105114-5193 ZEXEL 9 430 613 267 BOSCH NOZZLE AND HOLDER ASSY. 9430613267 1051145193 c42171a004r6


 

Information nozzle and holder assy.

BOSCH 9 430 613 267 9430613267
ZEXEL 105114-5193 1051145193
KAWASAKI-H.I. C42171A004R6 c42171a004r6
105114-5193 NOZZLE AND HOLDER ASSY.
Rating:
74
Buy NOZZLE AND HOLDER ASSY. 105114-5193 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
105114-5193 
105114-5194 
9 430 613 267 
44-1003B 
C42171A004R6  KAWASAKI-H.I.
NOZZLE AND HOLDER ASSY.
V25/25S * K 30AB N&NH(KBF) N&NH




Information:

2. Disconnect the fuel injection lines (2) from pump housing. Put plugs or caps in all lines and openings.3. Remove the three bolts that hold the fuel filter (3) to the aftercooler housing.4. Disconnect the sensing line (1) for the fuel ratio control from the aftercooler housing. 5. Disconnect the oil supply line (4) from the turbocharger.6. Remove the two water lines (5). 7. Disconnect the water outlet line (6) for the air compressor from the cylinder head.8. Remove the bolts (7) that fasten the cylinder head to the cylinder block. 9. Install 3/8"-16NC forged eyebolts in the cylinder head. Fasten a hoist and remove the cylinder head assembly. Weight of cylinder head assembly is 575 lb. (260 kg). Be sure to install a new gasket between the spacer plate and the cylinder block before installing the cylinder head assembly. See REMOVE and INSTALL SPACER PLATE in DISASSEMBLY AND ASSEMBLY.Install Cylinder Head Assembly
1. Clean the top surface of spacer plate and the surface it is in contact with on the cylinder head.2. Install the cylinder head gasket, water seals, and gasket on timing gear cover. 3. Install the 3/8"-16NC forged eyebolts in the cylinder head. Fasten a hoist and put the cylinder head assembly into position on the engine. Make sure the gear (1) in cylinder head is engaged with drive gear (2). 4. Put 9M3710 Anti-Seize Compound on the threads of the bolts for cylinder head. Install the bolts and washers. Tighten the bolts as follows: 1 -Tighten all bolts in number order to 135 lb.ft. (18.7 mkg).2 -Tighten all bolts in number order to 185 5 lb.ft. (25.6 0.7 mkg).3 -Tighten all bolts using hand torque only to 185 5 lb.ft. (25.6 0.7 mkg). 5. Install the two water lines (4).6. Connect the oil supply line (3) to the turbocharger.7. Connect the water outlet line (5) for the air compressor to the cylinder head. 8. Connect the sensing line (6) for the fuel ratio control to the aftercooler housing.9. Put the fuel filter in position, and install the three bolts.10. Remove the plugs and fuel injection lines and pumps. Connect the fuel injection lines (7) to the pumps. Tighten the nuts on fuel lines to 30 5 lb.ft. (4.1 0.7 mkg).11. Fill the cooling system with coolant.end by: a) install camshaft housingb) install fan drive

Have questions with 105114-5193?





Group cross 105114-5193 ZEXEL

Kawasaki-H.I. 

9 430 613 268 
 
NOZZLE AND HOLDER ASSY.
V25/25S
9 430 612 349 
44-1003B 
 
NOZZLE AND HOLDER ASSY.
V25/25S

Kawasaki-Heavy 

9 430 612 350 
C42171A004R6 
NOZZLE AND HOLDER ASSY.
V2525S

Kawasaki-H.I. 

9 430 612 350 
 
NOZZLE AND HOLDER ASSY.
V2525S
105114-5193  

105114-5194 
9 430 613 267 
44-1003B 
C42171A004R6 
NOZZLE AND HOLDER ASSY.
V25/25S
9 430 613 373 
44-1003C 
C42171A004R7 
NOZZLE AND HOLDER ASSY.
V25/25S
Back to top