Buy 131424-4920 ZEXEL 9 411 610 197 BOSCH OVER FLOW VALVE 9411610197 1314244920 5156410140


 

Information over flow valve

BOSCH 9 411 610 197 9411610197
ZEXEL 131424-4920 1314244920
ISUZU 5156410140 5156410140
131424-4920 OVER FLOW VALVE
Rating:
79
Buy OVER FLOW VALVE 131424-4920 zexel genuine, new aftermarket engine parts with delivery

Compare Prices: .

As an associate, we earn commssions on qualifying purchases through the links below
$62.00

02 Nov 2024
66.1386[29.76] Pounds
ES: Auto i Center
Bosch 9411610197 Hollow Bolt
Bosch A brand-new Bosch OEM part || 9411610197

Cross reference number

Zexel num
Bosch num
Firm num
Name
131424-4920 
9 411 610 197 
5156410140  ISUZU
OVER FLOW VALVE
C 14FL OVER FLOW VALVE parts(A,AD) Others
131424-4920 
9 411 610 197 
1132633311  ISUZU
OVER FLOW VALVE
A C 14FL OVER FLOW VALVE parts(A,AD) Others
131424-4920 
9 411 610 197 
1132600011  ISUZU
OVER FLOW VALVE
B C 14FL OVER FLOW VALVE parts(A,AD) Others




Information:

Start By:a. remove fuel injection lines
Keep all parts clean from contaminants. Contaminants put into the system may cause rapid wear and shortened component life.
1. Remove bolts (1) and fan guard (2). 2. Loosen bolts (7), (9) and (10). Remove belts (8).3. Remove bolt (4) to clip. Remove grease line (3).4. Remove nuts (6). Remove cover (5) and the gasket. 5. Loosen bolt (12) enough to leave a gap of 3.18 mm (.125 in) between washers (11) and the fuel pump drive gear.6. Install tool (A) as shown. Tighten the stud to pull the fuel pump drive gear loose from the taper on the fuel injection pump camshaft.7. Remove tool (A), bolt (12), and washer (11). 8. Identify and disconnect wires (13).9. Remove tube assemblies (15) and (18).10. Remove two bolts (14), fuel transfer pump (17), and the O-ring seal.11. Remove bolts (16), the filter base, the gasket, and filter (19). 12. Fasten the fuel injection pump housing and governor to a hoist.13. Remove two bolts (22), three nuts (21), and the fuel injection pump housing and governor. The weight of the fuel injection pump housing and governor is 29 kg (64 lb.).14. Remove the two O-ring seals from the bottom of the fuel injection pump housing and governor. 15. Loosen screw (25). Remove two screws (26), control assembly (23) and spacers (24).Install Fuel Injection Pump Housing And Governor
Start By:a. remove fuel injection linesb. remove valve cover Number 1 piston must be set at top dead center (TDC) to perform all timing procedures. The engine is seen from the flywheel end when direction of crankshaft rotation is given. 1. Remove the starter.2. Install tool (B) on flywheel housing as shown.3. To find TDC for No. 1 piston;a. Turn the flywheel clockwise (opposite the direction of engine rotation) approximately 30 degrees. This removes all play from the timing gears. If you go past the bolt hole, you must repeat Step (a).b. Turn the flywheel counterclockwise until a 3/8" - 16 x 2 1/4" NC bolt (27) can be installed in the flywheel through the hole in the flywheel housing. The No. 1 and No. 6 pistons are now at top center position. The No. 1 piston is on the compression stroke when the valves of the No. 1 cylinder are closed. The rocker must be free to move up and down.4. If No. 1 piston is not on the compression stroke, remove the 3/8" - 16 x 2 1/4" NC bolt (27) and turn the flywheel 360° counterclockwise. Install the 3/8" bolt as before. The No. 1 piston is now at TDC.
Typical Example5. Install tooling (C) in the fuel injection pump housing as shown. Push on tooling (C) and turn injection pump camshaft (32). When tooling (C) engages the groove (slot) in the camshaft, the fuel injection pump is in the No. 1 piston TDC position.6. Be sure O-ring seals (28), (29), (30) and (31) are in position on the fuel injection pump housing and governor. Put clean engine oil

Have questions with 131424-4920?





Group cross 131424-4920 ZEXEL

Isuzu 

131424-4920  
9 411 610 197 
5156410140 
OVER FLOW VALVE
131424-4920  
9 411 610 197 
1132633311 
OVER FLOW VALVE
131424-4920  
9 411 610 197 
1132600011 
OVER FLOW VALVE
Back to top