Information plug
BOSCH
9 461 610 398
9461610398
ZEXEL
146577-3300
1465773300
ISUZU
8944085350
8944085350

Rating:
Include in ###:
Cross reference number
Zexel num
Bosch num
Firm num
Name
146577-3300
9 461 610 398
8944085350 ISUZU
PLUG
C 11FV CLOSING PLUG parts(VE) Others
C 11FV CLOSING PLUG parts(VE) Others
146577-3300
9 461 610 398
ME741175 MITSUBISHI
PLUG
C 11FV CLOSING PLUG parts(VE) Others
C 11FV CLOSING PLUG parts(VE) Others
146577-3300
9 461 610 398
19207W3401 NISSAN
PLUG
C 11FV CLOSING PLUG parts(VE) Others
C 11FV CLOSING PLUG parts(VE) Others
146577-3300
9 461 610 398
19207W3401 NISSAN-DIESEL
PLUG
C 11FV CLOSING PLUG parts(VE) Others
C 11FV CLOSING PLUG parts(VE) Others
Information:
3. Remove turbo supply and drain lines (1). 4. Remove bolts (3) that holds bonnet (2) to engine block and torque converter oil cooler.5. Remove bolts (5), (6) and (7) (not shown) and remove cooler. Install in the reverse order. Fill cooling system with coolant. See the Operation & Maintenance Manual for the proper procedure and levels. Check the engine oil level. See the Operation & Maintenance Manual for the proper procedure and levels.End By:a. install oil filters and baseDisassemble Engine Oil Cooler & Bypass Valves
Start By:a. remove engine oil cooler and bypass valves 1. Remove bolts (1) to remove bypass valve assembly (3) from oil cooler (2). 2. Remove adapter (6) from the engine oil cooler. Remove O-ring seals (5) from the adapter.3. Remove bolts (4) to remove cover (7). Remove valves (9) and springs (8) from water line.4. Remove tube (10) from water lines. Remove O-ring seals (11) from the tube. 5. Clean the engine oil cooler tubes with a 3.2 mm (.125 in) diameter rod as shown.Assemble Engine Oil Cooler & Bypass Valves
1. Install new O-ring seals (1) on adapter (2). Install adapter (2) in the engine oil cooler.2. Install new O-ring seals (7) on tube (6). Install tube in water lines.3. Install valves (5) and springs (4) in the water line. Install cover (3) with the bolts (9) that hold it. 4. Install the bypass valve assembly on the engine oil cooler with the bolts (8) that hold it. Install the cover and bolts (9).End By:a. install engine oil cooler and bypass valves
Start By:a. remove engine oil cooler and bypass valves 1. Remove bolts (1) to remove bypass valve assembly (3) from oil cooler (2). 2. Remove adapter (6) from the engine oil cooler. Remove O-ring seals (5) from the adapter.3. Remove bolts (4) to remove cover (7). Remove valves (9) and springs (8) from water line.4. Remove tube (10) from water lines. Remove O-ring seals (11) from the tube. 5. Clean the engine oil cooler tubes with a 3.2 mm (.125 in) diameter rod as shown.Assemble Engine Oil Cooler & Bypass Valves
1. Install new O-ring seals (1) on adapter (2). Install adapter (2) in the engine oil cooler.2. Install new O-ring seals (7) on tube (6). Install tube in water lines.3. Install valves (5) and springs (4) in the water line. Install cover (3) with the bolts (9) that hold it. 4. Install the bypass valve assembly on the engine oil cooler with the bolts (8) that hold it. Install the cover and bolts (9).End By:a. install engine oil cooler and bypass valves
Have questions with 146577-3300?
Group cross 146577-3300 ZEXEL
Isuzu
146577-3300
9 461 610 398
8944085350
PLUG
Mitsubishi
146577-3300
9 461 610 398
ME741175
PLUG
Nissan
146577-3300
9 461 610 398
19207W3401
PLUG
Nissan-Diesel
146577-3300
9 461 610 398
19207W3401
PLUG