Information shim
BOSCH
9 431 610 031
9431610031
ZEXEL
150523-7400
1505237400
ISUZU
5153390370
5153390370

Rating:
Include in ###:
Cross reference number
Zexel num
Bosch num
Firm num
Name
150523-7400
9 431 610 031
5153390370 ISUZU
SHIM
C 53PZ SHIM NH parts NH
C 53PZ SHIM NH parts NH
150523-7400
9 431 610 031
ME722010 MITSUBISHI
SHIM
C 53PZ SHIM NH parts NH
C 53PZ SHIM NH parts NH
150523-7400
9 431 610 031
16613V0724 NISSAN
SHIM
C 53PZ SHIM NH parts NH
C 53PZ SHIM NH parts NH
150523-7400
9 431 610 031
16613V0724 NISSAN-DIESEL
SHIM
C 53PZ SHIM NH parts NH
C 53PZ SHIM NH parts NH
150523-7400
9 431 610 031
145624627 MAZDA
SHIM
C 53PZ SHIM NH parts NH
C 53PZ SHIM NH parts NH
150523-7400
9 431 610 031
2363358112 TOYOTA
SHIM
C 53PZ SHIM NH parts NH
C 53PZ SHIM NH parts NH
150523-7400
9 431 610 031
62153450660 ISEKI
SHIM
A C 53PZ SHIM NH parts NH
A C 53PZ SHIM NH parts NH
150523-7400
9 431 610 031
2336321608 FUJI-HEAVY
SHIM
C 53PZ SHIM NH parts NH
C 53PZ SHIM NH parts NH
Information:
Lubrication For A Rebuilt Engine
It is very important for a rebuilt engine to have "adequate" (needed) lubrication during the first seconds of operation. A "dry start" (without needed lubrication) on a rebuilt engine or an engine that has been in storage can cause bearing damage.To prevent the possibility of a "dry start" and bearing damage during the first few seconds of running, use the 1P0540 Flow Checking Tool Group and shop air pressure to pressure lubricate (fill the main oil passage with oil under pressure) all rebuilt engines and all engines that have been in storage.Procedure For Pressure Lubrication
1. Clean the tank of the 1P0540 Flow Checking Tool Group thoroughly, and set the pressure regulator to 240 35 kPa (35 5 psi).
Air pressure should not be more than 345 kPa (50 psi) at any time.
2. Put the correct engine oil into the tank. Use a minimum of 30% of the engine oil capacity. For some engines it will be necessary to fill the tank several times to get the correct amount of oil in the engine.3. Connect the tooling to the main oil passage of the engine.4. Add air pressure to the tank, with the regulator set at 240 35 kPa (35 5 psi). Although the tank has a hand pump, it is difficult to get enough air pressure to do the job with the hand pump. Therefore, use of shop air is recommended.5. Let the engine oil flow into the oil passage under pressure.Fill the crankcase with the correct engine oil. The amount of oil used in the pressure lubrication procedure must be subtracted from the recommended refill capacity in the Operation Maintenance Manual. If the engine is not going to be used for a long time, do the above procedure again before the first start.If shop air is not available, for charging the tank, the hand pump may be used to get the minimum required pressure.
DO NOT use the same 1P0540 Flow Checking Tool Group for both "pressure lubrication application" and for checking fuel flow. Incorrect cleaning is probable if the tool is used for both fuel and lubrication oil. Even a minute amount of dirt in the fuel system can cause fuel nozzle failure.
It is very important for a rebuilt engine to have "adequate" (needed) lubrication during the first seconds of operation. A "dry start" (without needed lubrication) on a rebuilt engine or an engine that has been in storage can cause bearing damage.To prevent the possibility of a "dry start" and bearing damage during the first few seconds of running, use the 1P0540 Flow Checking Tool Group and shop air pressure to pressure lubricate (fill the main oil passage with oil under pressure) all rebuilt engines and all engines that have been in storage.Procedure For Pressure Lubrication
1. Clean the tank of the 1P0540 Flow Checking Tool Group thoroughly, and set the pressure regulator to 240 35 kPa (35 5 psi).
Air pressure should not be more than 345 kPa (50 psi) at any time.
2. Put the correct engine oil into the tank. Use a minimum of 30% of the engine oil capacity. For some engines it will be necessary to fill the tank several times to get the correct amount of oil in the engine.3. Connect the tooling to the main oil passage of the engine.4. Add air pressure to the tank, with the regulator set at 240 35 kPa (35 5 psi). Although the tank has a hand pump, it is difficult to get enough air pressure to do the job with the hand pump. Therefore, use of shop air is recommended.5. Let the engine oil flow into the oil passage under pressure.Fill the crankcase with the correct engine oil. The amount of oil used in the pressure lubrication procedure must be subtracted from the recommended refill capacity in the Operation Maintenance Manual. If the engine is not going to be used for a long time, do the above procedure again before the first start.If shop air is not available, for charging the tank, the hand pump may be used to get the minimum required pressure.
DO NOT use the same 1P0540 Flow Checking Tool Group for both "pressure lubrication application" and for checking fuel flow. Incorrect cleaning is probable if the tool is used for both fuel and lubrication oil. Even a minute amount of dirt in the fuel system can cause fuel nozzle failure.
Have questions with 150523-7400?
Group cross 150523-7400 ZEXEL
Isuzu
150523-7400
9 431 610 031
5153390370
SHIM
Mitsubishi
150523-7400
9 431 610 031
ME722010
SHIM
Nissan
150523-7400
9 431 610 031
16613V0724
SHIM
Nissan-Diesel
150523-7400
9 431 610 031
16613V0724
SHIM
Mazda
150523-7400
9 431 610 031
145624627
SHIM
Toyota
150523-7400
9 431 610 031
2363358112
SHIM
Iseki
150523-7400
9 431 610 031
62153450660
SHIM
Fuji-Heavy
150523-7400
9 431 610 031
2336321608
SHIM