135130-4920 ZEXEL 9 411 613 543 BOSCH PLUNGER-AND-BARREL ASSY 9411613543 1351304920 16760z9217


 

Information plunger-and-barrel assy

BOSCH 9 411 613 543 9411613543
ZEXEL 135130-4920 1351304920
NISSAN-DIESEL 16760Z9217 16760z9217
135130-4920 PLUNGER-AND-BARREL ASSY
Rating:
8
Buy PLUNGER-AND-BARREL ASSY 135130-4920 zexel genuine, new aftermarket engine parts with delivery

Include in ###:

Number on scheme 7
PLUNGER-AND-BARREL ASSY
1070691380 as PLUNGER-AND-BARREL ASSY

Cross reference number

Zexel num
Bosch num
Firm num
Name
135130-4920 
9 411 613 543 
16760Z9217  NISSAN-DIESEL
PLUNGER-AND-BARREL ASSY
K




Information:

(1) End play for shaft (new) ... 0.114 0.038 mm (.0045 .0015 in) Maximum permissible end play (worn) ... 0.20 mm (.008 in)(2) Thickness of thrust bearing (where thrust rings contact bearing) ... 5.36 0.03 mm (.211 .001 in)(3) Bore in housing (new) ... 24.994 to 25.006 mm (.9840 to .9845 in) Outside diameter of the bearing (new) ... 24.882 to 24.892 mm (.9796 to .9800 in)Maximum permissible clearance between bearing and bore in housing (worn) ... 0.15 mm (.006 in)(4) Maximum permissible gap of oil seal ring, measured in bore of housing ... 0.25 mm (.010 in)(5) Install the compressor wheel (at room temperature) as follows: a. Put the compressor wheel in position on the shaft.b. Put a small amount of clean engine oil on the shaft threads.c. Install the nut on the shaft, and tighten the nut to a torque of 14 to 17 N m (125 to 150 lb in).
Do not bend or add stress to the shaft when nut is loosened or tightened.
d. Remove nut from shaft and apply 6V1541 Quick Cure Primer on the threads of the shaft and nut followed by application of 9S3265 Retaining Compound.e. Install the nut on the shaft, and tighten the nut to a torque of 4 N m (30 lb in).f. Tighten nut more as follows: For 99.0 mm (3.90 in) diameter compressor wheels, tighten the nut an additional 90°.For 86.4 mm (3.40 in) diameter compressor wheels, tighten the nut an additional 60°.(6) Tighten both band clamps with procedure that follows: a. Tighten to ... 14 1.1 N m (125 10 lb in)b. Tap (hit) clamp lightly all around.c. Tighten again to ... 14 1.1 N m (125 10 lb in)
Do not overtighten the clamps.
(7) Thickness of each thrust ring ... 2.553 0.013 mm (.1005 .0005 in)(8) Diameter of shaft (new) ... 15.997 to 16.005 mm (.6298 to .6301 in) Bore in the bearing (new) ... 16.035 to 16.043 mm (.6313 to .6316 in)Maximum permissible clearance between bearing and shaft (worn) ... 0.05 mm (.002 in)Torque for four nuts (put 5P3931 Anti-Seize Compound on threads) and bolts that hold the turbocharger to the exhaust manifold ... 55 5 N m (40 4 lb ft) Put clean engine oil in the oil inlet of the turbocharger after assembly or before installation to provide start up lubrication and/or storage protection.

Have questions with 135130-4920?





Group cross 135130-4920 ZEXEL

Nissan-Diesel 

135130-4920  
9 411 613 543 
16760Z9217 
PLUNGER-AND-BARREL ASSY
Back to top