134150-5820 ZEXEL 9 411 612 899 BOSCH PLUNGER-AND-BARREL ASSY 9411612899 1341505820 me741404


 

Information plunger-and-barrel assy

BOSCH 9 411 612 899 9411612899
ZEXEL 134150-5820 1341505820
MITSUBISHI ME741404 me741404
134150-5820 PLUNGER-AND-BARREL ASSY
Rating:
17
Buy PLUNGER-AND-BARREL ASSY 134150-5820 zexel genuine, new aftermarket engine parts with delivery

Include in ###:

Number on scheme 7
PLUNGER-AND-BARREL ASSY
1060670470 as PLUNGER-AND-BARREL ASSY

Cross reference number

Zexel num
Bosch num
Firm num
Name
134150-5820 
9 411 612 899 
ME741404  MITSUBISHI
PLUNGER-AND-BARREL ASSY
K 14ES PLUNGER BLOCK PL block(P) PL




Information:

It is not necessary to remove the cylinder head assembly for removal of the camshaft.3. Wire the cam roller followers up off of the camshaft as shown. Do this at each cylinder.
Typical Example3. Remove thrust pin (1), and remove camshaft assembly (2) from the engine. The following steps are for the installation of the camshaft assembly.4. Be sure the camshaft assembly is thoroughly clean. Put clean engine oil on the lobes and journals of the camshaft assembly. When installing the camshaft, rotating it in both clockwise and counterclockwise directions will help prevent it from binding in the bearing bores.5. Carefully install camshaft assembly (2) in the engine.
Camshaft Timing
When installing the camshaft assembly, be sure the number one cylinder is at (TDC) top dead center of the compression stroke with the timing pin installed in the flywheel. Camshaft timing is very important. The timing mark on the camshaft drive gear must line up with the idler gear timing mark as shown in the illustration. For more information about timing of engine, refer to the "Specifications" module, Form No. SENR5560.
6. With the camshaft properly timed and positioned, install thrust pin (1). Tighten thrust pin (1) to a torque of 48 7 N m (35 5 lb ft). Remove the wires that were used to hold the cam roller followers up off of the camshaft.End By:a. install front housing groupb. install speed/timing sensorc. install vibration damper and pulleyd. install alternatore. install drive belt and belt tightener groupf. install fuel transfer pumpg. install electronic unit injectorsh. install rocker arm assemblies and push rodsDisassemble & Assemble Camshaft Assembly
Start By:a. remove camshaft assembly1. Wrap camshaft portion of camshaft assembly with paper towels to protect the camshaft from being damaged.
Care must be taken not to allow the camshaft to fall to the floor when pressing it from the drive gear. Also, be sure that a camshaft lobe does not catch on the press plates.
2. Place the camshaft assembly in a press. Press camshaft (3) from drive gear (1).3. Remove woodruff key (2) from the camshaft. The following steps are for the assembly of the camshaft and the gear assembly.4. Install woodruff key (2) in the camshaft.5. Heat drive gear (1) to a maximum temperature of 300 C (572 F) for 30 minutes. Install the drive gear on the end of camshaft (3). Be sure woodruff key (2) is properly aligned and the drive gear makes contact with the shoulder on the end of the camshaft.End By:a. install camshaft assembly

Have questions with 134150-5820?





Group cross 134150-5820 ZEXEL

Mitsubishi 

134150-5820  
9 411 612 899 
ME741404 
PLUNGER-AND-BARREL ASSY
Back to top