150584-6700 ZEXEL 9 431 612 548 BOSCH STOP PIN 9431612548 1505846700 8973551790


 

Information stop pin

BOSCH 9 431 612 548 9431612548
ZEXEL 150584-6700 1505846700
ISUZU 8973551790 8973551790
150584-6700 STOP PIN
Rating:
10
Buy STOP PIN 150584-6700 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
150584-6700 
9 431 612 548 
8973551790  ISUZU
STOP PIN
C 53PZ PUSH ROD NH parts NH




Information:

1. Disconnect two Fuel lines (1).2. Remove four bolts (2) and remove fuel transfer pump and gasket. The following steps are for the installation of the fuel transfer pump.3. Position the gasket and fuel transfer pump then install bolts (2).4. Connect fuel lines (1).5. Prime the fuel system. See the MAINTENANCE MANUAL.Disassemble Fuel Transfer Pump
Start By:a. remove fuel transfer pump 1. Remove cover (1) from the fuel transfer pump. 2. Remove strainer (2). 3. Remove valve housing (3) from body (4). 4. Use a pencil grinder to remove the staked metal that holds inlet check valve (6) and outlet check valve (5) in place. Remove check valves (5) and (6). 5. Push the center of the diaphragm down and turn it 90° to disengage the actuator rod from the actuator arm. Remove diaphragm (7). 6. Remove spring (8). 7. Remove retainer (9). 8. Remove lever (12), shaft (11) and arm (10) as an assembly. 9. If necessary, remove washers (13) from shaft (11). Remove shaft (11) and separate arm (10) from lever (12). 10. If necessary, remove primer (14) and spring.11. Thoroughly inspect all parts of the fuel transfer pump. A repair kit is available to rebuild the fuel transfer pump. The following steps are for the assembly of the fuel transfer pump. 12. Install primer (14) and the spring on to body (4). 13. Install lever (12) into arm (10) and install pin (11) through the arm and lever. Put washer (13) on each side of arm (10). 14. Put spring (15) into position on the boss in body (4). Install arm (10) and lever (12) as an assembly into body (4). Be sure spring (15) engages with the tang on lever (12). 15. Install two retainers (9) to hold shaft (11) and arm and lever assembly in body (4). 16. Install spring (8) into body (4). 17. Install diaphragm (7) into body (4). Put the flat on the actuator rod in alignment with lever (12). Push the center of the diaphragm down and turn it 90° to engage the actuator rod with the actuator arm. 18. Install a gasket and check valve (6) and gasket and check valve (5) in valve body (3). Stake valve body (3) around each check valve to hold them in position. Make the stake marks at a different location than the original stake marks. 19. Put the valve body in place on diaphragm (7) and install the screws that hold it. 20. Put strainer (2) in position on valve body (3). 21. Install a new gasket in cover (1) and Install cover (1) on body.End By:a. install fuel transfer pump

Have questions with 150584-6700?





Group cross 150584-6700 ZEXEL

Isuzu 

150584-6700  
9 431 612 548 
8973551790 
STOP PIN
Back to top