141170-5220 ZEXEL 9 443 611 545 BOSCH PLUNGER-AND-BARREL ASSY 9443611545 1411705220 c153600200z


 

Information plunger-and-barrel assy

BOSCH 9 443 611 545 9443611545
ZEXEL 141170-5220 1411705220
DAIHATSU C153600200Z c153600200z
141170-5220 PLUNGER-AND-BARREL ASSY
Rating:
8
Buy PLUNGER-AND-BARREL ASSY 141170-5220 zexel genuine, new aftermarket engine parts with delivery

Include in ###:

Number on scheme 5
PLUNGER-AND-BARREL ASSY
1040530030 as PLUNGER-AND-BARREL ASSY

Cross reference number

Zexel num
Bosch num
Firm num
Name
141170-5220 
9 443 611 545 
W22 
C153600200Z  DAIHATSU
PLUNGER-AND-BARREL ASSY
C 26FE PLUNGER ASSY PL(PF-W for marine) PL




Information:

start by:a) separation of governor from fuel injection pump housing 1. Remove the protection caps and felt washers (1) from pumps.2. Use wrench (A) to remove bushings (2) that hold the fuel injection pumps into the housing. Remove seals (3).3. Use extractor (B) to remove the pumps from the pump housing. Put identification on the injection pumps as to their location in the pump housing.4. Remove bonnet (4), ring (5), spring (6) and check valve (7) from barrel (8).5. Remove plunger assembly (11), washer (10) and spring (9) from the barrel.
Be careful not to cause damage to plunger assemblies. Keep the same cylinder pump and plunger together, the plunger from one pump can not be installed in another group.
6. Remove rack (12) from the housing. 7. Remove spacers (13) and lifters (14) from the housing. Keep the spacers and lifters together with identification as to their location in the pump housing. 8. Remove two bolts (16), lock and two sleeves from the gear assembly.9. Remove gear assembly (15) from the camshaft. 10. Remove two bolts, plate (17) and the spacer that hold the camshaft in position in the pump housing. 11. Remove the camshaft from the pump housing. 12. Use tool group (C) to remove the camshaft bearings from the pump housing.13. Remove the bearings for the fuel rack from the pump housing.Assemble Fuel Injection Pump Housing
1. Use tooling (C) to install the camshaft bearings in the fuel injection pump housing. Install the camshaft bearing joints 15° from the vertical centerline of the bores. Install the front and rear camshaft bearings even with the fuel injection pump housing. Install the center camshaft bearing a distance of 4.81 .02 in. (122.2 0.5 mm) from the rear face of the fuel injection pump housing. 2. Use tooling (F) to install the bearing with a tab for the groove in the rack.3. Use tooling (E) to install the rear bearing for the rack. Install the bearing to a depth of .282 .005 in. (7.16 0.13 mm). The small holes in the rear bearing must be installed parallel to the vertical centerline of the pump. 4. Put clean engine oil on the camshaft. Install the camshaft in the pump housing. 5. Install the spacer, plate (1) and two bolts that hold the camshaft in place in the pump housing. 6. Put gear assembly (2) in position on the end of the camshaft. Be sure rod (3) is in the groove of the camshaft. 7. Install sleeves (4), lock and two bolts on the gear assembly. 8. Install spacers (5) with their respective lifters (6) in the pump housing. If new lifters and/or pumps are to be installed, make adjustment of the fuel pump timing dimension. See SETTING THE INJECTION PUMP TIMING DIMENSION: OFF ENGINE TESTING AND ADJUSTING. 9. Install rack (7) in the pump housing.10. Assemble the fuel injection pumps as follows: a) Put clean fuel on all parts.b) Install the spring, washers and plunger in the

Have questions with 141170-5220?





Group cross 141170-5220 ZEXEL

Daihatsu 

141170-5220  
9 443 611 545 
W22 
C153600200Z 
PLUNGER-AND-BARREL ASSY
Back to top