134080-3421 ZEXEL 9 411 612 234 BOSCH PUMP HOUSING 9411612234 1340803421 me740459


 

Information pump housing

BOSCH 9 411 612 234 9411612234
ZEXEL 134080-3421 1340803421
MITSUBISHI ME740459 me740459
134080-3421 PUMP HOUSING
Rating:
80
Buy PUMP HOUSING 134080-3421 zexel genuine, new aftermarket engine parts with delivery

Include in ###:

Number on scheme 1
PUMP HOUSING
1080623280 as PUMP HOUSING

Cross reference number

Zexel num
Bosch num
Firm num
Name
134080-3421 
134080-3422 
9 411 612 234 
ME740459  MITSUBISHI
PUMP HOUSING
* K 14FR parts(P,PD) Others




Information:

AIR COMPRESSOR: The air compressor which supplies pressure air is a two cylinder unit and is gear driven. The moving parts are lubricated from the diesel engine crankcase lubricating oil system. The compressor is liquid cooled and is connected through lines to the diesel engine cooling system.Every 10,000 miles inspect air compressor air cleaner. The time to replace the air compressor air cleaner is determined by inspection. Install a new element if plugged or oil soaked. Replace element every 20,000 miles regardless of condition.
AIR COMPRESSOR AIR CLEANEREvery 100,000 miles rebuild or install a rebuilt or new air compressor. This component should be checked and rebuilt in a well equipped shop with proper tools and personnel familiar with disassembly and assembly procedures. Thoroughly inspect all connections for tightness before placing vehicle in use.DRAIN AIR TANKS: Drain moisture from the air storage tanks at the end of each days run. Open the drain cocks at the bottom of the tank. Some air systems have automatic moisture ejector valves which can also be operated manually. Refer to the truck manufacturer's manual for maintenance procedures.TIGHTEN ENGINE MOUNTING BOLTS: When giving the engine a seasonal check, tighten all mounting bolts and nuts. Replace damaged, broken or lost bolts. See BOLT, NUT AND TAPERLOCK STUD SPECIFICATIONS.Major Inspection Maintenance
These items are of major checks which require partial disassembly and should be performed by experienced personnel. If it is determined that parts are worn beyond limits, remove the engine and completely rebuild.Oil consumption, combustion gas blow by, loss of power, and other signs of wear should be taken into consideration and analyzed to determine if the engine can be operated for another service interval.CRANKSHAFT END CLEARANCE: When engine is being rebuilt or at the 200,000 mile interval, check the crankshaft end clearance. The check can be made by attaching a dial indicator against the crankshaft pulley or vibration damper while prying against the vibration damper and pulley hub. End clearance should not exceed .035 inches (0,89 mm). Do not pry against outer diameter of vibration damper.CRANKSHAFT SEALS: When engine is being rebuilt or at the 300,000 mile interval or if oil leakage is occuring, replace seals.REBUILD CYLINDER HEAD: Irregular engine operation and excessive white or blue smoke can be caused by leaky valves and/or worn valve guides. The cylinder head must be removed for further inspection and reconditioning. Your authorized dealer is equipped to analyze the problem and recondition the cylinder head and valve components.

Have questions with 134080-3421?





Group cross 134080-3421 ZEXEL

Mitsubishi 

9 411 613 723 
ME740120 
PUMP HOUSING
134080-3421  

134080-3422 
9 411 612 234 
ME740459 
PUMP HOUSING
9 411 616 685 
 
PUMP HOUSING
Back to top