152004-1020 ZEXEL 9 441 610 157 BOSCH PUMP HOUSING 9441610157 1520041020 225801181a


 

Information pump housing

BOSCH 9 441 610 157 9441610157
ZEXEL 152004-1020 1520041020
HINO 225801181A 225801181a
152004-1020 PUMP HOUSING
Rating:
72
Buy PUMP HOUSING 152004-1020 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
152004-1020 
9 441 610 157 
225801181A  HINO
PUMP HOUSING
C 14GD HOUSING;F.P. F/P
152004-1020 
9 441 610 157 
225801230A  HINO
PUMP HOUSING
A C 14GD HOUSING;F.P. F/P
152004-1020 
9 441 610 157 
ME756437  MITSUBISHI
PUMP HOUSING
C 14GD HOUSING;F.P. F/P




Information:

Start By:a. remove valve covers 1. Use tooling (A), and disconnect fuel line (1) at each end. Remove the fuel line from the engine. 2. Use tool (B), and remove retainer (2) from the adapter.3. Remove the fuel injection nozzles with tooling (C) as follows:a. Install the 6V6983 Adapter and the 8T3199 screw into nozzle assembly (3).b. Install the 8T3198 Tube over the 8T3199 Screw.c. Use the 1B4206 Nut on the 8T3199 Screw.d. Use the 1B4206 Nut on the 8T3199 Screw to pull the fuel injection nozzle from the adapter.4. Remove compression seal (4) and carbon dam seal (8) from fuel injection nozzle (3).5. Use tool (D), and remove adapter (6) from the cylinder head.6. Remove gasket (7) and seal (5) from adapter (6). The following steps are for installation of the fuel injection nozzles and adapters.7. Use tool (E) to clean the bore in adapter (6). Use and open end wrench or tap driver to turn tool (E).8. Inspect seal (5) for damage or wear. Replace the seal if necessary.9. Put washer (7) and seal (5) in position on adapter (6).10. Put liquid soap in the bores of the cylinder head and on seals (5) in the adapters.11. Put 5P3931 Anti-Seize Compound on the threads of adapter (6), and install the adapter in the cylinder head assembly.12. Use tool (D), and tighten the adapter to a torque of 205 14 N m (150 10 lb.ft.).
Make sure the correct compression seal washer (4) is used when the nozzle assembly is installed in the adapter. Only copper washers are to be used with adapter.
13. Install compression seal washer (4), and use tool (F) to install carbon dam seal (8) on the fuel injection nozzle.14. Put fuel injection nozzle (3) in position in the adapter, and install retainer (2).15. Use tool (B) to tighten retainer (2) to a torque of 48 7 N m (35 5 lb.ft.). 16. Install fuel line (1). Tighten the nuts on the fuel line with tooling (A) to a torque of 40 7 N m (30 5 lb.ft.).End By:a. install valve covers

Have questions with 152004-1020?





Group cross 152004-1020 ZEXEL

Hino 

152004-1020  
9 441 610 157 
225801181A 
PUMP HOUSING
152004-1020  
9 441 610 157 
225801230A 
PUMP HOUSING

Mitsubishi 

152004-1020  
9 441 610 157 
ME756437 
PUMP HOUSING
Back to top