Information shim
BOSCH
9 442 610 115
9442610115
ZEXEL
029311-1150
0293111150
MITSUBISHI
ME717856
me717856

Rating:
Include in #1:
101491-9890
as _
Include in ###:
Number on scheme 115/45B
1053060750
as SHIM
D17&11.8T0.3
1053060840
as SHIM
1053061042
as SHIM
D17&11.8T0.3
Cross reference number
Zexel num
Bosch num
Firm num
Name
029311-1150
9 442 610 115
ME717856 MITSUBISHI
SHIM
D 90HY SHIM Standard parts Others
D 90HY SHIM Standard parts Others
029311-1150
9 442 610 115
1928390002 NISSAN-DIESEL
SHIM
D 90HY SHIM Standard parts Others
D 90HY SHIM Standard parts Others
029311-1150
9 442 610 115
063624113 MAZDA
SHIM
D 90HY SHIM Standard parts Others
D 90HY SHIM Standard parts Others
Information:
Start By:a. remove timing gear coverb. remove fuel injection pump housing and rack actuator package 1. Remove four bolts (2) plate (3) and idler gear (1). 2. If the camshaft is not going to be removed, use tooling (A) to remove camshaft gear (4).
Do not turn the crankshaft with the camshaft gear removed. Damage can be caused to the pistons and valves, or both.
3. Remove bolts (5) that hold timing gear plate (6) to the cylinder block.4. Remove timing gear plate (6). 5. Use tooling (B) to remove the bearing from the idler gear. The following steps are for the installation of the timing gears and plate.6. Install a new gasket in the timing gear plate.7. Put timing gear plate (6) in position on the cylinder block, and install the bolts that hold the timing gear plate to the cylinder block.8. Heat camshaft gear (4) to a maximum temperature of 315° C (600° F), and install it on the camshaft.9. Use tooling (B), and install the bearing in the idler gear. Set the gear to the front face, (face with timing marks). Drive the bearing from the rear face toward the front face of the gear. Install the bearing to a depth of 1.5 0.5 mm (.06 .02 in.) below the rear face of the idler gear.10. Install the idler gear, plate and bolts. Be sure No. 1 cylinder is at top center on the compression stroke. Install the idler gear so "V" mark (7) on the idler gear is in alignment with the "V" mark on the crankshaft gear. "K" marks (8) of the camshaft gear can be seen at the outer edges of the idler gear.End By:a. install fuel injection pump housing and rack actuator packageb. install timing gear cover
Do not turn the crankshaft with the camshaft gear removed. Damage can be caused to the pistons and valves, or both.
3. Remove bolts (5) that hold timing gear plate (6) to the cylinder block.4. Remove timing gear plate (6). 5. Use tooling (B) to remove the bearing from the idler gear. The following steps are for the installation of the timing gears and plate.6. Install a new gasket in the timing gear plate.7. Put timing gear plate (6) in position on the cylinder block, and install the bolts that hold the timing gear plate to the cylinder block.8. Heat camshaft gear (4) to a maximum temperature of 315° C (600° F), and install it on the camshaft.9. Use tooling (B), and install the bearing in the idler gear. Set the gear to the front face, (face with timing marks). Drive the bearing from the rear face toward the front face of the gear. Install the bearing to a depth of 1.5 0.5 mm (.06 .02 in.) below the rear face of the idler gear.10. Install the idler gear, plate and bolts. Be sure No. 1 cylinder is at top center on the compression stroke. Install the idler gear so "V" mark (7) on the idler gear is in alignment with the "V" mark on the crankshaft gear. "K" marks (8) of the camshaft gear can be seen at the outer edges of the idler gear.End By:a. install fuel injection pump housing and rack actuator packageb. install timing gear cover
Have questions with 029311-1150?
Group cross 029311-1150 ZEXEL
Isuzu
Hino
Mitsubishi
Nissan-Diesel
Isuzu
Hino
Mitsubishi
Nissan-Diesel
Isuzu
Hino
Mitsubishi
Nissan-Diesel
Mitsubishi
Nissan-Diesel
Mazda
Mitsubishi
029311-1150
9 442 610 115
ME717856
SHIM
Nissan-Diesel
029311-1150
9 442 610 115
1928390002
SHIM
Mazda
029311-1150
9 442 610 115
063624113
SHIM