150650-9100 ZEXEL 9 431 611 232 BOSCH NOZZLE-RETAINING NUT 9431611232 1506509100 16629t9300


 

Information nozzle-retaining nut

BOSCH 9 431 611 232 9431611232
ZEXEL 150650-9100 1506509100
NISSAN 16629T9300 16629t9300
150650-9100 NOZZLE-RETAINING NUT
Rating:
10
Buy NOZZLE-RETAINING NUT 150650-9100 zexel genuine, new aftermarket engine parts with delivery

Include in ###:

Number on scheme 20
NOZZLE-RETAINING NUT
1050314600 as NOZZLE-RETAINING NUT

Cross reference number

Zexel num
Bosch num
Firm num
Name
150650-9100 
9 431 611 232 
16629T9300  NISSAN
NOZZLE-RETAINING NUT
C 53PZ RETAINING NUT NH parts NH
150650-9100 
9 431 611 232 
16629T9300  NISSAN-DIESEL
NOZZLE-RETAINING NUT
C 53PZ RETAINING NUT NH parts NH




Information:

START BY:a. remove fuel filter and base1. Drain the coolant from the engine.
Do not disconnect the air line from the compressor governor until the air pressure is zero.
2. Loosen the bleed valve and release the air pressure in the air tank. 3. Disconnect air compressor line (1) and fuel ratio control line (2) from the aftercooler housing. 4. Remove four turbocharger tube adapter to aftercooler housing bolts (3), nuts and cover. Loosen turbocharger compressor housing clamp (4), and rotate turbocharger tube (5) out of the way of the aftercooler housing. 5. Fasten tooling (A) and a hoist to aftercooler housing (6). Remove bolts (7) that hold the aftercooler housing to the cylinder head assembly. Remove the aftercooler housing from the engine. The weight is 36 kg (80 lb.).Install Aftercooler Housing
1. Install new O-ring seals (1) on the aftercooler water inlet and outlet pipes. Lubricate the O-ring seals with clean engine oil. Put new gaskets in position on the cylinder head assembly.2. Fasten tooling (A) and a hoist to aftercooler housing (2), and put the aftercooler housing in position on the water pipes and cylinder head assembly.3. Put 9S3263 Thread Lock on the threads of the bolts, and install the bolts that hold the aftercooler housing to the cylinder head assembly. 4. Rotate turbocharger tube (3) into position. Place a gasket between the aftercooler housing and adapter, and install four bolts and nuts that hold it. Tighten turbocharger clamp nut (4) to a torque of 18 3 N m (13 2 lb.ft.). Lightly hit all around the clamp with a soft faced hammer, and tighten the clamp nut again to the same torque value. 5. Connect air compressor line (5) and fuel ratio control line (6).6. Fill engine with coolant to the correct level. See the Maintenance Guide.END BY:a. install fuel filter and base

Have questions with 150650-9100?





Group cross 150650-9100 ZEXEL

Nissan 

150650-9100  
9 431 611 232 
16629T9300 
NOZZLE-RETAINING NUT

Nissan-Diesel 

150650-9100  
9 431 611 232 
16629T9300 
NOZZLE-RETAINING NUT
Back to top