029998-4150 ZEXEL 9 442 611 301 BOSCH SHIM 9442611301 0299984150 228817590a


 

Information shim

BOSCH 9 442 611 301 9442611301
ZEXEL 029998-4150 0299984150
HINO 228817590A 228817590a
029998-4150 SHIM
Rating:
9
Buy SHIM 029998-4150 zexel genuine, new aftermarket engine parts with delivery

Include in #2:

Include in ###:

Number on scheme 363
SHIM
1010601350 as SHIM

Cross reference number

Zexel num
Bosch num
Firm num
Name
029998-4150 
9 442 611 301 
228817590A  HINO
SHIM
P 90HY SHIM Standard parts Others
029998-4150 
9 442 611 301 
S228817590A  HINO
SHIM
A P 90HY SHIM Standard parts Others
029998-4150 
9 442 611 301 
ME755937  MITSUBISHI
SHIM
P 90HY SHIM Standard parts Others




Information:

Start By:a. remove oil pump 1. Check each connecting rod cap for its location on the crankshaft. Each cap must have a number (1) which is the same as the number on the connecting rod. Do not mix bearings.2. Turn the crankshaft until two of the pistons are at bottom center.3. Remove connecting rod caps (2). Remove the lower bearing from the connecting rod caps.4. Push the connecting rods away from the crankshaft and remove the upper bearings from the connecting rods.
Be careful not to damage the crankshaft journals. Do not turn the crankshaft while any of the connecting rod caps are removed.
5. Install the upper bearings in connecting rods. put clean engine oil on the bearings and on the crankshaft journals. Slowly pull the connecting rods on the crankshaft.6. Put clean oil on the lower bearings. Install the lower bearings in the connecting rod caps. Be sure tab (3) on the back of the bearings fits in the groove of the caps and connecting rods. 7. Check the bearing clearance with Plastigage (A) as follows:a. Put clean oil on the threads of bolts (4). Install caps (5), Tool (A) and nuts finger tight.b. Tighten each nut (6) to a torque of 80 8 N m (60 6 lb ft).c. Put a mark across the nuts and bolts. Tighten the nuts 120 degrees more. 8. Remove caps (5) and Plastigage (A). Make sure the connecting rod bearing caps are installed with their identification number in arrangement with the connecting rod number.
Do not use an impact wrench to tighten the nuts the additional 120 degrees.
9. Measure the thickness of the Plastigage to find the bearing clearance. the clearance for new bearings must be 0.071 to 0.168 mm (.0028 to .0066 in). The maximum clearance for used bearings is 0.25 mm (0.010 in).10. Install caps (5). Tighten nuts (6) to a torque of 80 8 N m (60 6 lb ft). Tighten the nuts 120 degrees more.11. Do Steps 1 through 10 for the other connecting rod bearings.End By:a. install oil pump

Have questions with 029998-4150?





Group cross 029998-4150 ZEXEL

Ishikawajima-H 

9 442 614 535 
121040041 
SPACER BUSHING

Ishikawajima-S 

9 442 614 535 
121040041 
SPACER BUSHING

Nkk 

9 442 614 535 
04430002200 
SPACER BUSHING
9 442 610 173 
 
SHIM

Isuzu 

9 442 610 174 
8941748120 
SHIM

Hino 

029998-4150  
9 442 611 301 
228817590A 
SHIM
029998-4150  
9 442 611 301 
S228817590A 
SHIM

Mitsubishi 

029998-4150  
9 442 611 301 
ME755937 
SHIM

Hino 

9 442 610 504 
999992191A 
SHIM

Mitsubishi 

9 442 610 504 
ME756118 
SHIM

Hino 

9 442 610 499 
999992765A 
SHIM

Mitsubishi 

9 442 610 499 
ME755908 
SHIM
Back to top