Information stop pin
BOSCH
9 421 613 275
9421613275
ZEXEL
159274-7100
1592747100
ISUZU
1157793560
1157793560

Rating:
Include in ###:
Cross reference number
Zexel num
Bosch num
Firm num
Name
159274-7100
9 421 613 275
1157793560 ISUZU
STOP PIN
C 14GJ PUSH ROD GOV
C 14GJ PUSH ROD GOV
159274-7100
9 421 613 275
227321760A HINO
STOP PIN
C 14GJ PUSH ROD GOV
C 14GJ PUSH ROD GOV
159274-7100
9 421 613 275
224321760A HINO
STOP PIN
A C 14GJ PUSH ROD GOV
A C 14GJ PUSH ROD GOV
159274-7100
9 421 613 275
S224321760A HINO
STOP PIN
B C 14GJ PUSH ROD GOV
B C 14GJ PUSH ROD GOV
159274-7100
9 421 613 275
ME738278 MITSUBISHI
STOP PIN
C 14GJ PUSH ROD GOV
C 14GJ PUSH ROD GOV
159274-7100
9 421 613 275
1932999100 NISSAN-DIESEL
STOP PIN
C 14GJ PUSH ROD GOV
C 14GJ PUSH ROD GOV
Information:
(1) Crossbar (from 8B7548 Puller).(2) Spacer plate.(3) S1589 Bolt with two 1S379 Washers.(4) 1D4595 Bolt.(5) 3H465 Plate.(6) 1P2403 Dial Indicator.(7) 1P2394 Adapter Plate.(8) 1P2402 Gauge Body.Make reference to Cylinder Liner Projection in Testing and Adjusting for the complete procedure.1. Install gasket and spacer plate (2) with bolts (3) and two 1S379 Washers. Tighten bolts (3) evenly in four steps: 1st step ... 14 N m (10 lb ft)2nd step ... 35 N m (25 lb ft)3rd step ... 70 N m (50 lb ft)4th step ... 95 N m (70 lb ft)2. Install tools as shown. Tighten bolts (4) evenly in four steps: 1st step ... 7 N m (5 lb ft)2nd step ... 20 N m (15 lb ft)3rd step ... 35 N m (25 lb ft)4th step ... 70 N m (50 lb ft)3. Measure cylinder liner projection with dial indicator (6) in 1P2402 Gauge Body (8) as shown. Measure at four places around each cylinder liner near the clamped area. Cylinder liner projection measurements for any cylinder liner must be ... 0.033 to 0.175 mm (.0013 to .0069 in)Maximum permissible difference between all four measurements ... 0.05 mm (.002 in)Maximum permissible difference between average projection of any two cylinder liners next to each other ... 0.05 mm (.002 in)Maximum permissible difference between average projection of all cylinder liners under one cylinder head ... 0.10 mm (.004 in) If liner projection is not correct, turn the liner to a new position within the bore. If projection can not be corrected this way, move the liner to a different bore. If the projection can not be corrected this way, make reference to Special Instruction, Form No. FMO55228 for complete instructions on the use of 8S3140 Counterboring Tool Arrangement. 4. Minimum permissible depth to machine counterbore to adjust cylinder liner projection ... 0.76 mm (.030 in) Maximum permissible depth to machine counterbore to adjust cylinder liner projection ... 1.14 mm (.045 in)Install a 0.76 mm (.030 in) shim plus any added shims necessary to get the correct cylinder liner projection. Be sure that the 0.76 mm (.030 in) shim is directly under the cylinder liner flange.
Have questions with 159274-7100?
Group cross 159274-7100 ZEXEL
Isuzu
159274-7100
9 421 613 275
1157793560
STOP PIN
Hino
159274-7100
9 421 613 275
227321760A
STOP PIN
159274-7100
9 421 613 275
224321760A
STOP PIN
159274-7100
9 421 613 275
S224321760A
STOP PIN
Mitsubishi
159274-7100
9 421 613 275
ME738278
STOP PIN
Nissan-Diesel
159274-7100
9 421 613 275
1932999100
STOP PIN