Information plunger-and-barrel assy
BOSCH
9 443 611 506
9443611506
ZEXEL
140151-9420
1401519420
ISHIKAWAJIMA-S
1311162100
1311162100

Rating:
Compare Prices: .
As an associate, we earn commssions on qualifying purchases through the links below
Dynamic Friction Company 3000 Semi-Metallic Brake Pads 1311-1621-00-Rear Set
Dynamic Friction Company Excellent pad life and rotor friendly || Virtually noise free and low dust || Formulated for passenger vehicles and light duty trucks || Stable friction performance across a wide temperature range || 100% Copper Free Eco Friendly Formulation [California/Washington 2025] || If the “Confirmed Fit” bar appears at the top of this page, please check the “Confirmed Fit” bar before buying this product to ensure this product works for your vehicle. If the “Confirmed Fit” bar has an “i” in a blue circle, this product has additional notes. Please hover over the “i” on the bar to see notes before making your purchase.
Dynamic Friction Company Excellent pad life and rotor friendly || Virtually noise free and low dust || Formulated for passenger vehicles and light duty trucks || Stable friction performance across a wide temperature range || 100% Copper Free Eco Friendly Formulation [California/Washington 2025] || If the “Confirmed Fit” bar appears at the top of this page, please check the “Confirmed Fit” bar before buying this product to ensure this product works for your vehicle. If the “Confirmed Fit” bar has an “i” in a blue circle, this product has additional notes. Please hover over the “i” on the bar to see notes before making your purchase.
Include in ###:
Cross reference number
Zexel num
Bosch num
Firm num
Name
140151-9420
1311162100 ISHIKAWAJIMA-S
PLUNGER-AND-BARREL ASSY
C 26AA PLUNGER ASSY PL(PFR-Agriculture) PL
C 26AA PLUNGER ASSY PL(PFR-Agriculture) PL
Information:
If ambient conditions warrant, a higher viscosity oil of the recommended specification for a given compartment may need to be installed in order to provide adequate film thickness.
Non-Engine Machine Compartments
Recommended compartment warm-up procedure must be followed.