105141-2810 ZEXEL 9 430 610 380 BOSCH NOZZLE AND HOLDER ASSY. 9430610380 1051412810 1660010h21


 

Information nozzle and holder assy.

BOSCH 9 430 610 380 9430610380
ZEXEL 105141-2810 1051412810
NISSAN-DIESEL 1660010H21 1660010h21
105141-2810 NOZZLE AND HOLDER ASSY.
Rating:
83
Buy NOZZLE AND HOLDER ASSY. 105141-2810 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
105141-2810 
9 430 610 380 
71-1271W 
1660010H21  NISSAN-DIESEL
NOZZLE AND HOLDER ASSY.
SD25 * K 53KG NOZZLE & HOLDER ASSY N&NH KCA-S N&NH




Information:

Start By:a. remove valve covers 1. Remove bolts (1) that hold the valve cover bases to the cylinder head assembly. Remove valve cover bases (2). 2. Use tool (A) to loosen fuel injection line (3) from fuel injection nozzle (4). 3. Use tool (B) to loosen the nut at the fuel injection line adapter end. Remove inner fuel injection lines (3). Install caps and plugs on all fuel injection line openings to keep dirt out of the fuel system. 4. Remove bolts (5) that hold the rocker shaft assemblies to the cylinder head assembly.5. Remove rocker shaft assemblies (6). 6. Put identification marks on the push rods as to their location in the engine. Remove push rods (7). 7. Put identification marks on the bridges as to their location in the engine. Remove bridges (8) from the dowels on the cylinder head assembly.Install Rocker Shaft Assemblies And Push Rods
1. Put clean engine oil on the bridges and dowels. Install the original bridges in their respective locations. New bridges can be mixed.2. Install bridges (8) on the bridge dowels. While firmly pressing 0.5 to 4.5 kg (1 to 10 lb.) straight down on the top contact surface of the bridge, turn the adjusting screw clockwise until contact is made with the valve stem. Turn the screw an additional 20° to 30° (1/3 to 1/2 of 1 hex on nut). This will straighten the dowel in the guide and compensate for the slack in the threads. Hold the adjusting screw in this position, and tighten the locknut to a torque of 30 4 N m (22 3 lb.ft.). Install original push rods in their respective locations in the engine. New push rods can be mixed.3. Install push rods (7). 4. Put rocker shaft assemblies (6) in position on the cylinder head assembly.5. Put clean engine oil on the threads of bolts (5) that hold the shaft assemblies in place. Tighten the bolts first to a torque of 270 25 N m (200 18 lb.ft.). Start with the bolt in the center of the rocker shaft assembly. Tighten the bolts again to a torque of 450 20 N m (330 15 lb.ft.). Tighten the bolts again by hand to a torque of 450 20 N m (330 15 lb.ft.).
Do not cause damage to the O-ring seals on the inner fuel lines.
6. Install inner fuel injection lines (3). Tighten the fuel injection line adapter nuts (9) to a torque of 40 7 N m (30 5 lb.ft.) with tool (B).7. Tighten fuel injection line nut (10) to a torque of 40 7 N m (30 5 lb.ft.) with tool (A).8. Make adjustments to the valves until the intake valve clearance is 0.38 mm (.015 in.) and the exhaust valve clearance is 0.76 mm (.030 in.). See Valve Clearance Setting in Testing And Adjusting. Tighten the locknut to a torque of 30 4 N m (22 3 lb.ft.) and

Have questions with 105141-2810?





Group cross 105141-2810 ZEXEL

Nissan-Diesel 

105141-2810  
9 430 610 380 
71-1271W 
1660010H21 
NOZZLE AND HOLDER ASSY.
SD25

Nissan 

9 430 610 098 
71-1361J 
1660059Y00 
NOZZLE AND HOLDER ASSY.
CD17

Fuji-Heavy 

9 430 610 381 
71-1470A 
2456320100 
NOZZLE AND HOLDER ASSY.
DW100
9 430 610 382 
71-1390A 
2456320200 
NOZZLE AND HOLDER ASSY.
DW100

Nissan 

9 430 610 383 
71-1361J 
1660059Y25 
NOZZLE AND HOLDER ASSY.
CD17

Mazda 

9 430 610 384 
71-1510 
Y01RF7913H50 
NOZZLE AND HOLDER ASSY.
RF

Isuzu 

9 430 610 385 
71-1380C 
8970254660 
NOZZLE AND HOLDER ASSY.
4BD2

Nissan 

9 430 610 386 
71-1361A 
166001C300 
NOZZLE AND HOLDER ASSY.
XM3T

Mazda 

9 430 610 387 
71-1530 
RFD313H50 
NOZZLE AND HOLDER ASSY.
RF
Back to top