139415-0200 ZEXEL 9 411 611 408 BOSCH SHIM 9411611408 1394150200 1156391080


 

Information shim

BOSCH 9 411 611 408 9411611408
ZEXEL 139415-0200 1394150200
ISUZU 1156391080 1156391080
139415-0200 SHIM
Rating:
71
Buy SHIM 139415-0200 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
139415-0200 
9 411 611 408 
1156391080  ISUZU
SHIM
C 90HY SHIM Standard parts Others
139415-0200 
9 411 611 408 
228821780A  HINO
SHIM
C 90HY SHIM Standard parts Others
139415-0200 
9 411 611 408 
S228821780A  HINO
SHIM
A C 90HY SHIM Standard parts Others
139415-0200 
9 411 611 408 
ME730072  MITSUBISHI
SHIM
C 90HY SHIM Standard parts Others
139415-0200 
9 411 611 408 
16785Z9018  NISSAN-DIESEL
SHIM
C 90HY SHIM Standard parts Others




Information:


Ensure that all components are free of contaminants before installing. Contaminants may cause premature wear and reduced component service life.
Note: Disposition and Recycling - Common components of exhaust aftertreatment devices include, but are not limited to, cordierite, silicon carbide, iron zeolite, vanadium, platinum, and palladium. After the devices are used in an engine exhaust flow they can include some by-products that result from combustion. Follow applicable Federal, State, and local regulations when handling or discarding used aftertreatment devices
Illustration 1 g03842051
Note: Prior to removal of the catalyst, identify the position of the catalysts and airflow direction. Ensure that the catalyst part number position and the air flow direction remain the same.
Remove Diesel Particulate Filter (DPF) hatch cover (1) nuts, bolts, and washers.
Remove hatch cover (1) from the reactor unit.
Remove gasket assembly from the sealing surface of the hatch cover.
Carefully remove DPF catalyst assembly by removing the V band clamps. If necessary, repeat for other PDF catalysts. Take note of DPF air flow direction and location for reassembly.
Carefully install DPF catalyst into the cabinet with new gaskets. Verify correct position and air flow direction of the DPF.
DPF should always be installed in the direction shown in illustration 1. The long end of the DPF should be installed in the sleeve of the reactor and secured with the proper V band clamps.
For verified applications, replacement DPFs must have the proper tags and meet all documentation requirements.
Apply final torque to V band clamps. Refer to Specifications, SENR3130, "Torque Specifications" for the proper torque.
Replace all inner backing strip gaskets on the DPF catalyst cover.
Install DPF cover assembly.
Replace all damaged bolts.
Apply final torque to all bolts in a circular pattern. Refer to Specifications, SENR3130, "Torque Specifications" for the proper torque.
Verify that all bolts are at the proper torque value.

Have questions with 139415-0200?





Group cross 139415-0200 ZEXEL

Isuzu 

139415-0200  
9 411 611 408 
1156391080 
SHIM

Hino 

139415-0200  
9 411 611 408 
228821780A 
SHIM
139415-0200  
9 411 611 408 
S228821780A 
SHIM

Mitsubishi 

139415-0200  
9 411 611 408 
ME730072 
SHIM

Nissan-Diesel 

139415-0200  
9 411 611 408 
16785Z9018 
SHIM
Back to top