150523-8800 ZEXEL 9 431 610 045 BOSCH SHIM 9431610045 1505238800 5153390480


 

Information shim

BOSCH 9 431 610 045 9431610045
ZEXEL 150523-8800 1505238800
ISUZU 5153390480 5153390480
150523-8800 SHIM
Rating:
74
Buy SHIM 150523-8800 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
150523-8800 
9 431 610 045 
5153390480  ISUZU
SHIM
C 53PZ SHIM NH parts NH
150523-8800 
9 431 610 045 
ME722019  MITSUBISHI
SHIM
C 53PZ SHIM NH parts NH
150523-8800 
9 431 610 045 
16613V0773  NISSAN
SHIM
C 53PZ SHIM NH parts NH
150523-8800 
9 431 610 045 
16613V0773  NISSAN-DIESEL
SHIM
C 53PZ SHIM NH parts NH
150523-8800 
9 431 610 045 
145624643  MAZDA
SHIM
C 53PZ SHIM NH parts NH




Information:

Remove Rocker Shaft Assemblies And Push Rods
START BY:a. remove valve covers 1. Remove four bolts (1) from the turbocharger tube adapter to the aftercooler housing. Loosen the turbocharger compressor housing clamp, and rotate turbocharger tube (2) out of the way of the cylinder head assembly. 2. Remove bolts (3) that hold the valve cover bases to the cylinder head assembly. Remove valve cover bases (4).
To prevent damage to the fuel injection nozzle, hold adapter assembly (5) in position at the top of injection nozzle (6) when fuel line nut (7) is loosened or tightened.
3. Use tool (A) and a 5P328 crowfoot wrench (7/8") to loosen the fuel injection line nut at the nozzle end. 4. Use tool (B) to loosen the nut at the fuel injection line adapter end. Remove inner fuel injection lines (8). Install caps and plugs on all fuel injection line openings to keep dirt out of the fuel system. 5. Remove bolts (9) that hold the rocker shaft assemblies to the cylinder head assembly.6. Remove rocker shaft assemblies (10). 7. Put identification marks on the push rods as to their location in the engine. Remove push rods (11). 8. Put identification marks on the bridges as to their location in the engine. Remove bridges (12) from the dowels on the cylinder head assembly.Install Rocker Shaft Assemblies And Push Rods
1. Put clean engine oil on the bridges and dowels. Install the original bridges in their respective locations. New bridges can be mixed.2. Install bridges (1) on the bridge dowels. While firmly pressing 0.5 to 4.5 kg (1 to 10 lb.) straight down on the top contact surface of the bridge, turn the adjusting screw clockwise until contact is made with the valve stem. Turn the screw an additional 20° to 30° (1/3 to 1/2 of 1 hex on nut). This will straighten the dowel in the guide and compensate for the slack in the threads. Hold the adjusting screw in this position, and tighten the locknut to a torque of 30 4 N m (22 3 lb.ft.). Install original push rods in their respective locations in the engine. New push rods can be mixed.3. Install push rods (2). 4. Put rocker shaft assemblies (3) in position on the cylinder head assembly.5. Put 5P3931 Anti-Seize Compound on the threads of the bolts that hold the rocker shaft assemblies in place. Tighten the bolts first to a torque of 270 25 N m (200 18 lb.ft.). Start with the bolt in the center of the rocker shaft assembly. Tighten the bolts again to a torque of 450 20 N m (330 15 lb.ft.). Tighten the bolts again by hand to a torque of 450 20 N m (330 15 lb.ft.).
Do not cause damage to the O-ring seals on the inner fuel lines.
6. Install inner fuel injection lines (4). Tighten the fuel injection line adapter nuts (5) to a torque of 40 7 N m (30 5 lb.ft.)

Have questions with 150523-8800?





Group cross 150523-8800 ZEXEL

Isuzu 

150523-8800  
9 431 610 045 
5153390480 
SHIM

Mitsubishi 

150523-8800  
9 431 610 045 
ME722019 
SHIM

Nissan 

150523-8800  
9 431 610 045 
16613V0773 
SHIM

Nissan-Diesel 

150523-8800  
9 431 610 045 
16613V0773 
SHIM

Mazda 

150523-8800  
9 431 610 045 
145624643 
SHIM
Back to top