Information pin
BOSCH
9 423 610 523
9423610523
ZEXEL
156806-0900
1568060900
ISUZU
1157498690
1157498690

Rating:
Include in ###:
Cross reference number
Zexel num
Bosch num
Firm num
Name
156806-0900
9 423 610 523
1157498690 ISUZU
PIN
C 14GQ PILOT PIN TIMER
C 14GQ PILOT PIN TIMER
156806-0900
9 423 610 523
228115840A HINO
PIN
C 14GQ PILOT PIN TIMER
C 14GQ PILOT PIN TIMER
156806-0900
9 423 610 523
S228115840A HINO
PIN
A C 14GQ PILOT PIN TIMER
A C 14GQ PILOT PIN TIMER
156806-0900
9 423 610 523
ME738209 MITSUBISHI
PIN
C 14GQ PILOT PIN TIMER
C 14GQ PILOT PIN TIMER
156806-0900
9 423 610 523
1681499002 NISSAN
PIN
C 14GQ PILOT PIN TIMER
C 14GQ PILOT PIN TIMER
156806-0900
9 423 610 523
1681499002 NISSAN-DIESEL
PIN
C 14GQ PILOT PIN TIMER
C 14GQ PILOT PIN TIMER
Information:
1. Disconnect the fuel outlet line (1) and fuel inlet line (3) from the priming pump.2. Disconnect the fuel line (2) from pump.3. Remove the bolts (4) from pump.4. Remove the fuel transfer pump.5. Remove the fuel lines (1) and (3) from pump.Install Fuel Transfer Pump
1. Install the two fuel lines in transfer pump.2. Put the fuel transfer pump in position in the accessory drive housing, and install the two bolts.3. Connect the two fuel lines to priming pump.4. Connect the fuel line to transfer pump.Disassemble Fuel Transfer Pump
start by: a) remove fuel transfer pump 1. Remove the nut (2), gear (3), and key.2. Remove the cage (1). Remove the O-ring seals from the cage.3. Use tool setup (A) to remove the bearing and seals from cage (1).4. Remove the cover (4).
Be careful during disassembly and assembly of pump to prevent damage to the contacting surfaces of the cover (4) and the pump body.
5. Remove the bolt (5), spring, and ball for the check valve for the priming pump. 6. Remove the gear (7), and gear and shaft assembly (6) from pump body. 7. Use tool setup (A) to remove the bearing from the pump body.Assemble Fuel Transfer Pump
1. Clean all parts thoroughly before assembling the pump. 2. Use tool setup (A) to install the bearing in the pump body.3. Put the gear, and gear and shaft assembly in position in pump body.4. Put a thin amount of 8S6747 Liquid Gasket Material on the face of body assembly that is against the cover.
Do not let the liquid gasket material get into the pump.
5. Put the cover into position on pump body and install the bolts. The gear and shaft assembly must turn freely after the bolts in cover have been tightened.6. Install the check valve ball, spring, and bolt for the priming pump in the cover. 7. Use tool setup (B) to install the seals in cage. Install the two seals with the lips of seals toward each other.8. Use tool setup (A) to install the bearing in cage assembly. Install the O-ring seals on cage. 9. Put clean oil on O-ring seals and lips of seals. 10. Put the cage assembly in position, and install the woodruff key, gear, and nut. Tighten nut to 22 5 lb.ft. (3.0 0.7 mkg).end by: a) install fuel transfer pump
1. Install the two fuel lines in transfer pump.2. Put the fuel transfer pump in position in the accessory drive housing, and install the two bolts.3. Connect the two fuel lines to priming pump.4. Connect the fuel line to transfer pump.Disassemble Fuel Transfer Pump
start by: a) remove fuel transfer pump 1. Remove the nut (2), gear (3), and key.2. Remove the cage (1). Remove the O-ring seals from the cage.3. Use tool setup (A) to remove the bearing and seals from cage (1).4. Remove the cover (4).
Be careful during disassembly and assembly of pump to prevent damage to the contacting surfaces of the cover (4) and the pump body.
5. Remove the bolt (5), spring, and ball for the check valve for the priming pump. 6. Remove the gear (7), and gear and shaft assembly (6) from pump body. 7. Use tool setup (A) to remove the bearing from the pump body.Assemble Fuel Transfer Pump
1. Clean all parts thoroughly before assembling the pump. 2. Use tool setup (A) to install the bearing in the pump body.3. Put the gear, and gear and shaft assembly in position in pump body.4. Put a thin amount of 8S6747 Liquid Gasket Material on the face of body assembly that is against the cover.
Do not let the liquid gasket material get into the pump.
5. Put the cover into position on pump body and install the bolts. The gear and shaft assembly must turn freely after the bolts in cover have been tightened.6. Install the check valve ball, spring, and bolt for the priming pump in the cover. 7. Use tool setup (B) to install the seals in cage. Install the two seals with the lips of seals toward each other.8. Use tool setup (A) to install the bearing in cage assembly. Install the O-ring seals on cage. 9. Put clean oil on O-ring seals and lips of seals. 10. Put the cage assembly in position, and install the woodruff key, gear, and nut. Tighten nut to 22 5 lb.ft. (3.0 0.7 mkg).end by: a) install fuel transfer pump
Have questions with 156806-0900?
Group cross 156806-0900 ZEXEL
Isuzu
156806-0900
9 423 610 523
1157498690
PIN
Hino
156806-0900
9 423 610 523
228115840A
PIN
156806-0900
9 423 610 523
S228115840A
PIN
Mitsubishi
156806-0900
9 423 610 523
ME738209
PIN
Nissan
156806-0900
9 423 610 523
1681499002
PIN
Nissan-Diesel
156806-0900
9 423 610 523
1681499002
PIN