Information stop pin
BOSCH
9 421 610 071
9421610071
ZEXEL
155411-0400
1554110400
ISUZU
1157290910
1157290910

Rating:
Include in ###:
Number on scheme 111/1
1055406290
as STOP PIN
L52
1055406410
as STOP PIN
1055423000
as STOP PIN
L52
1055424220
as STOP PIN
1055424221
as STOP PIN
L52
Cross reference number
Zexel num
Bosch num
Firm num
Name
155411-0400
9 421 610 071
1157290910 ISUZU
STOP PIN
C 14GJ PUSH ROD GOV
C 14GJ PUSH ROD GOV
155411-0400
9 421 610 071
19276J2007 NISSAN
STOP PIN
C 14GJ PUSH ROD GOV
C 14GJ PUSH ROD GOV
155411-0400
9 421 610 071
19276J2007 NISSAN-DIESEL
STOP PIN
C 14GJ PUSH ROD GOV
C 14GJ PUSH ROD GOV
Information:
2. Remove three nuts and washers (1).3. Move Peec unit (2) out of the way. (If so equipped). 4. Remove elbows (5) and pipes (7).5. Remove fuel line brackets (4).6. Remove bolts (6). Remove cover (3). 7. Remove elbows (10). Remove adapters (8) and adapters (9) from the aftercooler core. Remove bolts (11). 8. Move aftercooler core (12) toward the front of the engine and use two people to remove the aftercooler core from the lower aftercooler housing. The weight of the aftercooler core is approximately 29 kg (65 lb). Remove the O-ring seals from the aftercooler core extensions.Install Aftercooler
1. Install O-ring seals (13) on the aftercooler core extensions. Put clean engine oil or glycerin on the seals.2. Use two people to put aftercooler core (12) into position in the lower aftercooler housing. The weight of the aftercooler core is approximately 29 kg (65 lb). 3. Install bolts (11). Put clean engine oil or glycerin on O-ring seal (14) and in bores (15) and (16). 4. Put clean engine oil or glycerin on O-ring seals (17) and adapters (8) and (9). Install adapters (8) and (9) in the aftercooler core. 5. Install elbows (10). 6. Put cover (3) into position on the engine. Install bolts (6).7. Install fuel injection line brackets (4). Tighten bolts (20) to a torque of 4.5 1.1 N m (40 10 lb in).8. Put clean engine oil or glycerin on pipes (7). Install pipes (7) and elbows (5).9. Fill the cooling system with coolant. See Operation & Maintenance Manual for the proper procedure and levels.
1. Install O-ring seals (13) on the aftercooler core extensions. Put clean engine oil or glycerin on the seals.2. Use two people to put aftercooler core (12) into position in the lower aftercooler housing. The weight of the aftercooler core is approximately 29 kg (65 lb). 3. Install bolts (11). Put clean engine oil or glycerin on O-ring seal (14) and in bores (15) and (16). 4. Put clean engine oil or glycerin on O-ring seals (17) and adapters (8) and (9). Install adapters (8) and (9) in the aftercooler core. 5. Install elbows (10). 6. Put cover (3) into position on the engine. Install bolts (6).7. Install fuel injection line brackets (4). Tighten bolts (20) to a torque of 4.5 1.1 N m (40 10 lb in).8. Put clean engine oil or glycerin on pipes (7). Install pipes (7) and elbows (5).9. Fill the cooling system with coolant. See Operation & Maintenance Manual for the proper procedure and levels.
Have questions with 155411-0400?
Group cross 155411-0400 ZEXEL
Isuzu
155411-0400
9 421 610 071
1157290910
STOP PIN
Nissan
155411-0400
9 421 610 071
19276J2007
STOP PIN
Nissan-Diesel
155411-0400
9 421 610 071
19276J2007
STOP PIN