134200-1220 ZEXEL 9 411 611 643 BOSCH TAPPET 9411611643 1342001220 1156220090


 

Information tappet

BOSCH 9 411 611 643 9411611643
ZEXEL 134200-1220 1342001220
ISUZU 1156220090 1156220090
134200-1220 TAPPET
Rating:
46
Buy TAPPET 134200-1220 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
134200-1220 
9 411 611 643 
1156220090  ISUZU
TAPPET
K 14GV TAPPET Others
134200-1220 
9 411 611 643 
221051460A  HINO
TAPPET
K 14GV TAPPET Others
134200-1220 
9 411 611 643 
ME738049  MITSUBISHI
TAPPET
K 14GV TAPPET Others
134200-1220 
9 411 611 643 
1674599016  NISSAN-DIESEL
TAPPET
K 14GV TAPPET Others




Information:


Before any service work is to be done on the fuel system, the outer surface of the injection pump housing must be clean.
Illustrations show fuel injection pump housing and governor removed from engines. Service work can be done with it installed on engine. 1. Remove the flange (1) and flange assembly (2) from the cover (3).2. Remove the cover from the pump housing by removing seven bolts. 3. Remove the solenoid (4) from the cover.4. Remove cover (6).5. Remove two bolts (5) that hold the cover to the shutoff housing. 6. Remove the cover from the shutoff housing (7). 7. Remove the lever (10) from the shaft (11).8. Remove the shaft (9) from the shutoff housing.9. Remove the lever (8) from the shaft (11).10. Remove the shaft (11) from the shutoff housing.11. Remove the seal (12) from the shutoff housing.Install Shutoff Housing
1. Put 5S1454 Sealing Compound on the outside diameter of the seal and install the seal (1) with tooling (A) in the shutoff housing with the lip toward the outside. The outer face of the seal must be .039 in. (1.0 mm) below the surface of the housing. Remove the extra sealing compound from the housing and the seal after installation. 2. Install the shaft (3) in the shutoff housing.3. Install the lever (5) on the shaft (3).4. Install shaft (2) in the shutoff housing.5. Install the lever (4) on shaft (3). 6. Put the cover (6) in position on the shutoff housing and install two bolts that hold the cover to the housing. 7. Install the cover (8).8. Install the solenoid (7) on the cover.9. Install the cover (6) on the pump housing.10. Install the flange assembly and the flange on the cover.

Have questions with 134200-1220?





Group cross 134200-1220 ZEXEL

Isuzu 

134200-1220  
9 411 611 643 
1156220090 
TAPPET

Hino 

134200-1220  
9 411 611 643 
221051460A 
TAPPET

Mitsubishi 

134200-1220  
9 411 611 643 
ME738049 
TAPPET

Nissan-Diesel 

134200-1220  
9 411 611 643 
1674599016 
TAPPET
Back to top