105025-4510 ZEXEL 9 432 613 004 BOSCH NOZZLE 9432613004 1050254510 34a6104900


 

Information nozzle

BOSCH 9 432 613 004 9432613004
ZEXEL 105025-4510 1050254510
MITSUBISHI-HEAV 34A6104900 34a6104900
105025-4510 NOZZLE
Rating:
13
Buy NOZZLE 105025-4510 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
105025-4510 
9 432 613 004 
NP-DLLA158SM451 
34A6104900  MITSUBISHI-HEAV
NOZZLE
A C 50LC N (DLL-S) N




Information:

9. Remove bracket assembly (16) and link (17). 10. Put identification marks on fuel racks (18) and (19), and remove the fuel racks. 11. Put identification marks on each spacer (20) and lifter (21) so they can be installed in their original position. 12. Remove fuel injection pump camshaft (22) from the pump housing.13. Remove O-ring seal (23). 14. Inspect link pivot shaft (24) and bracket locating pin (25). Make a replacement by removal of shaft (24) and dowel (25) with Tool (D). 15. Inspect upper bearing (26) and the lower bearing that hold the pinion gear in the pump housing.16. Make a replacement of bearings (26) if necessary.17. Inspect idler gear shaft (27). If a replacement is necessary, remove the shaft with Tooling (D). 18. Inspect fuel rack bearings (28) and camshaft bearings (29). If a replacement is necessary, remove bearings (28) and (29).19. Use Tooling (E) to remove bearings (28). 20. Remove regulator valve (30). 21. Remove pin (31) to disassemble the regulator valve, and inspect the components.22. Piston (32) must move freely in valve body (30).23. Make a reference to the Specifications for spring (34).24. Make a replacement of O-ring seals (33).Assemble Fuel Injection Pump Housing
Pin (2) must not extend out of either side of valve body (3).
1. Install spring (4), piston (1) and pin (2) in valve body (3).2. Put clean engine oil on the valve body and O-ring seals (5). Install the oil bypass valve in the pump housing. Tighten the bypass valve body to a torque of 68 14 N m (50 10 lb ft). 3. Install the camshaft front and rear bearings with Tooling (A). Install the front bearing until it is a distance of 1.0 0.5 mm (.04 .02 in) from the front surface of the pump housing. Make sure both oil holes in bearing are in alignment with the oil holes in the pump housing. 4. Put Tool (B) in the fuel pump housing with the dowels of Tool (B) in alignment with the left fuel rack bore. Install the bolt that holds the tool in place on the housing.5. Put a new bearing in position with the tab of the bearing up. Install the bearing with Tool (C) until the shoulder of Tool (C) makes contact with Tool (B).6. Turn Tool (B), and make an alignment of the dowels on Tool (B) with the right fuel rack bore.7. Do Step 3 again for the left fuel rack bearing. 8. Install shaft (6) to a height of 16.8 0.5 mm (.66 .02 in). 9. Make sure the chamfer on the lower bearing for the pinion gear is toward the inside and the notch is in the location shown. Install the bearing 28.4 0.5 mm (1.12 .02 in) below the bearing bore surface with Tooling (D).10. Make sure the chamfer on the upper bearing for the pinion gear is toward the inside and the notch is in the location shown. Use

Have questions with 105025-4510?





Group cross 105025-4510 ZEXEL

Isuzu 

9 432 613 008 
NP-DLLA156SM450 
1153113250 
NOZZLE

Mitsubishi-Heav 

105025-4510  
9 432 613 004 
NP-DLLA158SM451 
34A6104900 
NOZZLE

Isuzu 

F 01G 29U 003 
NP-DLLA150SM452 
8980467090 
NOZZLE

Komatsu 

F 01G 29U 00D 
NP-DLLA133SM453 
6212162120 
NOZZLE

Mitsubishi-Heav 

9 432 613 025 
NP-DLLA158SM454 
3266100900 
NOZZLE

Isuzu 

 
8980670130 
NOZZLE
F 01G 09X 00R 
NP-DLLA142SM456 
8980681760 
NOZZLE

Yanmar 

F 01G 29U 01U 
NP-DLLA123SM457 
12667753100 
NOZZLE

Mitsubishi-Heav 

 
3636101600 
NOZZLE

Komatsu 

 
6152153910 
NOZZLE
Back to top