweight locknut. (6)Align the flyweight's timing gear position with the lockpin groove and then fully tighten the flyweight to the camshaft. (7)Remove the lock pin and adjust the governor. Reinstall the lock pin to fix the flyweight for delivery.
----------
aa=16deg bb=0deg
----------
a=54deg54min+-3deg b=8deg+-30min




Information:


Product smu Caterpillar Dealer Suggested Customer Suggested
Parts Labor Hrs Parts Labor Hrs Parts Labor Hrs
0-4000 100% 7.0 0 0 0 0
4001-8000 50% 3.5 0 0 50% 0
This is a 7.0?hr job.PARTS DISPOSITION
Handle the parts in accordance with your WarrantyBulletin on warranty parts handling.Attach. (1-Rework Procedure)Rework Procedure
The two tests below provide the appropriateinjector troubleshooting and repair steps for injector updates.Test 1: Use "Test for CylinderCutout" to determine if individual injector replacements (using originalinjector part) are needed.Test 2: Use "Test for Leakagefrom Poppet Valve" to determine if full injector sets (using new injectorparts and a software change from the table) are appropriate for repair.Test for Cylinder Cutout:
Warm the engine out of Cold Mode.
Connect Caterpillar Electronic Technician (ET)to the engine while the engine is running.
Ensure that the engine speed is 1200 rpm +/- 125rpm. An extremely rough running engine will need to be diagnosed by othermethods.
Cut out one bank of cylinders.
Engine rpm and the fuel positionon the ET screen at that time.
Cut out one of the remaining cylinders from thecylinder bank that is running. Allow the engine to stabilize and note thefuel position.
Give power back to that cylinder. Allow the engineto stabilize and note the fuel position.
Repeat steps 5 through 6 until the cylinder bankhas been completely checked.
Power all cylinders. Allow the engine to stabilize.
Cut out the other cylinder bank and repeat steps5 through 8.
Repeat steps 4 through 9 with the engine at 2000rpm.
Compare the results from the fuel position fromeach cylinder.
If the cylinder was cut out and the fuel positiondid not change, the cylinder may not have producing power. This cylinderwould be suspect.
When you are finished with the test, decreaseengine rpm to low idle and shut the engine off.
Replace any suspect injector with a similar originalinjector. Install new seals for the injector and the jumper tube duringthis repair. The injector repair procedure is found in Special InstructionREHS0116.
It is also possible that multiple injectors arefunctioning improperly. Complete "Test for Leakage from Poppet Valve" inorder to evaluate potential excessive injector leakage and need for fuelsystem conversion.Test for Leakage from Poppet Valve:
Warm engine out of Cold Mode to normaloperating temperature.
Turn off the engine.
Remove the valve cover bolts in preparation toobserve the injectors. Leave covers in place.
!Personal injury can result from hot oil and components. Do not allowhot oil or components to contact skin.
Restart the engine and run at low idle with noload.
Use the ET service tool in order to perform theoverride test for the injection actuation system. Increase injection actuationpressure to the maximum value.
Observe all of the injectors under each valvecover for leakage at the spill port. A small amount of dripping is acceptable.However, a continuous stream of oil is an indication of excessive leakageof the poppet valve. Only leaks at the spill port are an indication ofexcessive poppet valve leakage.
If multiple injectors are discovered with excessiveleakage from the poppet valve, update the full set of injectors and softwarewith the new version given in this Service Letter. Install new seals forthe injector and the jumper tube during this repair. The injector repairprocedure can be found in Special Instruction REHS0116. The old softwarepart number should be documented for potential future reference.
Before proceeding with updating

Have questions with 101402-3882?





Group cross 101402-3882 ZEXEL

Komatsu 

 
6732711121 
INJECTION-PUMP ASSEMBLY
S4D102E
 
 
INJECTION-PUMP ASSEMBLY
101402-3882  
 
 
INJECTION-PUMP ASSEMBLY

Komatsu 

9 400 613 881 
3863501 
INJECTION-PUMP ASSEMBLY
S4D102E
9 400 613 881 
6732711122 
INJECTION-PUMP ASSEMBLY
S4D102E
Back to top