Buy 146683-4920 ZEXEL 9 461 615 658 BOSCH POTENTCIOMETER 9461615658 1466834920 168401f100


 

Information potentciometer

BOSCH 9 461 615 658 9461615658
ZEXEL 146683-4920 1466834920
NISSAN 168401F100 168401f100
146683-4920 POTENTCIOMETER
Rating:
79
Buy POTENTCIOMETER 146683-4920 zexel genuine, new aftermarket engine parts with delivery

Compare Prices: .

As an associate, we earn commssions on qualifying purchases through the links below
$310.47

20 Feb 2025
66.1386[29.76] pounds
LV: Gear245
Bosch 9461615658 Compensator
Bosch A brand-new Bosch OEM part || 9461615658
$116.79
 

07 May 2020

-: -
16840-1F100 Nissan Switch assy-inj 168401F100

Cross reference number

Zexel num
Bosch num
Firm num
Name
146683-4920 
9 461 615 658 
168401F100  NISSAN
POTENTCIOMETER
C 11FV POTENTIO METER parts(VE) Others
146683-4920 
9 461 615 658 
1684063G13  NISSAN-DIESEL
POTENTCIOMETER
C 11FV POTENTIO METER parts(VE) Others




Information:

1. Remove bolts (1) that hold plate (2), and remove the plate. 2. Remove bolts (3) and (4) that hold the cylinder head assembly to the cylinder block.3. Fasten a hoist, and remove the cylinder head assembly. The weight is approximately 135 kg (300 lb.).
Do not put the cylinder head assembly down on a flat surface. This can cause damage to the fuel injection valves.
4. Remove the gasket, seals (5) and O-ring seals (6) from the spacer plate. The following steps are for installation of the cylinder head. Be sure a new gasket has been installed between the spacer plate and the cylinder block. See the topic, Remove And Install Spacer Plate.5. Thoroughly clean the spacer plate and the bottom surface of the cylinder head assembly. Install a new head gasket, new seals (5) and two O-ring seals (6).6. Fasten a hoist, and put the cylinder head assembly in position on the cylinder block. 7. Put clean engine oil on the threads of the cylinder head bolts. Install the cylinder head bolts and washers. Tighten the bolts in sequence shown.a. Tighten bolts 1 through 20 in number sequence to a torque of 270 25 N m (200 18 lb.ft.).b. Tighten bolts 1 through 20 in number sequence to a torque of 450 20 N m (330 15 lb.ft.).c. Tighten bolts 1 through 20 in number sequence to a torque of 450 20 N m (330 15 lb.ft.) by hand.d. Install the rocker shaft assemblies and push rods. See the topic, Install Rocker Shaft Assemblies And Push Rods.e. Tighten bolts 21 through 26 in number sequence to a torque of 270 25 N m (200 18 lb.ft.).f. Tighten bolts 21 through 26 in number sequence to a torque of 450 20 N m (330 15 lb.ft.).g. Tighten bolts 21 through 26 in number sequence to a torque of 450 20 N m (330 15 lb.ft.) by hand.h. Tighten the 3/8" bolts (5) to a torque of 43 7 N m (32 5 lb.ft.). If the studs for the exhaust manifold were removed, install new studs, and tighten them to a torque of 25 4 N m (18 3 lb.ft.).8. Make an adjustment to the valves to have a clearance of 0.38 mm (.015 in.) for intake and 0.76 mm (.030 in.) for exhaust. Tighten the locknuts for the valve adjustment screws to a torque of 28 4 N m (21 3 lb.ft.).9. Install the valve cover bases and the inner fuel lines. See the topic, Install Rocker Shaft Assemblies And Push Rods.10. Install the valve covers. See Install Valve Covers.11. Install plate (2).End By:a. install aftercooler housingb. install exhaust manifoldc. install fuel injection linesd. install water temperature regulator

Have questions with 146683-4920?





Group cross 146683-4920 ZEXEL

9 461 628 984 
 
POTENTCIOMETER

Nissan 

9 461 616 876 
1684180G08 
POTENTCIOMETER

Nissan-Diesel 

9 461 616 876 
1684180G08 
POTENTCIOMETER

Nissan 

146683-4920  
9 461 615 658 
168401F100 
POTENTCIOMETER

Nissan-Diesel 

146683-4920  
9 461 615 658 
1684063G13 
POTENTCIOMETER
Back to top