146577-2000 ZEXEL 9 461 610 385 BOSCH PLUG 9461610385 1465772000 8944085220


 

Information plug

BOSCH 9 461 610 385 9461610385
ZEXEL 146577-2000 1465772000
ISUZU 8944085220 8944085220
146577-2000 PLUG
Rating:
59
Buy PLUG 146577-2000 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
146577-2000 
9 461 610 385 
8944085220  ISUZU
PLUG
C 11FV CLOSING PLUG parts(VE) Others
146577-2000 
9 461 610 385 
ME741162  MITSUBISHI
PLUG
C 11FV CLOSING PLUG parts(VE) Others
146577-2000 
9 461 610 385 
19207V0701  NISSAN
PLUG
C 11FV CLOSING PLUG parts(VE) Others
146577-2000 
9 461 610 385 
19207V0701  NISSAN-DIESEL
PLUG
C 11FV CLOSING PLUG parts(VE) Others
146577-2000 
9 461 610 385 
RFF113VN1  MAZDA
PLUG
C 11FV CLOSING PLUG parts(VE) Others




Information:


Do not turn the crankshaft while any of the connecting rods are in the engine without the caps installed.
1. Remove the carbon from the top inside surface of the cylinder liners.2. Turn the crankshaft until two pistons are at bottom center.3. Remove bearing caps (1) from the two connecting rods. 4. Push the pistons up until the piston rings are clear of the cylinder liner. Remove pistons (2). Keep each cap with its connecting rod.5. Do Steps 1 through 4 for the remainder of the pistons.Install Pistons & Connecting Rods
1. Put clean engine oil on the piston rings, connecting rod bearings and cylinder liners. 2. Put two pistons in position opposite of each other in the correct bore of the block. Install pistons (1) with Tool (A).
Make sure that the pistons are installed with flat surfaces (2) of the connecting rods toward each other and the chamfered sides (4) toward the crankshaft.
For more detail about the installation of connecting rod bearings, see Remove & Install Connecting Rod Bearings.
Do not use an impact wrench to tighten the nuts the additional 120 degrees when the bearing clearance is checked.
3. Check the bearing clearances with Plastigage.4. Put 2P-2506 Thread Lubricant on bolts (5). Install caps (3) and the nuts finger tight. Tighten each nut to a torque of 81 8 N m (60 6 lb ft). Put a mark across the nuts and bolts. Tighten each nut 120 degrees more.5. Check the side clearance between two connecting rods on the same crankshaft journal. The clearance must be 0.28 to 0.84 mm (.011 to .033 in) for new rods.6. Do Steps 1 through 5 for the remainder of the pistons.End By:a. install piston cooling tubesb. install oil pumpc. install cylinder headsDisassemble & Assemble Pistons & Connecting Rods
Start By:a. remove pistons and connecting rods 1. Remove bearings (3) from the connecting rod and connecting rod cap. The new style retainer rings allow the use of pliers to remove retainer ring (1).2. Remove retainer ring (1) with Tool (A) or pliers.3. Remove pin (2) and connecting rod (4) from the pistons. 4. Remove piston rings (5) from the piston with Tool (B). Clean the piston ring grooves on the pistons with an acceptable ring groove cleaning tool. See Use Of Piston Pin Bearing Removal & Installation Tools, Special Instructions, SMHS7295-02.5. Heat connecting rod (4) in an oven to a temperature of 177° to 260° C (350° to 500° F). Never use a direct flame to heat a connecting rod. 6. Put connecting rod (4) in position on the base plate of Tooling (C). Put a new rod pin bearing (6) on the adapter part of Tooling (C). The old bearing is pushed out by Tooling (C) as the new bearing is installed.7. Use Tooling (C) to push the new bearing into the connecting rod until the push adapter of Tooling (C) makes full contact with the connecting rod surface.8. Use a pin boring machine to make the rod pin bearing the

Have questions with 146577-2000?





Group cross 146577-2000 ZEXEL

Isuzu 

146577-2000  
9 461 610 385 
8944085220 
PLUG

Mitsubishi 

146577-2000  
9 461 610 385 
ME741162 
PLUG

Nissan 

146577-2000  
9 461 610 385 
19207V0701 
PLUG

Nissan-Diesel 

146577-2000  
9 461 610 385 
19207V0701 
PLUG

Mazda 

146577-2000  
9 461 610 385 
RFF113VN1 
PLUG
Back to top