141171-1820 ZEXEL 9 443 611 135 BOSCH PLUNGER-AND-BARREL ASSY 9443611135 1411711820 30247020a


 

Information plunger-and-barrel assy

BOSCH 9 443 611 135 9443611135
ZEXEL 141171-1820 1411711820
NIIGATA-URAWA 30247020A 30247020a
141171-1820 PLUNGER-AND-BARREL ASSY
Rating:
63
Buy PLUNGER-AND-BARREL ASSY 141171-1820 zexel genuine, new aftermarket engine parts with delivery

Include in ###:

Number on scheme 5
PLUNGER-AND-BARREL ASSY
1042140060 as PLUNGER-AND-BARREL ASSY

Cross reference number

Zexel num
Bosch num
Firm num
Name
141171-1820 
9 443 611 135 
GD46 
30247020A  NIIGATA-URAWA
PLUNGER-AND-BARREL ASSY
C 26FF PLUNGER ASSY PL(PF-GD for marine) PL
141171-1820 
9 443 611 135 
GD46 
30247020A  NIIGATA
PLUNGER-AND-BARREL ASSY
C 26FF PLUNGER ASSY PL(PF-GD for marine) PL
141171-1820 
9 443 611 135 
GD46 
30247020A  NIIGATA-TEKKOU
PLUNGER-AND-BARREL ASSY
C 26FF PLUNGER ASSY PL(PF-GD for marine) PL
141171-1820 
9 443 611 135 
GD46 
30247020A   
PLUNGER-AND-BARREL ASSY
C 26FF PLUNGER ASSY PL(PF-GD for marine) PL




Information:


REMOVING CAM FOLLOWERS WITH MAGNET2. Remove the plug from the timing pin hole in the fuel injection pump housing and install timing pin (2).
TIMING PIN INSTALLED
1. FT887 Timing Pin (Fabricated Tool).3. Rotate the crankshaft CLOCKWISE (as viewed from front of engine) until the timing pin drops into the slot in the fuel injection pump camshaft.
PUMP DRIVE GEAR
2. Bolts (three). 3. Tachometer drive assembly. 4. Drive gear.4. Remove bolts (2) and tachometer drive assembly (3) from the fuel injection pump camshaft.5. Remove the fuel injection pump drive gear (4) from the fuel injection pump camshaft.6. Remove the camshaft thrust pin (5) from the rear of the cylinder block.
REMOVING THRUST PIN
5. Thrust pin.7. Pull the camshaft (6) out of the cylinder block, being careful to not damage the camshaft bearings or journals.
REMOVING CAMSHAFT
6. Camshaft.Install Camshaft
1. Lubricate the camshaft bearing surfaces with clean engine oil (SAE 30).2. Install the camshaft aligning timing mark on camshaft gear with timing mark on crankshaft gear.3. Install camshaft thrust pin (5) in rear of cylinder block. Tighten thrust pin to 35 5 lb. ft. (4.8 0.7 mkg).
TIMING MARKS4. Put timing plate (7) on the engine and thread bolt (8) into the timing gear. If bolt (8) will not thread into the timing gear, rotate the crankshaft CLOCKWISE (as viewed from front of engine) until bolt (8) threads into the timing gear.
TIMING PLATE INSTALLED
4. Gear. 7. 5P950 Timing Plate. 8. Bolt.
GEAR INSTALLED
4. Drive gear.5. Install drive gear (4) on the fuel injection pump camshaft with the holes in the position shown and the part number facing out. To be able to advance the timing adjustment without removing the front cover, position gear (4) in the direction of the arrow so the bolt holes in the fuel injection pump camshaft are off center as shown. The bolts must thread freely into the holes in the fuel injection pump camshaft.6. Install the tachometer drive assembly (3) and tighten it finger tight.7. Install bolts (2) and tighten the bolts to 32 5 lb. ft. (4.4 0.7 mkg). Tighten the tachometer drive assembly to 50 10 lb. ft. (6.9 1.4 mkg).8. Remove bolt (8) and remove the timing plate (7) from the engine.
TACHOMETER DRIVE ASSEMBLY INSTALLED
2. Bolts (three). 3. Tachometer drive assembly. 4. Pump drive gear.9. Remove timing pin (1) from fuel injection pump housing and install the plug in the timing pin hole.10. Install the cam followers in the same location from which they were removed. Always use the new cam followers with a new camshaft. Be sure to put engine oil on the cam followers and camshaft lobes before installing the cam followers.

Have questions with 141171-1820?





Group cross 141171-1820 ZEXEL

Niigata-Urawa 

141171-1820  
9 443 611 135 
GD46 
30247020A 
PLUNGER-AND-BARREL ASSY

Niigata 

141171-1820  
9 443 611 135 
GD46 
30247020A 
PLUNGER-AND-BARREL ASSY

Niigata-Tekkou 

141171-1820  
9 443 611 135 
GD46 
30247020A 
PLUNGER-AND-BARREL ASSY
141171-1820  
9 443 611 135 
GD46 
30247020A 
PLUNGER-AND-BARREL ASSY
Back to top