Information nozzle-holder
BOSCH
9 430 615 311
9430615311
ZEXEL
105048-3915
1050483915
ISUZU
8943951971
8943951971

Rating:
Scheme ###:
8. | [1] | 150562-4300 | COMPRESSION SPRING |
10. | [1] | 150560-0900 | SLOTTED WASHER |
16. | [2] | 150508-5900 | BEARING PIN |
18. | [1] | 150524-4800 | SPACER BUSHING |
22. | [1] | 150655-0000 | NOZZLE-RETAINING NUT |
37. | [1] | 150628-2400 | FLANGE BUSHING |
800S/1. | [1] | 150591-1000 | SHIM D7.2&3.6T0.10 |
800S/1. | [1] | 150591-2000 | SHIM D7.2&3.6T0.20 |
800S/1. | [1] | 150591-3000 | SHIM D7.2&3.6T0.30 |
800S/1. | [1] | 150591-4000 | SHIM D7.2&3.6T0.40 |
800S/1. | [1] | 150591-5000 | SHIM D7.2&3.6T0.50 |
800S/1. | [1] | 150591-5100 | SHIM D7.2&3.6T0.51 |
800S/1. | [1] | 150591-5200 | SHIM D7.2&3.6T0.52 |
800S/1. | [1] | 150591-5300 | SHIM D7.2&3.6T0.53 |
800S/1. | [1] | 150591-5400 | SHIM D7.2&3.6T0.54 |
800S/1. | [1] | 150591-5500 | SHIM D7.2&3.6T0.55 |
800S/1. | [1] | 150591-5600 | SHIM D7.2&3.6T0.56 |
800S/1. | [1] | 150591-5700 | SHIM D7.2&3.6T0.57 |
800S/1. | [1] | 150591-5800 | SHIM D7.2&3.6T0.58 |
800S/1. | [1] | 150591-5900 | SHIM D7.2&3.6T0.59 |
802S. | [2] | 139508-0000 | GASKET D13.2&8.2T1 |
803S. | [1] | 139808-0000 | EYE BOLT |
Include in #1:
107692-1091
as NOZZLE-HOLDER
Cross reference number
Zexel num
Bosch num
Firm num
Name
105048-3915
9 430 615 311
8943951971 ISUZU
NOZZLE-HOLDER
K 53LZ NOZZLE HOLDER NH NH
K 53LZ NOZZLE HOLDER NH NH
Information:
Start By:a. disassemble governorb. remove fuel injection pumps 1. Remove rack (1) from the fuel pump housing. 2. Remove six lifters (2) from the fuel pump housing. Put identification marks on the lifters for installation purposes. 3. Remove camshaft (3) from the fuel pump housing. It may be necessary to use a soft hammer to push the camshaft out of the governor end of the fuel pump housing. 4. Remove races (4) and bearing (5) from the camshaft. Remove ring (6) if necessary. 5. Remove rack bearing (7) from both ends of the housing and dowel (8) if necessary. 6. Use tooling (A), and remove three camshaft bearings (9). 7. Remove the bolts, cover (10) and the gasket. 8. Remove pins (12), the seal and dowels (11) if necessary. Pins (12) must be pushed from the inside out.Assemble Fuel Injection Pump Housing
1. Clean and inspect all parts. Make a replacement of all parts that are worn or damaged. 2. Lubricate the seal with clean engine oil, and install pin (1). Pin (1) must protrude into the pump bore 2.15 .05 mm (.085 .002 in).3. Install dowel (2) so that it protrudes into the pump bore 1.93 0.05 mm (.076 .002 in). 4. Install the gasket, cover (3) and the bolts. 5. Install the rack bearing with tooling (A). Install the bearing until the driver comes in contact with the plate. The bearing should be installed to a depth of 83.0 0.5 mm (3.27 .02 in) from the fuel pump mounting face. 6. Measure rack bearing (4). Dimension (X) must be 11.178 0.05 mm (.4400 .002 in). Diameter (W) must be 12.767 0.058 mm (.5026 .0022 in). 7. Install dowel (5). Dowel (5) must protrude 6.0 0.5 mm (.24 .02 in) from the fuel pump housing face.8. Install the rear rack bearing with tooling (B) to a depth of 7.16 0.13 mm (.282 .005 in) below the fuel pump housing surface. The inside diameter of the rear rack bearing must be 12.746 0.045 mm (.5018 .0017 in). 9. Use tooling (C), and install three camshaft bearings (6). Oil holes (7) in the camshaft bearings must be positioned 30° 3° above the horizontal centerline toward the engine side of the fuel pump housing. The outer bearings must be installed 1.0 0.5 mm (0.04 0.02 in) below the surface marked (Z). The inner bearing must be installed 218.0 0.3 mm (8.58 .012 in) below the front surface (Y). Diameter (XX) must be 68.339 0.038 mm (2.6905 .0015 in) after assembly. 10. Install ring (8), races (10) and bearing (9) on the camshaft. 11. Lubricate cam bearings (6) and the camshaft bearing journals with clean engine oil.12. Install camshaft (11) into the fuel pump housing.
The notch in the lifter must be in line with the dowel in the lifter bore. The lifter must slide up and down freely in
1. Clean and inspect all parts. Make a replacement of all parts that are worn or damaged. 2. Lubricate the seal with clean engine oil, and install pin (1). Pin (1) must protrude into the pump bore 2.15 .05 mm (.085 .002 in).3. Install dowel (2) so that it protrudes into the pump bore 1.93 0.05 mm (.076 .002 in). 4. Install the gasket, cover (3) and the bolts. 5. Install the rack bearing with tooling (A). Install the bearing until the driver comes in contact with the plate. The bearing should be installed to a depth of 83.0 0.5 mm (3.27 .02 in) from the fuel pump mounting face. 6. Measure rack bearing (4). Dimension (X) must be 11.178 0.05 mm (.4400 .002 in). Diameter (W) must be 12.767 0.058 mm (.5026 .0022 in). 7. Install dowel (5). Dowel (5) must protrude 6.0 0.5 mm (.24 .02 in) from the fuel pump housing face.8. Install the rear rack bearing with tooling (B) to a depth of 7.16 0.13 mm (.282 .005 in) below the fuel pump housing surface. The inside diameter of the rear rack bearing must be 12.746 0.045 mm (.5018 .0017 in). 9. Use tooling (C), and install three camshaft bearings (6). Oil holes (7) in the camshaft bearings must be positioned 30° 3° above the horizontal centerline toward the engine side of the fuel pump housing. The outer bearings must be installed 1.0 0.5 mm (0.04 0.02 in) below the surface marked (Z). The inner bearing must be installed 218.0 0.3 mm (8.58 .012 in) below the front surface (Y). Diameter (XX) must be 68.339 0.038 mm (2.6905 .0015 in) after assembly. 10. Install ring (8), races (10) and bearing (9) on the camshaft. 11. Lubricate cam bearings (6) and the camshaft bearing journals with clean engine oil.12. Install camshaft (11) into the fuel pump housing.
The notch in the lifter must be in line with the dowel in the lifter bore. The lifter must slide up and down freely in
Have questions with 105048-3915?
Group cross 105048-3915 ZEXEL
Isuzu
105048-3915
9 430 615 311
8943951971
NOZZLE-HOLDER