105040-2180 ZEXEL 9 430 615 107 BOSCH NOZZLE-HOLDER 9430615107 1050402180 0423401091


 

Information nozzle-holder

BOSCH 9 430 615 107 9430615107
ZEXEL 105040-2180 1050402180
MITSUBISHI-HEAV 0423401091 0423401091
105040-2180 NOZZLE-HOLDER
Rating:
27
Buy NOZZLE-HOLDER 105040-2180 zexel genuine, new aftermarket engine parts with delivery

Scheme ###:

4. [1] 150550-3700 STOP PIN
6. [1] 150562-1600 COMPRESSION SPRING
8. [1] 150565-2300 THREADED PIN
10. [1] 150567-3101 CAP NUT
11. [1] 029331-6030 GASKET
13. [1] 150524-3600 SPACER BUSHING
20. [1] 150650-6400 NOZZLE-RETAINING NUT
21. [1] 029300-5070 GASKET D12&5T1
22. [1] 150645-1600 INLET UNION

Cross reference number

Zexel num
Bosch num
Firm num
Name
105040-2180 
9 430 615 107 
0423401091  MITSUBISHI-HEAV
NOZZLE-HOLDER
K 53LZ NOZZLE HOLDER NH NH




Information:

3. Remove bearing caps (1) from the two connecting rods. Put pieces of rubber hose or tape on the threads of the connecting rod bolts as protection for the crankshaft. 4. Push the pistons up until the piston rings are clear of the cylinder liner. Remove pistons (2). Keep each cap with its connecting rod.
Do not turn the crankshaft while any of the connecting rods are in the engine without the caps installed. Do not cause damage to the cooling tubes when the pistons are removed.
5. Do Steps 1 through 4 for the remainder of the pistons.Install Pistons
1. Put clean engine oil on the piston rings and cylinder liners. 2. Put two pistons in position opposite of each other in the correct bore of the block. Install pistons (1) with tool (A).
Make sure that the pistons are installed with flat surfaces (2) of the connecting rods toward each other and the chamfered sides (4) toward the crankshaft.
For more detail about the installation of connecting rod bearings see REMOVE AND INSTALL CONNECTING ROD BEARINGS.3. Check the bearing clearances with tool (B). 4. Put clean engine oil on bolts (5) and the connecting rod bearings. Install caps (3) and nuts finger tight. Tighten each nut to a torque of 60 6 lb.ft. (80 8 N m). Put a mark across the nuts and bolts. Tighten each nut 120° more.5. Check the side clearance between two connecting rods on the same crankshaft journal. Clearance must be .011 to .033 in. (0.28 to 0.84 mm) for new rods.6. Do Steps 1 through 5 for the remainder of the pistons.

Have questions with 105040-2180?





Group cross 105040-2180 ZEXEL

9 430 615 812 
 
NOZZLE-HOLDER ASSEMBLY

Mitsubishi 

9 430 615 848 
0423401080 
NOZZLE-HOLDER

Mitsubishi-Heav 

9 430 615 848 
0423401084 
NOZZLE-HOLDER
9 430 615 368 
 
NOZZLE-HOLDER ASSEMBLY

Mitsubishi-Heav 

105040-2180  
9 430 615 107 
0423401091 
NOZZLE-HOLDER

Shinko-Engin. 

9 430 615 849 
0151991040 
NOZZLE-HOLDER
Back to top