130060-1120 ZEXEL 9 411 614 908 BOSCH PUMP HOUSING 9411614908 1300601120 5156110610


 

Information pump housing

BOSCH 9 411 614 908 9411614908
ZEXEL 130060-1120 1300601120
ISUZU 5156110610 5156110610
130060-1120 PUMP HOUSING
Rating:
67
Buy PUMP HOUSING 130060-1120 zexel genuine, new aftermarket engine parts with delivery

Include in ###:

Number on scheme 1
PUMP HOUSING
1043003110 as PUMP HOUSING

Cross reference number

Zexel num
Bosch num
Firm num
Name
130060-1120 
9 411 614 908 
5156110610  ISUZU
PUMP HOUSING
K




Information:


EXHAUST MANIFOLD
1. Locks (four each side). 2. Retaining bolts (eight each side). 3. Exhaust manifold (one each side).Install Exhaust Manifold
1. Clean the exhaust manifold gasket mounting surfaces.2. Position the gasket and exhaust manifold on the engine and install the retaining bolts with locks. Tighten retaining bolts to 32 5 lb. ft. (4.4 0.7 mkg). Bend tabs on locks over flats of retaining bolt heads. Lock tabs must be bent over flats of retaining bolt heads. If necessary to align flats, tighten bolts a maximum additional turn of 30°. Do not loosen bolts to align flats.Disassemble Crankcase Ventilation Valve
1. Remove screws (2) that hold cover (3) on housing (1).
VENTILATION VALVE
1. Housing. 2. Screws (seven). 3. Cover.2. Remove cover (3) and spring (4).
REMOVING COVER
1. Housing. 3. Cover. 4. Spring.3. Remove the piston, sleeve (8), retainer (9), and diaphragm (7) from housing (1) as a unit. Remove inner sleeve (6) and gasket (5) from housing (1).
DISASSEMBLING VALVE
1. Housing. 5. Gasket. 6. Inner sleeve. 7. Diaphragm. 8. Sleeve. 9. Retainer.4. Remove nut (12), washer (13), spacer (11), piston (10), diaphragm (7), and the retainer from sleeve (8).
REMOVING DIAPHRAGM
7. Diaphragm. 8. Sleeve. 10. Piston. 11. Spacer. 12. Nut. 13. Washer.Assemble Crankcase Ventilation Valve
1. Put 5H2471 Gasket Cement on both sides of gasket (5) and install the gasket on housing (1). Install inner sleeve (6) in housing (1).2. Inspect diaphragm (7) for damage. Put piston (10) against side of diaphragm (7) that is stamped "piston side" and put retainer (9) in diaphragm (7).
INSTALLING INNER SLEEVE
1. Housing. 5. Gasket. 6. Inner sleeve.
ASSEMBLING DIAPHRAGM
7. Diaphragm. 9. Retainer. 10. Piston.3. Put the screw through sleeve (8), retainer (9), diaphragm (7), and piston (10). Put spacer (11), washer (13), and nut (12) on the screw and tighten the nut.
ASSEMBLING DIAPHRAGM
7. Diaphragm. 8. Sleeve. 10. Piston. 11. Spacer. 12. Nut. 13. Washer.4. Put 5H2471 Gasket Cement on both sides of the diaphragm (7) to prevent it from distorting and tearing during assembly. Install the assembled diaphragm unit in the inner sleeve (6) and housing (1).
INSTALLING DIAPHRAGM
1. Housing. 5. Gasket. 6. Inner sleeve. 7. Diaphragm. 8. Sleeve. 9. Retainer.5. With the diaphragm unit installed, put spring (4) on the spacer and install cover (3) being sure spring (4) goes over plug (14).
INSTALLING COVER
1. Housing. 3. Cover. 4. Spring. 14. Plug.6. Put screws (2) in housing (1) and tighten the screws.
COVER INSTALLED
1. Housing. 2. Screws (seven). 3. Cover.

Have questions with 130060-1120?





Group cross 130060-1120 ZEXEL

Isuzu 

130060-1120  
9 411 614 908 
5156110610 
PUMP HOUSING
Back to top