146683-2220 ZEXEL 9 461 621 233 BOSCH POTENTCIOMETER 9461621233 1466832220 8970398030


 

Information potentciometer

BOSCH 9 461 621 233 9461621233
ZEXEL 146683-2220 1466832220
ISUZU 8970398030 8970398030
146683-2220 POTENTCIOMETER
Rating:
29
Buy POTENTCIOMETER 146683-2220 zexel genuine, new aftermarket engine parts with delivery

Include in ###:

Number on scheme 310
POTENTCIOMETER
1047401901 as POTENTCIOMETER

Cross reference number

Zexel num
Bosch num
Firm num
Name
146683-2220 
146683-2221 
9 461 621 233 
8970398030  ISUZU
POTENTCIOMETER
* C 11FV parts(VE) Others




Information:

2. Turn the crankshaft until two pistons are at bottom center.3. Remove bolts (1) and the bearing caps. Push the rods and pistons up until the rings are out of the cylinder liners. 4. Remove pistons (2) and connecting rods from the cylinder liners.5. Do Steps 1 through 4 for the remainder of the pistons and connecting rods.Install Pistons And Connecting Rod Assemblies
1. Put clean engine oil on piston rings, connecting rod bearings and cylinder liners. 2. Use tool (A), and install piston (2) and the connecting rod in the cylinder liner. Be sure the number on the tab groove side of the connecting rod is on the opposite side from the camshaft.3. Install the bearing cap on the connecting rod with the number on the side of the bearing cap on the same side and same number as on the connecting rod.4. Put 2P2506 Thread Lubricant on the threads of the bolts. Install the bolts, and tighten them to a torque 90 8 N m (65 6 lb ft.). Put a mark on the bolts and tighten the bolts an additional 90 5°.5. Do Steps 1 through 4 for the remainder of the pistons and connecting rods.End By:a. install oil pumpb. install cylinder head assemblyDisassemble And Assemble Pistons And Connecting Rod Assemblies
Start By:a. remove pistons and connecting rod assemblies 1. Remove bearings (2) from the connecting rod and connecting rod cap.2. Remove retainer ring (1) and tool (A).3. Remove pin (2) and connecting rod (4) from the piston. 4. Remove piston rings (5) from the piston with tool (B). Clean the piston ring grooves on the pistons with an acceptable ring groove cleaning tool. See, Use Of Piston Pin Bearing Removal And Installation Tools, Special Instructions, Form No. SMHS7295.5. Heat connecting rod (4) in an oven to a temperature of 177° to 260° C (350° to 500° F). Never use a direct flame or heat a connecting rod. 6. Put connecting rod (4) in position on the base plate of tooling (C). Put a new rod pin bearing (6) on the adapter of tooling (C). The old bearing is pushed out by tooling (C) as the new ring is installed.7. Use tooling (C) to push the new bearing into the connecting rod until the push adapter of tooling (C) make full contact with the connecting rod surface.8. Use a pin boring machine to make the rod pin bearing the correct size. The bore in the new rod pin bearing must be 50.830 0.008 mm (2.0012 .0003 in.).9. Check the clearance between the ends of the piston rings. See the topic, Pistons and Rings in the Specifications manual.10. Install the oil ring spring in the oil ring groove of the piston. The oil ring is to be installed over the spring with the oil ring end gap 180° from the oil ring spring joint.11. Install the oil ring on the piston with tool (B).12. Install the second (intermediate) piston ring with the side

Have questions with 146683-2220?





Group cross 146683-2220 ZEXEL

 
 

Isuzu 

146683-2220  

146683-2221 
9 461 621 233 
8970398030 
POTENTCIOMETER
9 461 621 234 
8970398031 
POTENTCIOMETER
Back to top