105100-4521 ZEXEL 9 430 610 785 BOSCH NOZZLE AND HOLDER ASSY. 9430610785 1051004521 236001212a


 

Information nozzle and holder assy.

BOSCH 9 430 610 785 9430610785
ZEXEL 105100-4521 1051004521
HINO 236001212A 236001212a
105100-4521 NOZZLE AND HOLDER ASSY.
Rating:
71
Buy NOZZLE AND HOLDER ASSY. 105100-4521 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
105100-4521 
9 430 610 785 
31-5350D 
236001212A  HINO
NOZZLE AND HOLDER ASSY.
EF500 * K 53KB N&NH KBL-S N&NH




Information:

Start By:a. remove timing gear cover
Do not disconnect the air line from the air compressor governor until the air pressure is zero.
1. Loosen the bleed valves, and release the air pressure in the air tank. 2. Disconnect the lines from air compressor (1), and remove the air compressor. 3. Remove sleeve (2) from air compressor drive gear (3). 4. Remove the nut and washer that holds the air compressor drive gear to the air compressor. Use tooling (A) to remove air compressor drive gear (3) from the air compressor. 5. Remove nuts (4) and plate (5). Remove gear assembly (6) from the shaft. 6. If damaged, remove bearing (7) from gear assembly (6) with tooling (B) and a press. 7. Remove three nuts (8) and the washers from the adapter assembly studs.
Typical Example8. Remove adapter assembly (9) from the timing gear plate. 9. Remove shaft (10), O-ring seal (11) and sleeve (12) from the adapter assembly.Install Air Compressor And Accessory Drive
1. Install sleeve (12) into the adapter assembly.2. Install shaft (10) and O-ring seal (11) on the adapter assembly. 3. Put adapter assembly (9) in position on the timing gear plate. Fasten it with the three nuts and washers. 4. Install the bearing in gear assembly (6) with tooling (A) and a press. Install the bearing until it is 1.5 0.5 mm (.06 .02 in.) below the surface of the gear as shown. 5. Put gear assembly (6) in position on the shaft.6. Put plate (5) in position, and install three nuts (4) to hold it. 7. Put air compressor drive gear (3) in position on the air compressor shaft, and install the washer and nut (13). Tighten the nut to a torque of 200 25 N m (150 18 lb.in.). Tap the gear with a hammer and tighten nut (13) again to a torque of 200 25 N m (150 18 lb.ft.). 8. Install sleeve (2) on gear (3). 9. Put a gasket in position on air compressor (1) and install the air compressor on the timing cover plate.End By:a. install timing gear cover

Have questions with 105100-4521?





Group cross 105100-4521 ZEXEL

Nissan-Diesel 

9 430 610 782 
31-4370A 
1660096501 
NOZZLE AND HOLDER ASSY.
PE
9 430 610 783 
31-4210R5 
1660097011 

Hino 

9 430 610 784 
31-5310D 
236001210A 
NOZZLE AND HOLDER ASSY.
9 430 610 784 
31-5310D 
236001211A 
NOZZLE AND HOLDER ASSY.
105100-4521  
9 430 610 785 
31-5350D 
236001212A 
NOZZLE AND HOLDER ASSY.
EF500
9 430 610 786 
31-5300D 
236001026A 
NOZZLE AND HOLDER ASSY.
EK100
9 430 610 787 
31-5300C 
236001220A 
NOZZLE AND HOLDER ASSY.
EK100

Nissan-Diesel 

9 430 610 788 
31-4210R6 
1660097012 
NOZZLE AND HOLDER ASSY.
RD8

Hino 

9 430 610 789 
31-5320C 
236001200A 
NOZZLE AND HOLDER ASSY.
EV700

Nissan-Diesel 

9 430 610 790 
31-4370ET 
1660096502 
NOZZLE AND HOLDER ASSY.
PE6T

Isuzu 

9 430 610 023 
31-3471K 
5153000890 
NOZZLE AND HOLDER ASSY.
6BD1
9 430 610 791 
31-3952K 
5153000891 
NOZZLE AND HOLDER ASSY.
6BD1

Nissan-Diesel 

9 430 610 792 
31-4210A 
1660097013 
NOZZLE AND HOLDER ASSY.
RD10
Back to top