105952-0960 ZEXEL Cross 1059520960


 

Information

ZEXEL 105952-0960 1059520960
105952-0960 None
Rating:
63
Buy None 105952-0960 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
105952-0960 
 
   





Information:


Rework Procedure
Replacement of Diesel Oxidation Catalyst (DOC):
1. Remove three 222-8823 Bolts and three 232-3209 Washers to separate the 360-8875 Bellows Tube Assembly from the 360-8849 Catalytic Converter Group. Refer to Image1.1.1.
Image1.1.1
2. Loosen the clamp. Remove the DOC from the Catalytic Converter Group. Refer to Images1.2.1 and 1.2.2.
Image1.2.1
Image1.2.2
3. Remove the ring from the DOC. Remove the clamp from the catalytic converter. Refer to Images1.3.1 and 1.3.2.
Image1.3.1
Image1.3.2
4. Remove the five screws and five washers from the insulation around the DOC. Remove the insulation from the DOC. The insulation will be reused. Refer to Images1.4.1 and 1.4.2.
Image1.4.1
Image1.4.2
5. Install the insulation that was removed from the old DOC on to the new DOC. Refer to Image1.5.1.
Image1.5.1
6. Clean the sealing surface of the DOC flange. Clean the sealing surface of the flange on the catalytic converter group. Clean the ring that was removed from the old DOC. Refer to Images1.6.1, 1.6.2, and 1.6.3.
Image1.6.1
Image1.6.2
Image1.6.3
7. Apply seal paste to both sides of the ring, to the flange surfaces of the new DOC, and the catalytic converter. Refer to Image1.7.1.
Note: Make sure to cover the complete ring and flange surfaces with seal paste when applying it.
Image1.7.1
8. Place the ring on the flange of the new DOC. Position the new DOC against the catalytic converter. Refer to Images1.8.1 and 1.8.2.
Image1.8.1
Image1.8.2
9. Orient the DOC so that it will line up correctly with the bellows tube. Install and orient the clamp in order to hold the new DOC in place. Apply sealing paste or high temperature grease to the bolt of the clamp. Tighten the clamp. Then reattach the DOC to the bellows tube. Refer to Image1.9.1.
Image1.9.1
10. Tap the clamp around the circumference to properly seat the clamp. Tighten the clamp to a specified torque of 18 N.m (13.3 ft-lb). Apply sealing paste or high temperature grease to the three 222-8823 Bolts to assemble the bellows. Refer to Image1.10.1.
Image1.10.1
11. Write down the number of active regenerations. This number can be found in the Monitor Service Menu in the Aftertreatment Status section. Enter this information to the claim story when you submit your claim. Refer to Image1.11.1.
Image1.11.1

Have questions with 105952-0960?





Group cross 105952-0960 ZEXEL

 
 

9 420 613 250 
 
ACTUATOR

Mitsubishi 

 
ME731891 
ACTUATOR
9 420 613 654 
ME731964 
ACTUATOR
 
ME731881 
ACTUATOR
 
ME731966 
ACTUATOR
9 420 611 068 
ME738719 
ACTUATOR
9 420 613 871 
ME731888 
ACTUATOR
9 420 612 482 
 
ACTUATOR
105952-0960  
 
 

9 420 614 765 
 
ACTUATOR

Mitsubishi 

 
ME731950 
ACTUATOR
9 420 612 210 
ME738467 
ACTUATOR
 
ME731942 
ACTUATOR
9 420 612 211 
ME738716 
ACTUATOR
Back to top