134149-0420 ZEXEL 9 411 615 765 BOSCH PLUNGER-AND-BARREL ASSY 9411615765 1341490420 1676099612


 

Information plunger-and-barrel assy

BOSCH 9 411 615 765 9411615765
ZEXEL 134149-0420 1341490420
NISSAN-DIESEL 1676099612 1676099612
134149-0420 PLUNGER-AND-BARREL ASSY
Rating:
11
Buy PLUNGER-AND-BARREL ASSY 134149-0420 zexel genuine, new aftermarket engine parts with delivery

Include in ###:

Number on scheme 7
PLUNGER-AND-BARREL ASSY
1060615060 as PLUNGER-AND-BARREL ASSY

Cross reference number

Zexel num
Bosch num
Firm num
Name
134149-0420 
9 411 615 765 
1676099612  NISSAN-DIESEL
PLUNGER-AND-BARREL ASSY
K 14ES PLUNGER BLOCK PL block(P) PL




Information:

Start By:a. remove valve covers 1. Use tooling (A), and disconnect fuel line (1) at each end. Remove the fuel line from the engine. 2. Use tool (B), and remove retainer (2) from the adapter.3. Remove the fuel injection nozzles with tooling (C) as follows:a. Install the 6V6983 Adapter and the 8T3199 Screw into nozzle assembly (3).b. Install the 8T3198 Tube over the 8T3199 Screw.c. Use the 1B4206 Nut on the 8T3199 Screw.c. Use the 1B4206 Nut on the 8T3199 Screw to pull the fuel injection nozzle from the adapter.4. Remove compression seal (4) and carbon dam seal (8) from fuel injection nozzle (3).5. Use tool (D), and remove adapter (6) from the cylinder head.6. Remove gasket (7) and seal (5) from adapter (6). The following steps are for installation of the fuel injection nozzles and adapters.7. Use tool (E) to clean the bore in adapter (6). Use an open end wrench or tap driver to turn tool (E).8. Inspect seal (5) for damage or wear. Replace the seal if necessary.9. Put washer (7) and seal (5) in position on adapter (6).10. Put liquid soap in the bores of the cylinder head and on seals (5) in the adapters.11. Put 5P3931 Anti-Seize Compound on the threads of adapter (6), and install the adapter in the cylinder head assembly.12. Use tool (D), and tighten the adapter to a torque of 205 14 N m (150 10 lb.ft.).
Make sure the correct compression seal washer (4) is used when the nozzle assembly is installed in the adapter. Only copper washers are to be used with this adapter.
13. Install compression seal washer (4), and use tool (F) to install carbon dam seal (8) on the fuel injection nozzle.14. Put fuel injection nozzle (3) in position in the adapter, and install retainer (2).15. Use tool (B) to tighten retainer (2) to a torque of 48 7 N m (35 5 lb.ft.).16. Install fuel line (1). Tighten the nuts on the fuel line with tooling (A) to a torque of 40 7 N m (30 5 lb.ft.).End By:a. install valve covers

Have questions with 134149-0420?





Group cross 134149-0420 ZEXEL

Nissan-Diesel 

134149-0420  
9 411 615 765 
1676099612 
PLUNGER-AND-BARREL ASSY
Back to top