Information stop pin
BOSCH
9 421 610 070
9421610070
ZEXEL
155411-0300
1554110300
ISUZU
1157290900
1157290900

Rating:
Include in ###:
Number on scheme 111/1
1055406290
as STOP PIN
L51.5
1055406410
as STOP PIN
1055423000
as STOP PIN
L51.5
1055424220
as STOP PIN
1055424221
as STOP PIN
L51.5
Cross reference number
Zexel num
Bosch num
Firm num
Name
155411-0300
9 421 610 070
1157290900 ISUZU
STOP PIN
C 14GJ PUSH ROD GOV
C 14GJ PUSH ROD GOV
155411-0300
9 421 610 070
19276J2006 NISSAN
STOP PIN
C 14GJ PUSH ROD GOV
C 14GJ PUSH ROD GOV
155411-0300
9 421 610 070
19276J2006 NISSAN-DIESEL
STOP PIN
C 14GJ PUSH ROD GOV
C 14GJ PUSH ROD GOV
Information:
3. Remove turbo supply and drain lines (1). 4. Remove bolts (3) that holds bonnet (2) to engine block and torque converter oil cooler.5. Remove bolts (5), (6) and (7) (not shown) and remove cooler. Install in the reverse order. Fill cooling system with coolant. See the Operation & Maintenance Manual for the proper procedure and levels. Check the engine oil level. See the Operation & Maintenance Manual for the proper procedure and levels.End By:a. install oil filters and baseDisassemble Engine Oil Cooler & Bypass Valves
Start By:a. remove engine oil cooler and bypass valves 1. Remove bolts (1) to remove bypass valve assembly (3) from oil cooler (2). 2. Remove adapter (6) from the engine oil cooler. Remove O-ring seals (5) from the adapter.3. Remove bolts (4) to remove cover (7). Remove valves (9) and springs (8) from water line.4. Remove tube (10) from water lines. Remove O-ring seals (11) from the tube. 5. Clean the engine oil cooler tubes with a 3.2 mm (.125 in) diameter rod as shown.Assemble Engine Oil Cooler & Bypass Valves
1. Install new O-ring seals (1) on adapter (2). Install adapter (2) in the engine oil cooler.2. Install new O-ring seals (7) on tube (6). Install tube in water lines.3. Install valves (5) and springs (4) in the water line. Install cover (3) with the bolts (9) that hold it. 4. Install the bypass valve assembly on the engine oil cooler with the bolts (8) that hold it. Install the cover and bolts (9).End By:a. install engine oil cooler and bypass valves
Start By:a. remove engine oil cooler and bypass valves 1. Remove bolts (1) to remove bypass valve assembly (3) from oil cooler (2). 2. Remove adapter (6) from the engine oil cooler. Remove O-ring seals (5) from the adapter.3. Remove bolts (4) to remove cover (7). Remove valves (9) and springs (8) from water line.4. Remove tube (10) from water lines. Remove O-ring seals (11) from the tube. 5. Clean the engine oil cooler tubes with a 3.2 mm (.125 in) diameter rod as shown.Assemble Engine Oil Cooler & Bypass Valves
1. Install new O-ring seals (1) on adapter (2). Install adapter (2) in the engine oil cooler.2. Install new O-ring seals (7) on tube (6). Install tube in water lines.3. Install valves (5) and springs (4) in the water line. Install cover (3) with the bolts (9) that hold it. 4. Install the bypass valve assembly on the engine oil cooler with the bolts (8) that hold it. Install the cover and bolts (9).End By:a. install engine oil cooler and bypass valves
Have questions with 155411-0300?
Group cross 155411-0300 ZEXEL
Isuzu
155411-0300
9 421 610 070
1157290900
STOP PIN
Nissan
155411-0300
9 421 610 070
19276J2006
STOP PIN
Nissan-Diesel
155411-0300
9 421 610 070
19276J2006
STOP PIN