105780-0020 ZEXEL 9 432 612 709 BOSCH NOZZLE 9432612709 1057800020


 

Information nozzle

BOSCH 9 432 612 709 9432612709
ZEXEL 105780-0020 1057800020
105780-0020 NOZZLE
Rating:
33
Buy NOZZLE 105780-0020 zexel genuine, new aftermarket engine parts with delivery

Include in #1:

101692-2682 as NOZZLE

Cross reference number

Zexel num
Bosch num
Firm num
Name
105780-0020 
9 432 612 709 
NP-DN4SD24T 
   
NOZZLE
C 50LA NOZZLE N (DN-S) N




Information:

Assemble Governor
*Pump and Governor Reconditioning Tool Group1. Put the fuel injection pump housing in position on Tool (A). Install race (3), bearing (2) and race (1) on the end of the camshaft in the fuel injection pump housing. 2. Put flyweights (5) in position on carrier assembly (4), and install dowels (6) to hold the flyweights in place. The flyweights must move freely on the dowels and have 0.010 to 0.230 mm (.0004 to .0090 in) end play. 3. Install governor shaft (7) on carrier assembly (4). 4. Install dowel (8) in governor shaft (7), and slide carrier assembly (4) down on the governor shaft until dowel (8) fits into the slot in the carrier assembly.5. Install carrier assembly (4) on the end of the camshaft. 6. Install race (12), bearing (11), race (10) and ring (9) on riser (13). 7. Install riser (13) and spring (14), if equipped, on the governor shaft. 8. Install spool (18) and ring (19) on seat (17), and use Tool (B) to install ring (20) to hold them in position.9. Install seat (17) on spring (16) and spring (16) on shield (15). 10. Install dashpot assembly (21) on the governor shaft. 11. Install ring (22) in the groove on the governor shaft. Install sleeve (23), spring (25), the sleeve and bearing (24) on the governor shaft. 12. Use Tool (C) to hold spring (25) under compression, and install the ring in the groove on the governor shaft. 13. Install O-ring seal (26) on sleeve (27). Install piston (29) and sleeve (27) in the governor servo as shown.14. Install valve (28) in the governor servo as shown. 15. Install lockring (33) in the groove near the center of valve (28). Put sleeve (34), spring broken link spring (35) and seat (36) in position on valve (28), and install lockring (37) to hold them in place. 16. Put governor servo (30) in position on the fuel injection pump housing with piston (29) engaged over the rack. Make sure the lever is engaged in the slot groove of riser (13). 17. If dowel (43) was removed, install it in block (44) 31 0.5 mm (1.22 .02 in) above the outside surface of the block.18. Install bolt (45) in block (44) and spring (38) on bolt (45).19. Install stop screw (40) and the locknut on collar (42). Install power setting screw (41) and the locknut on the collar.20. Install collar (42) on bolt (45). Make an alignment of the hole in the collar with the notch in bolt (45), and install bolt (39). 21. If the dowels that align block (44) with the front governor housing were removed, install them 4.0 0.5 mm (.16 .02 in) above the outside surface of the front governor housing.22. Put block (44) in position on the front governor housing with the holes in the block in alignment with dowels in the front governor housing. 23. Install dowels (46) in the front governor housing 6.0 0.5

Have questions with 105780-0020?





Group cross 105780-0020 ZEXEL

Nissan 

9 432 610 398 
NP-DN12SD12T 
KV11257800 
NOZZLE
105780-0020  
9 432 612 709 
NP-DN4SD24T 
 
NOZZLE
 
 

9 432 610 274 
NP-DN6TD119NP1T 
 
NOZZLE

Nissan 

9 443 610 332 
NP-DN0SD1510 
KV11280006 
NOZZLE
9 432 612 710 
NP-DN12SD12T-1 
 
NOZZLE
 
 

9 430 613 459 
 
NOZZLE
Back to top