105220-6760 ZEXEL 9 440 610 821 BOSCH SUPPLY PUMP 9440610821 1052206760 1157501960


 

Information supply pump

BOSCH 9 440 610 821 9440610821
ZEXEL 105220-6760 1052206760
ISUZU 1157501960 1157501960
105220-6760 SUPPLY PUMP
Rating:
43
Buy SUPPLY PUMP 105220-6760 zexel genuine, new aftermarket engine parts with delivery

Scheme ###:

1. [1] 152003-1520 PUMP HOUSING
5. [1] 152100-1120 PUMP PLUNGER
6. [1] 152102-0400 COMPRESSION SPRING
7. [1] 152105-1600 CAPSULE
8. [1] 139526-0000 GASKET
10. [1] 152111-2920 TAPPET
10/2. [1] 152112-1000 ROLLER
10/3. [1] 152113-0100 BEARING PIN
10/4. [2] 152114-0700 SLIDER
14. [2] 152115-0500 VALVE BODY
14. [2] 152115-0500 VALVE BODY
15. [2] 152116-0200 COILED SPRING
15. [2] 152116-0200 COILED SPRING
17. [1] 152118-0900 ADAPTOR
18. [1] 029631-6060 O-RING
19. [1] 029631-6060 O-RING
20. [1] 152121-0200 LOCKING WASHER
25. [1] 152200-6720 HAND PRIMER
30. [1] 152300-7720 EYE BOLT
32. [1] 152300-7720 EYE BOLT
35. [3] 029341-4080 GASKET
36. [3] 029341-4080 GASKET

Cross reference number

Zexel num
Bosch num
Firm num
Name
105220-6760 
105220-7580 
9 440 610 821 
1157501960  ISUZU
SUPPLY PUMP
A * K




Information:


INSTALLING ENGINE TURNING TOOLBoth the inlet and exhaust valves will be closed on compression stroke. First check the bridge adjustment and then the valve lash adjustment. Bridge Adjustment
Check the bridge adjustment screw and locknut for tightness. If the adjusting screw and locknut are tight, proceed with the valve lash adjustment. If the bridge adjusting screw can be turned with a screwdriver without holding the locknut, the bridge requires adjustment. The bridge adjustment must be made before the valve lash is checked for proper clearance.Make bridge adjustment as follows:1. Back off adjusting screw several turns (counterclockwise) making sure it is not in contact with the valve stem.2. Firmly press straight down on the rocker arm above point of contact with bridge.
ADJUSTING BRIDGE3. Turn the adjusting screw clockwise until contact is made with the valve stem, then turn the adjusting screw an additional 30° or 1/12 turn (1/2 the distance between the two points on the locknut).4. Hold the adjusting screw in this position and tighten the locknut to 20 lb. ft. (27.2 N m).
TIGHTENING ADJUSTING SCREW LOCKNUTValve Lash Adjustment
To prevent possible injury, do not use the starter motor to turn the flywheel.Hot engine components can cause burns. Allow additional time for the engine to cool before measuring valve clearance.
Measure the valve lash with the engine stopped. To obtain an accurate measurement, allow at least 20 minutes for the valves to cool to cylinder head and block temperature.
If the valve clearance is within 0.08 mm (.003 in) of the nominal clearance given, adjustment is not required. If the clearance is not within these limits, set the clearance as given in the chart. After checking the bridge adjustment, make the valve lash adjustment.1. With No. 1 piston at TDC on compression, check valve lash between the bridge and rocker arm. See chart for cylinder and valve adjusting sequence.2. To adjust, loosen valve adjusting locknut and turn adjusting screw to allow feeler gauge to pass between top of bridge and the valve rocker arm. Set the inlet valve lash at .015" (0.38 mm) and exhaust valve lash at .030" (0.76 mm). 3. After proper adjustment, tighten the adjusting screw locknut to 22 lb. ft. (29.9 N m) and recheck lash clearance. 4. Turn flywheel 360° in direction of engine rotation. Align flywheel timing bolt with the timing hole in the flywheel. 3408-No. 6 Cylinder will be at TDC on compression stroke (all valves closed)3412-No. 11 Cylinder will be at TDC on compression stroke (all valves closed).5. Check lash and adjust as necessary on all remaining valves, see valve adjusting sequence chart.6. Tighten locknut and recheck lash clearance.7. Remove engine turning tool and install timing access cover, timing bolt and plug.Check Valve Rotation: After checking valve lash and before the valve covers are installed, check the valves for rotation.1. Mark a line on each valve retainer.2. Start the engine and run at low idle.3. Watch the line mark on each valve retainer. Each valve retainer should turn slightly each time the valve

Have questions with 105220-6760?





Group cross 105220-6760 ZEXEL

Isuzu 

9 440 610 792 
8972879860 
SUPPLY PUMP
9 440 610 793 
8973089740 
SUPPLY PUMP
9 440 610 803 
1157501950 
SUPPLY PUMP
9 440 610 806 
 
SUPPLY PUMP

Hino 

9 440 610 805 
NP-FP/KS-ADS 
225602930A 
SUPPLY PUMP

Isuzu 

9 440 610 808 
8973275490 
SUPPLY PUMP
105220-6760  

105220-7580 
9 440 610 821 
1157501960 
SUPPLY PUMP
Back to top