105025-4370 ZEXEL 9 432 612 939 BOSCH NOZZLE 9432612939 1050254370 236402951a


 

Information nozzle

BOSCH 9 432 612 939 9432612939
ZEXEL 105025-4370 1050254370
HINO 236402951A 236402951a
105025-4370 NOZZLE
Rating:
17
Buy NOZZLE 105025-4370 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
105025-4370 
9 432 612 939 
NP-DLLA157SM437 
236402951A  HINO
NOZZLE
A 50LC NOZZLE N (DLL-S) N




Information:

Start By:a. remove timing gear cover1. Time the engine as follows:a. Install Tool (A) in the flywheel housing.b. Remove the cover from the side of the fuel injection pump housing so the timing pin can be installed. Remove the plug from the flywheel housing so the timing bolt can be installed.c. Turn the engine in the direction of engine rotation until Tool (B) can be installed in fuel injection pump housing and located in the groove in the fuel injection pump camshaft, a 3/8" - 16 NC bolt can be installed in the flywheel through the hole in the flywheel housing, and the "C" marks on the crankshaft gear and the camshaft gear are in alignment with each other. 2. Loosen bolt (1) until there is approximately 3.18 mm (.125 in) gap between washer (2) and fuel pump drive gear (3).3. Install Tool (C) as shown, and loosen the fuel pump drive gear from the taper on the fuel injection pump camshaft. Remove Tool (C), the bolt, washer and fuel pump drive gear.4. Remove the bolts and plate (4) that hold idler gear (5) in position. Remove the idler gear. If necessary, remove the bearing from the idler gear with Tool (D) and a press.
Do not turn the crankshaft after camshaft gear (6) has been removed. Turning the crankshaft will cause damage to the valves.
5. Remove the four bolts that hold camshaft gear (6) to the camshaft. Remove the camshaft gear.Install Timing Gears
1. Make an alignment of the "C" marks on crankshaft gear (3) and camshaft gear (4). Install the camshaft gear and the bolts that hold it. Tighten the bolts to a torque of 55 7 N m (41 5 lb ft).2. Install the bearing in idler gear (1) with Tool (A). The end of the bearing must be 1.52 mm (.060 in) below the face of the gear hub after installation.3. Be sure the oil hole in the shaft for idler gear (1) is open. Put idler gear (1) and plate (2) in position on the shaft. Install the bolts that hold them. 4. Make sure Tool (C) is in position in the groove of the fuel injection pump camshaft.5. Put fuel injection pump drive gear (5) in position on the fuel injection pump camshaft. Put washer (6) in position on the gear with the largest diameter toward the front of the engine. Install bolt (7), and tighten it to a torque of 7 N m (5 lb ft). Make sure bolt (7) does not turn while the flywheel is being turned.6. Remove the timing bolt from the flywheel, and use Tool (B) to turn the flywheel in the opposite direction of engine rotation. Turn the flywheel until the "C" mark on the crankshaft gear moves 30°.7. Turn the flywheel in the direction of engine rotation until the timing bolt can be installed in the flywheel and the "C" marks are in alignment. This will remove all of the backlash from the timing gears.8.

Have questions with 105025-4370?





Group cross 105025-4370 ZEXEL

9 432 612 954 
NP-DLLA155SND160 
 
NOZZLE

Nissan-Diesel 

9 432 612 933 
NP-DLLA155SM431 
16620NB005 
NOZZLE

Komatsu 

9 432 612 966 
NP-DLL140SM432 
6215117720 
NOZZLE
9 432 612 934 
NP-DLLA133SM433 
6212163720 
NOZZLE
9 432 612 935 
NP-DLLA133SM434 
6212163820 
NOZZLE

Niigata-Tekkou 

9 432 612 938 
NP-DLLA155SM435 
75L32980A 
NOZZLE

Mitsubishi-Heav 

9 432 612 944 
NP-DLLA160SM436 
33A6113500 
NOZZLE

Hino 

105025-4370  
9 432 612 939 
NP-DLLA157SM437 
236402951A 
NOZZLE
9 432 612 946 
NP-DLLA157SM438 
236402781A 
NOZZLE

Komatsu 

9 432 612 998 
NP-DLLA155SM439 
6215123620 
NOZZLE
Back to top