105031-4620 ZEXEL 9 430 615 163 BOSCH NOZZLE-HOLDER 9430615163 1050314620 1661095002


 

Information nozzle-holder

BOSCH 9 430 615 163 9430615163
ZEXEL 105031-4620 1050314620
NISSAN-DIESEL 1661095002 1661095002
105031-4620 NOZZLE-HOLDER
Rating:
27
Buy NOZZLE-HOLDER 105031-4620 zexel genuine, new aftermarket engine parts with delivery

Scheme ###:

2. [2] 150508-3300 BEARING PIN
4. [1] 150550-3600 STOP PIN
6. [1] 150562-1400 COMPRESSION SPRING
8. [1] 150565-2001 THREADED PIN
10. [1] 150567-7000 CAP NUT
11. [1] 029331-4130 GASKET
20. [1] 150601-8900 NOZZLE-RETAINING NUT
21. [1] 150602-2700 GASKET D12&3.5T1.00
22. [1] 150645-6200 INLET UNION

Cross reference number

Zexel num
Bosch num
Firm num
Name
105031-4620 
9 430 615 163 
1661095002  NISSAN-DIESEL
NOZZLE-HOLDER
K 53LZ NOZZLE HOLDER NH NH




Information:

1. Disconnect the fuel outlet line (1) and fuel inlet line (3) from the priming pump.2. Disconnect the fuel line (2) from pump.3. Remove the bolts (4) from pump.4. Remove the fuel transfer pump.5. Remove the fuel lines (1) and (3) from pump.Install Fuel Transfer Pump
1. Install the two fuel lines in transfer pump.2. Put the fuel transfer pump in position in the accessory drive housing, and install the two bolts.3. Connect the two fuel lines to priming pump.4. Connect the fuel line to transfer pump.Disassemble Fuel Transfer Pump
start by: a) remove fuel transfer pump 1. Remove the nut (2), gear (3), and key.2. Remove the cage (1). Remove the O-ring seals from the cage.3. Use tool setup (A) to remove the bearing and seals from cage (1).4. Remove the cover (4).
Be careful during disassembly and assembly of pump to prevent damage to the contacting surfaces of the cover (4) and the pump body.
5. Remove the bolt (5), spring, and ball for the check valve for the priming pump. 6. Remove the gear (7), and gear and shaft assembly (6) from pump body. 7. Use tool setup (A) to remove the bearing from the pump body.Assemble Fuel Transfer Pump
1. Clean all parts thoroughly before assembling the pump. 2. Use tool setup (A) to install the bearing in the pump body.3. Put the gear, and gear and shaft assembly in position in pump body.4. Put a thin amount of 8S6747 Liquid Gasket Material on the face of body assembly that is against the cover.
Do not let the liquid gasket material get into the pump.
5. Put the cover into position on pump body and install the bolts. The gear and shaft assembly must turn freely after the bolts in cover have been tightened.6. Install the check valve ball, spring, and bolt for the priming pump in the cover. 7. Use tool setup (B) to install the seals in cage. Install the two seals with the lips of seals toward each other.8. Use tool setup (A) to install the bearing in cage assembly. Install the O-ring seals on cage. 9. Put clean oil on O-ring seals and lips of seals. 10. Put the cage assembly in position, and install the woodruff key, gear, and nut. Tighten nut to 22 5 lb.ft. (3.0 0.7 mkg).end by: a) install fuel transfer pump

Have questions with 105031-4620?





Group cross 105031-4620 ZEXEL

Nissan 

9 430 615 162 
16610T9300 
NOZZLE-HOLDER

Nissan-Diesel 

9 430 615 162 
16610T9300 
NOZZLE-HOLDER
 
 
NOZZLE-HOLDER
9 430 616 129 
 
NOZZLE-HOLDER ASSEMBLY

Nissan-Diesel 

105031-4620  
9 430 615 163 
1661095002 
NOZZLE-HOLDER
9 430 615 235 
1661096003 
NOZZLE-HOLDER
 
16610Z5509 
NOZZLE-HOLDER
9 430 615 039 
16610Z5510 
NOZZLE-HOLDER
9 430 616 218 
 
NOZZLE-HOLDER ASSEMBLY

Nissan-Diesel 

9 430 615 917 
16610Z5511 
NOZZLE-HOLDER
Back to top