Information nozzle-holder
BOSCH
9 430 615 747
9430615747
ZEXEL
105041-3162
1050413162
ISUZU
1153301222
1153301222

Rating:
Scheme ###:
8. | [1] | 150562-6500 | COMPRESSION SPRING |
10. | [1] | 150560-2001 | SLOTTED WASHER |
11. | [1] | 150624-1800 | BUSHING |
12. | [1] | 150562-6600 | COMPRESSION SPRING |
15. | [1] | 150560-2100 | SLOTTED WASHER |
18. | [1] | 150524-6200 | SPACER BUSHING |
19. | [2] | 150508-3300 | BEARING PIN |
22. | [1] | 150651-9800 | NOZZLE-RETAINING NUT |
23. | [1] | 016550-1220 | O-RING |
800S/1. | [1] | 150539-0700 | SHIM D8.9&3.8T0.40 |
800S/1. | [1] | 150539-0800 | SHIM D8.9&3.8T0.50 |
800S/1. | [1] | 150539-0900 | SHIM D8.9&3.8T0.52 |
800S/1. | [1] | 150539-1000 | SHIM D8.9&3.8T0.54 |
800S/1. | [1] | 150539-1100 | SHIM D8.9&3.8T0.56 |
800S/1. | [1] | 150539-1200 | SHIM D8.9&3.8T0.58 |
800S/1. | [1] | 150539-1300 | SHIM D8.9&3.8T0.60 |
800S/1. | [1] | 150539-1400 | SHIM D8.9&3.8T0.70 |
801S/1. | [1] | 150590-0600 | SHIM D9.9&4.8T0.40 |
801S/1. | [1] | 150590-0700 | SHIM D9.9&4.8T0.50 |
801S/1. | [1] | 150590-0800 | SHIM D9.9&4.8T0.52 |
801S/1. | [1] | 150590-0900 | SHIM D9.9&4.8T0.54 |
801S/1. | [1] | 150590-1000 | SHIM D9.9&4.8T0.56 |
801S/1. | [1] | 150590-1100 | SHIM D9.9&4.8T0.58 |
801S/1. | [1] | 150590-1200 | SHIM D9.9&4.8T0.60 |
801S/1. | [1] | 150590-1300 | SHIM D9.9&4.8T0.70 |
802S. | [0] | 150583-0000 | STOP PIN L36.06 |
Cross reference number
Zexel num
Bosch num
Firm num
Name
Information:
Camshaft rotation counterclockwise in view shown.Firing order (injection sequence) ... 1, 5, 3, 6, 2, 4Injection timing before TC (top center):Precombustion Chamber (PC) ... 10 1°*Direct Injection (DI) ... 29 1°*Direct Injection (DI) ... 28 1°*Direct Injection (DI) ... 26.5 1°*Direct Injection (DI) ... 22.5 1°*Make reference to DI FUEL SYSTEM CHART in FUEL SYSTEM IDENTIFICATION section to find correct injection pump groups.(1) Torque for bushing ... 150 10 lb. ft.(205 14 N m)
A - 8S7167 GAUGE
B - 5P4158 GAUGE (5) Bore for the rack and diameter of the rack: Bearing at the rear (new) ... .5018 .0018 in.(12.746 0.046 mm)Bearing at the front (new) ... .5023 .0018 in.(12.758 0.046 mm)Diameter of fuel rack (new) ... .4985 .0002 in.(12.662 0.005 mm)Maximum permissible clearance between rack and bearings (worn) ... .007 in.(0.18 mm)(6) Bore in bearings for the camshaft (new) ... 2.1255 .0015 in.(53.988 0.038 mm) Diameter of bearing surfaces of the camshaft (new) ... 2.1220 .0005 in.(53.899 0.013 mm)Maximum permissible clearance between the bearings and the camshaft ... .010 in.(0.25 mm)
PRECHAMBER(9) Torque for all nuts that hold the fuel lines ... 30 5 lb. ft.(40 7 N m)(10) Torque for the nuts that hold the nozzles ... 55 5 lb. ft.(75 7 N m)(11) Body.
DIRECT INJECTION(12) Nozzle. Tighten nozzle finger tight on body (11).(13) Torque for precombustion chamber or direct injection adapter ... 150 10 lb. ft.(205 14 N m)(14) Torque for glow plug ... 120 24 lb. in.(13.6 2.8 N m)
A - 8S7167 GAUGE
B - 5P4158 GAUGE (5) Bore for the rack and diameter of the rack: Bearing at the rear (new) ... .5018 .0018 in.(12.746 0.046 mm)Bearing at the front (new) ... .5023 .0018 in.(12.758 0.046 mm)Diameter of fuel rack (new) ... .4985 .0002 in.(12.662 0.005 mm)Maximum permissible clearance between rack and bearings (worn) ... .007 in.(0.18 mm)(6) Bore in bearings for the camshaft (new) ... 2.1255 .0015 in.(53.988 0.038 mm) Diameter of bearing surfaces of the camshaft (new) ... 2.1220 .0005 in.(53.899 0.013 mm)Maximum permissible clearance between the bearings and the camshaft ... .010 in.(0.25 mm)
PRECHAMBER(9) Torque for all nuts that hold the fuel lines ... 30 5 lb. ft.(40 7 N m)(10) Torque for the nuts that hold the nozzles ... 55 5 lb. ft.(75 7 N m)(11) Body.
DIRECT INJECTION(12) Nozzle. Tighten nozzle finger tight on body (11).(13) Torque for precombustion chamber or direct injection adapter ... 150 10 lb. ft.(205 14 N m)(14) Torque for glow plug ... 120 24 lb. in.(13.6 2.8 N m)