139218-0000 ZEXEL 9 411 610 828 BOSCH UNION NUT 9411610828 1392180000


 

Information union nut

BOSCH 9 411 610 828 9411610828
ZEXEL 139218-0000 1392180000
139218-0000 UNION NUT
Rating:
83
Buy UNION NUT 139218-0000 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
139218-0000 
9 411 610 828 
   
UNION NUT
C 90HY NUT Standard parts Others




Information:


Illustration 1 g00565418
4W-8471 Time Delay Relay
Use a 6V-7070 Digital Multimeter, a stopwatch, and a battery (8 volts to 40 volts) for this test.
Connect the positive lead of the voltage source to terminal (TD-4) of the time delay relay. Connect the negative lead to terminal (TD-3). If the test is done on an engine, the start/stop switch must be in the STOP position in order to power terminal (TD-6). All connections must be maintained until the tests are completed.
Use the multimeter to determine continuity. Compare the measurements to the following table.
Table 1
Terminals     Relay Position    
5-6     Closed    
6-7     Open    
Connect the positive lead of the voltage source to terminal (TD-1). If the time delay relay is tested on the engine do not leave the voltage source hooked to terminal (TD-1) for more than 60 seconds. The fuel shutoff solenoid will be energized. Use the multimeter to determine continuity. Compare the measurements to the following table.
Table 2
Terminals     Relay Position    
5-6     Open    
6-7     Closed    
Remove the positive lead of the voltage source from terminal (TD-1). Use the stopwatch to measure the time that is needed for the position of the relay to change. Use the multimeter to determine continuity. Compare the measurements to the following table.
Table 3
Terminals     Delay Time of Relay Position    
0 to 60 seconds 80 seconds or more    
5-6     Open     Closed    
6-7     Closed     Open    Note: If a jumper is normally installed across terminals (TD-2) and (TD-3), the jumper must be removed before performing Step 5.
Connect the positive lead of the voltage source to terminal (TD-2). If the time delay relay is tested on the engine, do not leave the voltage source on terminal (TD-2) for more than 60 seconds. The fuel shutoff solenoid will be energized. Use the stopwatch to measure the time that is needed for the position of the relay to change. Use the multimeter to determine continuity. Compare the measurements to the following table.
Table 4
Terminals     Delay Time of Relay Position    
0 to 8 seconds 10 seconds or more    
5-6     Closed     Open    
6-7     Open     Closed    
Remove the positive lead of the voltage source from terminal (TD-1). Use the stopwatch to measure the time that is needed for the position of the relay to change. Use the multimeter to determine continuity. Compare the measurements to the following table.
Table 5
Terminals     Delay Time of Relay Position    
0 to 60 seconds 80 seconds or more    
5-6     Open     Closed    
6-7     Closed     Open    
Remove the voltage source from terminal (TD-4). Use the multimeter to determine continuity. Compare the measurements to the following table.
Table 6
Terminals     Relay Position    
5-6     Closed    
6-7     Open    

Have questions with 139218-0000?





Group cross 139218-0000 ZEXEL

139218-0000  
9 411 610 828 
 
UNION NUT
Back to top