146577-1800 ZEXEL 9 461 610 383 BOSCH PLUG 9461610383 1465771800 8944085200


 

Information plug

BOSCH 9 461 610 383 9461610383
ZEXEL 146577-1800 1465771800
ISUZU 8944085200 8944085200
146577-1800 PLUG
Rating:
49
Buy PLUG 146577-1800 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
146577-1800 
9 461 610 383 
8944085200  ISUZU
PLUG
C 11FV CLOSING PLUG parts(VE) Others
146577-1800 
9 461 610 383 
ME741160  MITSUBISHI
PLUG
C 11FV CLOSING PLUG parts(VE) Others
146577-1800 
9 461 610 383 
1920759Y00  NISSAN
PLUG
C 11FV CLOSING PLUG parts(VE) Others
146577-1800 
9 461 610 383 
19207Z9411  NISSAN-DIESEL
PLUG
C 11FV CLOSING PLUG parts(VE) Others
146577-1800 
9 461 610 383 
1920759Y00  NISSAN-DIESEL
PLUG
A C 11FV CLOSING PLUG parts(VE) Others




Information:

Start By:a. remove valve covers
Do not let the tops of the fuel injection nozzles turn when the fuel lines are loosened. The nozzles will be damaged if the top of the nozzles turn in the body.
1. Use Tooling (A) to loosen the nuts on the fuel injection line.2. Remove fuel injection lines (1).3. Disconnect fuel injection line nut (2) from head adapter nut (3).4. Remove adapter nut (3) and the O-ring seal. 5. Remove four bolts (4) that hold rocker arm assembly (5), and remove rocker arm assembly (5).Install Rocker Shaft Assemblies
1. Check the adjustment of the valve bridges. See the topic "Install Push Rods, Valve Lifters & Valve Bridges" in this module. 2. Loosen all the rocker arm adjusting screws on rocker shaft assembly (5).3. Install rocker shaft assembly (5).4. Clean the bolts that hold the rocker shaft assembly. Put 2P-2506 Thread Lubricant on the bolt threads, and install them.5. Be sure the rocker arms and push rods are in alignment before the rocker shaft assembly bolts are tightened.6. Tighten the rocker shaft bolts in the following sequence.a. Tighten bolts (1) through (4) in numerical sequence to a torque of 280 27 N m (210 20 lb ft).b. Tighten bolts (1) through (4) in numerical sequence to a torque of 440 20 N m (320 15 lb ft).c. Tighten bolts (1) through (4) in numerical sequence again to a final torque of 440 20 N m (320 15 lb ft). 7. Install a new O-ring seal on head adapter (7), and put clean engine oil on it.8. Put fuel injection line (8) in position, but do not tighten the nuts.9. Install adapters (7), and connect fuel injection lines (8).10. Connect fuel injection lines (6) to adapters (7).
Do not let the tops of the fuel injection nozzles turn when the fuel lines are tightened. The nozzles will be damaged if the top of the nozzles turn in the body.
11. Use Tooling (A) to tighten the fuel injection line nuts to a torque of 41 7 N m (30 5 lb ft).12. Adjust the valve clearance settings. The clearance for the intake valve is 0.38 mm (.015 in). The clearance for the exhaust valves is 0.76 mm (.030 in). See the topic "Valve Clearance Setting" in Testing & Adjusting.End By:a. install valve coversDisassemble Rocker Shaft Assemblies
Start By:a. remove rocker shaft assemblies 1. Remove retainer (1) from the end of the shaft.2. Remove the washers and rocker arm (2). 3. Use Tool (A) to remove the pin that holds bracket (3) to the rocker arm shaft.4. Remove bracket (3), rocker arm (4) and the spring.5. Remove the remainder of the rocker arms. The center brackets do not have pins.Assemble Rocker Shaft Assemblies
Make sure all parts of the rocker shaft assembly are clean before assembly. 1. Put clean engine oil on shaft (3).2. Install the center springs, rocker arms and bracket.3. Install spring (1), rocker arm (4) and bracket (2).4. Put tape

Have questions with 146577-1800?





Group cross 146577-1800 ZEXEL

Isuzu 

146577-1800  
9 461 610 383 
8944085200 
PLUG

Mitsubishi 

146577-1800  
9 461 610 383 
ME741160 
PLUG

Nissan 

146577-1800  
9 461 610 383 
1920759Y00 
PLUG

Nissan-Diesel 

146577-1800  
9 461 610 383 
19207Z9411 
PLUG
146577-1800  
9 461 610 383 
1920759Y00 
PLUG
Back to top