Buy 146009-9220 ZEXEL 9 461 612 061 BOSCH PUMP HOUSING 9461612061 1460099220 1672043g00


 

Information pump housing

BOSCH 9 461 612 061 9461612061
ZEXEL 146009-9220 1460099220
NISSAN 1672043G00 1672043g00
146009-9220 PUMP HOUSING
Rating:
8
Buy PUMP HOUSING 146009-9220 zexel genuine, new aftermarket engine parts with delivery

Compare Prices: .

As an associate, we earn commssions on qualifying purchases through the links below
$103.88
 

11 Oct 2019

-: -
Bosch 9461612061 Pump Housing

Cross reference number

Zexel num
Bosch num
Firm num
Name
146009-9220 
9 461 612 061 
1672043G00  NISSAN
PUMP HOUSING
K 11FV HOUSING;PUMP parts(VE) Others
146009-9220 
9 461 612 061 
1672043G00  NISSAN-DIESEL
PUMP HOUSING
K 11FV HOUSING;PUMP parts(VE) Others
146009-9220 
9 461 612 061 
SE0113V01  MAZDA
PUMP HOUSING
K 11FV HOUSING;PUMP parts(VE) Others




Information:

1. Remove bolts (1) that hold plate (2), and remove the plate. 2. Remove bolts (3) and (4) that hold the cylinder head assembly to the cylinder block.3. Fasten a hoist, and remove the cylinder head assembly. The weight is approximately 135 kg (300 lb.).
Do not put the cylinder head assembly down on a flat surface. This can cause damage to the fuel injection valves.
4. Remove the gasket, seals (5) and O-ring seals (6) from the spacer plate. The following steps are for installation of the cylinder head. Be sure a new gasket has been installed between the spacer plate and the cylinder block. See the topic, Remove And Install Spacer Plate.5. Thoroughly clean the spacer plate and the bottom surface of the cylinder head assembly. Install a new head gasket, new seals (5) and two O-ring seals (6).6. Fasten a hoist, and put the cylinder head assembly in position on the cylinder block. 7. Put clean engine oil on the threads of the cylinder head bolts. Install the cylinder head bolts and washers. Tighten the bolts in sequence shown.a. Tighten bolts 1 through 20 in number sequence to a torque of 270 25 N m (200 18 lb.ft.).b. Tighten bolts 1 through 20 in number sequence to a torque of 450 20 N m (330 15 lb.ft.).c. Tighten bolts 1 through 20 in number sequence to a torque of 450 20 N m (330 15 lb.ft.) by hand.d. Install the rocker shaft assemblies and push rods. See the topic, Install Rocker Shaft Assemblies And Push Rods.e. Tighten bolts 21 through 26 in number sequence to a torque of 270 25 N m (200 18 lb.ft.).f. Tighten bolts 21 through 26 in number sequence to a torque of 450 20 N m (330 15 lb.ft.).g. Tighten bolts 21 through 26 in number sequence to a torque of 450 20 N m (330 15 lb.ft.) by hand.h. Tighten the 3/8" bolts (5) to a torque of 43 7 N m (32 5 lb.ft.). If the studs for the exhaust manifold were removed, install new studs, and tighten them to a torque of 25 4 N m (18 3 lb.ft.).8. Make an adjustment to the valves to have a clearance of 0.38 mm (.015 in.) for intake and 0.76 mm (.030 in.) for exhaust. Tighten the locknuts for the valve adjustment screws to a torque of 28 4 N m (21 3 lb.ft.).9. Install the valve cover bases and the inner fuel lines. See the topic, Install Rocker Shaft Assemblies And Push Rods.10. Install the valve covers. See Install Valve Covers.11. Install plate (2).End By:a. install aftercooler housingb. install exhaust manifoldc. install fuel injection linesd. install water temperature regulator

Have questions with 146009-9220?





Group cross 146009-9220 ZEXEL

Nissan 

146009-9220  
9 461 612 061 
1672043G00 
PUMP HOUSING

Nissan-Diesel 

146009-9220  
9 461 612 061 
1672043G00 
PUMP HOUSING

Mazda 

146009-9220  
9 461 612 061 
SE0113V01 
PUMP HOUSING
Back to top