130101-4220 ZEXEL 9 413 610 767 BOSCH PLUNGER-AND-BARREL A 9413610767 1301014220


 

Information plunger-and-barrel a

BOSCH 9 413 610 767 9413610767
ZEXEL 130101-4220 1301014220
130101-4220 PLUNGER-AND-BARREL A
Rating:
75
Buy PLUNGER-AND-BARREL A 130101-4220 zexel genuine, new aftermarket engine parts with delivery

Include in ###:

Number on scheme 30
PLUNGER-AND-BARREL ASSY
1043005160 as PLUNGER-AND-BARREL ASSY

Cross reference number

Zexel num
Bosch num
Firm num
Name
130101-4220 
9 413 610 767 
K139 
   
PLUNGER-AND-BARREL A
C 14EV PLUNGER ASSY PL(S-K) PL




Information:

Recommended Procedure With Chassis Dynamometer
Possible Causes/CorrectionsMinor Operating Faults
To help identify a problem before a more involved troubleshooting procedure is started, follow the procedure given in the Primary Engine Checks section.Fuel Ratio Control Out Of Adjustment Or Bad
Follow the procedure in the Testing and Adjusting section of this Service Manual.Check Engine Performance
Do a Power Analysis Report (PAR), Level II, to check engine performance. See Special Instruction, Form No. SEHS8025 and SEHS7886 for the tooling and procedures to use. Be sure to make a record of the temperatures for inlet air, fuel (at filter base), lubricating oil and coolant. Make the necessary adjustments or repairs to the engine if needed.At this point, the governor fuel settings should be verified. See the Testing and Adjusting section of this Service Manual for the necessary procedures. Also, refer back to the information learned earlier (see Owner/Operator Input section) about the truck specifications and application and judge whether or not the engine is performing as expected or customer expectation is realistic.Recommended Procedure Without Chassis Dynamometer
Possible Causes/CorrectionsMinor Operating Faults
To help identify a problem before a more involved troubleshooting procedure is started, follow the procedure given in the Primary Engine Checks section.Fuel Ratio Control Out Of Adjustment Or Bad
Follow the procedure in the Testing and Adjusting section of this Service Manual.Fuel Injection Timing Not Correct
Follow the procedures in the Testing and Adjusting section of this Service Manual.Check Engine Performance
Install the tooling and follow the procedure given in the Road Test section.At this point, the governor fuel settings should be verified. See the Testing and Adjusting section of this Service Manual for the necessary procedures. Also, refer back to the information learned earlier (see Owner/Operator Input section) about the truck specifications and application and judge whether or not the engine is performing as expected or customer expectation is realistic.

Have questions with 130101-4220?





Group cross 130101-4220 ZEXEL

130101-4220  
9 413 610 767 
K139 
 
PLUNGER-AND-BARREL A
Back to top