105118-5091 ZEXEL 9 430 612 523 BOSCH NOZZLE AND HOLDER ASSY. 9430612523 1051185091 1153002661


 

Information nozzle and holder assy.

BOSCH 9 430 612 523 9430612523
ZEXEL 105118-5091 1051185091
ISUZU 1153002661 1153002661
105118-5091 NOZZLE AND HOLDER ASSY.
Rating:
15
Buy NOZZLE AND HOLDER ASSY. 105118-5091 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
105118-5091 
105118-5092 
9 430 612 523 
48-3520K 
1153002661  ISUZU
NOZZLE AND HOLDER ASSY.
6BG1TC * K 53KR N&NH KBDL-P N&NH




Information:

start by: a) remove oil pump1. Check the main bearing caps for identification for their location and direction in the block. The caps must be installed in the same location and direction from which they were removed. 2. Remove No. 2 through No. 6 bearing caps (1). Remove thrust plates from No. 4 main bearing. 3. Remove the upper halves of main bearings by putting tool (A) in oil (2) in the crankshaft. Turn the crankshaft in the direction which will push the end of the bearing with a tab out first.
If the crankshaft is turned in the wrong direction, the tab of the bearing will be pushed between the crankshaft and cylinder block. This can cause damage to either or both.
4. Remove the lower halves of the bearings from the caps. Install the bearings dry when the clearance checks are made. Put clean engine oil on the bearings for final assembly.5. Install new bearings in the caps.6. Install the upper halves of the bearings in the cylinder block with tool (A). Be sure tabs (3) on the back of the bearings fit in the grooves of the caps and cylinder block.7. Check the bearing clearance with Plastigage (B). Put Platigage (B) on the bearings. Do not turn the crankshaft when Plastigage (B) is in position.
Be sure the main bearing caps are installed so the numbers on the side of the cylinder block are the same as the numbers on the bearing caps, and the arrows (4) on the bearing caps are toward the front of the cylinder block.
When the bearing clearance is checked and the engine is in a vertical position, such as in the vehicle, the crankshaft will have to be lifted up with a force equal to the weight of the crankshaft and held against the upper halves of the main bearings to get a correct measurement with Plastigage (B). The Plastigage will not hold the weight of the crankshaft and give a correct indication. If the engine is in a horizontal position, such as on an engine stand, it is not necessary to hold the crankshaft up. Do not turn crankshaft when Plastigage is in position to check clearance.
Do not use an impact wrench to tighten the bolts the additional 120° 5°.
8. Install the bearing caps for No. 2 through No. 6 main bearings. Put clean engine oil on the bolts. Install the bolts and tighten bolts, at end, with tab first, to a torque of 190 10 lb. ft. (260 14 N m). Turn the bolts an extra 120° 5° first at the end opposite of the tab. Remove the bearing caps for No. 2 through No. 6 main bearings. Remove Plastigage (B) from the caps. Check the thickness of Plastigage (B) to find the bearing clearance. The bearing clearance must be .0036 to .0073 in. (0.091 to 0.185 mm) with new bearings. Maximum clearance with used bearings is .010 in. (0.25 mm).9. Put clean engine oil on the

Have questions with 105118-5091?





Group cross 105118-5091 ZEXEL

Isuzu 

 
1153002660 
NOZZLE AND HOLDER ASSY.
6BG1TC
105118-5091  

105118-5092 
9 430 612 523 
48-3520K 
1153002661 
NOZZLE AND HOLDER ASSY.
6BG1TC
9 430 613 319 
1153002662 
NOZZLE AND HOLDER ASSY.
6BG1TC
9 430 612 524 
48-3860F 
 
NOZZLE AND HOLDER ASSY.

Isuzu 

9 430 613 289 
1153002663 
NOZZLE AND HOLDER ASSY.
6BG1TC
9 430 613 290 
48-3862F 
1153002664 
NOZZLE AND HOLDER ASSY.
6BG1TC
Back to top