105118-5810 ZEXEL 9 430 613 300 BOSCH NOZZLE AND HOLDER ASSY. 9430613300 1051185810 8943946060


 

Information nozzle and holder assy.

BOSCH 9 430 613 300 9430613300
ZEXEL 105118-5810 1051185810
ISUZU 8943946060 8943946060
105118-5810 NOZZLE AND HOLDER ASSY.
Rating:
44
Buy NOZZLE AND HOLDER ASSY. 105118-5810 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
105118-5810 
105118-5811 
9 430 613 300 
8943946060  ISUZU
NOZZLE AND HOLDER ASSY.
6HE1TC * K




Information:

start by:a) remove oil pan1. Turn the crankshaft until two pistons are at bottom center. Remove connecting rod caps (1) from the two connecting rods. Remove the lower half of the bearings from the caps.2. Push the connecting rods away from the crankshaft and remove the upper half of the bearings.
Be careful not to damage the crankshaft journals. Do not turn the crankshaft while any of the connecting rod caps are removed.
Install the bearings dry when the clearance checks are made. Put clean engine oil on the bearings for final assembly.3. Clean the surfaces where the bearings fit. Install the upper half of the bearing in the connecting rod. Pull the connecting rod slowly on to the crankshaft.4. Install lower half of the bearing in the cap.
When the connecting rod caps are installed, make sure that the numbers on the side of the caps are next to and respective with the number on the side of the connecting rods.
Typical Example5. Check the bearing clearance with Plastigage (A). Put Plastigage (A) on the bearing.6. Put 2P2506 Thread Lubricant on the threads of the rod bolts and seat surfaces of the nuts.
Do not use an impact wrench to tighten the nuts the additional 60 5°.
Do not turn the crankshaft when Plastigage (A) is in position. 7. Put caps (1) in position on the connecting rods and install the nuts. Tighten the nuts to a torque of 40 4 N m (30 3 lb.ft.). Put a mark on each nut and the end of each bolt. Tighten the nuts 60 5° more.8. Remove the cap. Measure the thickness of Plastigage (A). The rod bearing clearance must be 0.053 to 0.140 mm (.0021 to .0055 in.). The maximum permissible clearance is 0.15 mm (.006 in.).9. Put the caps in position on the connecting rods and install the nuts. Tighten the nuts to a torque of 40 4 N m (30 3 lb.ft.). Put a mark on each nut and the end of each bolt. Tighten the nuts 60 5° more.10. Do Steps 1 through 9 again for other bearings. end by:a) install oil pan

Have questions with 105118-5810?





Group cross 105118-5810 ZEXEL

Isuzu 

105118-5810  

105118-5811 
9 430 613 300 
8943946060 
NOZZLE AND HOLDER ASSY.
6HE1TC
9 430 612 609 
48-3910 
 
NOZZLE AND HOLDER ASSY.
9 430 612 610 
48-3911 
 
NOZZLE AND HOLDER ASSY.
9 430 613 391 
48-3912 
 
NOZZLE AND HOLDER ASSY.

Isuzu 

9 430 613 301 
48-3913 
8943946063 
NOZZLE AND HOLDER ASSY.
6HE1TC
9 430 612 611 
48-3914 
8943946064 
NOZZLE AND HOLDER ASSY.
6HE1TC
9 430 612 612 
48-3915 
8943946065 
NOZZLE AND HOLDER ASSY.
6HE1TC
9 430 612 613 
48-3915 
8943946066 
NOZZLE AND HOLDER ASSY.
6HE1TC
Back to top