105210-6270 ZEXEL 9 440 610 141 BOSCH SUPPLY PUMP 9440610141 1052106270 8971159711


 

Information supply pump

BOSCH 9 440 610 141 9440610141
ZEXEL 105210-6270 1052106270
ISUZU 8971159711 8971159711
105210-6270 SUPPLY PUMP
Rating:
17
Buy SUPPLY PUMP 105210-6270 zexel genuine, new aftermarket engine parts with delivery

Scheme ###:

1. [1] 152061-0120 PUMP HOUSING
2. [1] 152030-0200 STOP PIN
5. [1] 152100-2301 PUMP PLUNGER
6. [1] 152102-0400 COMPRESSION SPRING
7. [1] 152105-1500 CAPSULE
8. [1] 139526-0000 GASKET
14. [2] 152115-0500 VALVE BODY
14. [2] 152115-0500 VALVE BODY
15. [2] 152116-0200 COILED SPRING
15. [2] 152116-0200 COILED SPRING
16. [1] 152118-0900 ADAPTOR
18. [2] 029631-6060 O-RING
18. [2] 029631-6060 O-RING
25. [1] 152200-6721 HAND PRIMER
30. [1] 152300-5620 EYE BOLT
32. [1] 029111-4050 CAPSULE
33. [1] 152350-7820 PIPE
35. [2] 029341-4080 GASKET
36. [1] 026514-2040 GASKET

Include in #1:

101401-4703 as SUPPLY PUMP

Cross reference number

Zexel num
Bosch num
Firm num
Name
105210-6270 
9 440 610 141 
NP-FP/KEP-A 
8971159711  ISUZU
SUPPLY PUMP
K 14GC FEED PUMP F/P




Information:

Flywheel
Installation of Flywheel Housing
Installation of flywheel housing(1) Install the oil seal to the flywheel housing.(2) Coat the contact surfaces of the crankcase and flywheel with ThreeBond 1104.(3) Align the holes in the flywheel housing and gasket with the dowel pins on the crankcase, and install them to the crankcase.Installation of Flywheel
(1) Install the flywheel to the crankshaft by aligning the hole with the dowel pin on the back-end of the crankshaft.(2) Place the washer and tighten the four bolts to the specified torque.
Installation of flywheelMeasurement of Flywheel Runout
Measure the flywheel runout with the flywheel installed to the crankshaft. If the standard value is exceeded, check the bolts for tightening condition and the mounting face for adhesion of foreign particles.
Measurement of face runout and circular runoutCylinder Head and Valve Mechanisms
Installation of Valve Stem Seal
(1) Apply engine oil to the valve stem, and insert it into the valve guide.(2) Place a new stem seal on the valve guide.(3) Using the stem seal installer, install the stem seal to the valve guide, making use of the valve stem as a guide.
Installation of valve stem sealInstallation of Valves and Valve Springs
(1) Place the valve spring and retainer on the valve guide, and install the valve cotter using the valve spring pusher.
Excessive compression of the valve spring can cause the retainer to contact the stem seal and damage the seal.
Installation of valve and valve spring(2) Using a soft-faced hammer, tap the top of the valve stem several times to make sure that the spring and valve cotter are securely installed.
Confirmation of secure valve cotter installationInstallation of Cylinder Head Gasket
(1) Make sure that the top face of the crankcase and piston upper surfaces are clean and free of dust.(2) Place a new gasket of the crankcase, making sure that the dowel pins on the top face of the crankcase enter the holes in the gasket.
Do not use a liquid gasket.
Installation of cylinder head gasketInstallation of Cylinder Head
Place the cylinder head on the head gasket, making sure that the dowel pins on the top face of the crankcase enters the holes in the cylinder head.
Installation of cylinder head assemblyTightening of Cylinder Head Bolts
Tighten the cylinder head bolts, following the tightening sequence shown in the diagram two or three times before reaching the specified torque.
Cylinder head bolt tightening sequenceAssembly of Rocker Arm and Rocker Shaft Assembly
When installing the rocker arms, make sure that the shaft assembly marks face the front of the engine, as shown in the diagram. After the assembly, make sure that the rocker arms move smoothly.
Assembly of rocker shaft assemblyInstallation of Pushrods
(1) Insert the pushrods in the cylinder head through the pushrod holes.(2) Make sure that the ball end of each pushrod rests securely on the curved surface of the tappet.Installation of Rocker Shaft Assemblies
(1) Install the valve caps.(2) When installing the rocker shaft brackets, tighten the long bolts first, then tighten the short bolts (reversal of removal sequence).
Installation of rocker shaft assemblyAdjustment of Valve Clearances
(1) Confirming the top dead center on the

Have questions with 105210-6270?





Group cross 105210-6270 ZEXEL

Isuzu 

9 440 611 043 
8971315200 
SUPPLY PUMP
9 440 610 432 
NP-FP/KEP-A 
8971265200 
SUPPLY PUMP
9 440 610 291 
NP-FP/KEP-A 
1157501550 
SUPPLY PUMP

Hino 

9 440 610 268 
NP-FP/KEP-AD 
225602310A 
SUPPLY PUMP
9 440 610 166 
 
SUPPLY PUMP

Isuzu 

9 440 610 849 
NP-FP/KEP-A 
1157501560 
SUPPLY PUMP
9 440 610 254 
NP-FP/KEP-AD 
 
SUPPLY PUMP

Isuzu 

105210-6270  
9 440 610 141 
NP-FP/KEP-A 
8971159711 
SUPPLY PUMP
9 440 610 153 
NP-FP/KEP-A 
 
SUPPLY PUMP
9 440 610 261 
 
SUPPLY PUMP
Back to top